• Title/Summary/Keyword: 보수공법

Search Result 384, Processing Time 0.055 seconds

An Analysis of Maintenance Cost of Preventive Optimized-Rehabilitation Area Method in Asphalt Concrete Pavement (예방적 최소단면 보수공법 적용 아스팔트 도로포장의 유지관리 비용분석)

  • Kim, Nak-Seok;Hong, Eun-Cheol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.4
    • /
    • pp.45-51
    • /
    • 2009
  • The paper presents the economic analysis of optimized-rehabilitation area method considered as one of the preventive maintenance methods in asphalt concrete pavement. The optimized-rehabilitation area was selected based on the analysis of traffic lane characteristics. The main concept of the selected method was to minimize the maintenance cost. The effective width of traffic lane in this method was 70 cm of each wheel path. According to the traffic survey conducted in this research, more than 95% of vehicles passed within the width of each wheel path. The new preventive optimized-rehabilitation area method showed less maintenance cost than the conventional overlay. In addition, traffic congestions and the user cost can be reduced. The research results revealed that the total maintenance cost was reduced by 35% by using the new method compare to the conventional one.

A Study on Field Application of Preventive Maintenance Method for Flexible Pavements (연성포장의 예방적 유지보수공법에 대한 현장 적용성 연구)

  • Kim, Nakseok;Jin, Jung-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.565-569
    • /
    • 2011
  • This paper presents minimum area repair method that is one of the preventive maintenance techniques in asphalt concrete pavements. In this method, a 70cm-width as an effective repair zone was suggested considering the conventional longitudinal damages (rutting and fatigue cracking) in early stages. In addition, the repair zone can be readjusted according to the pavement damage levels. A field test bed was constructed to verify the adaptness for the repair method. Test results revealed that the minimum area repair method can be adopted as a preventive maintenance technique in flexible pavements to recover an appropriate serviceability level. The preventive maintenance method may be one of the major maintenance methods of flexible pavements with an appropriate application. It is also noted that the method may be a long term maintenance cost effective and pavement life ensuring one.

Applicability of Epoxy Injection Method In Cracked RC Beams Considering Pre-Loading Conditions (재하상태를 고려한 RC 보의 에폭시 주입 보수공법의 적용성 평가)

  • Hong Geon-Ho;Shin Yeong-Soo
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.1 s.79
    • /
    • pp.88-93
    • /
    • 2004
  • The objective of this study was to investigate applicability of epoxy injection method to cracked RC beams and structural behavior of repaired RC beams considering pre-loading conditions. For this purpose, five test beams were fabricated under two experimental variables. The main variables of this experimental study were pre-loading conditions and repair methods. The two pre-loading conditions were selected as $70\%$ and $90\%$ of nominal strength and the repair methods were to repair the cracked RC beams under free loading after crack and sustained loading. The comparative study was executed to evaluate effects of pre-loading conditions on the structural behavior of the cracked RC beams after crack-repair. The strains of reinforcement and concrete and deflections of beams at each loading step were measured and evaluated. As the results of this study, repair methods have much influence on structural behavior of epoxy injected RC beams and epoxy injection method for cracks of RC structures is appeared to be efficient.

Development of Rehabilitation Criteria of National Highway Pavement (국도 아스팔트 콘크리트 포장의 보수공법 결정 기준 연구)

  • Kim, Da-Hae;Kwon, Soo-Ahn;Suh, Young-Chan;Lim, Kwang-Soo
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.37-44
    • /
    • 2009
  • Currently the reasonability of threshold values for rutting and cracking does not clearly defined at the Pavement Rehabilitation Decision Tree on national highway PMS(Pavement Management System). The goal of this study is to provide the reasonable threshold values for the national highway asphalt concrete pavement rehabilitation. To achieve this goal, test section that represents typical asphalt concrete pavement of national highway was selected and pavement export were participated. Pavement condition survey has been conducted and pavement performance data at the selected roadway section were analyzed. From this study, reasonable threshold values of Pavement Rehabilitation Decision Tree were suggested based on the pavement expert's engineering judgement. In terms of crack repairs, the application of overlay after cutting is required to deteriorated area where existing crack ratio is over 35% and just overlay is required to where crack ratio is over 20%. On rutting, rut depth over 13mm is required to overlay after cutting and rut depth over 10mm is just needed to overlay.

  • PDF

The Physical Properties of Port Type Crack Injection Method Using Latex Elastic Storage Tube (라텍스 탄성 저장관을 활용한 포트식 균열주입 공법의 물리적 특성에 관한 연구)

  • Kim, Eun-Young;Sho, Kwang-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.2
    • /
    • pp.68-75
    • /
    • 2018
  • In this study, to solve the problems of the conventional crack repair and injection method, high elasticity latex was used as the material of the storage tube to withstand the high pressure in the center part differently from the general port. When the repair solution was injected into the crack part, The TPS method was developed so that the air existing in the TPS can be discharged. In addition, a new infusion port in which a valve blocking the backflow of the remediation solution was installed at the injection port was developed and the physical characteristics of the port were analyzed. As a result of the evaluation, it was found that the filling rate of the remedial solution was improved compared to the existing ordinary injector method, and the cracks were completely filled in the test conditions. Compressive strength and tensile strength after repair showed about 20% decrease after repair in case of using ordinary injector method, while TPS method showed about 2~7% increase after repair. The results of this study showed that the injection port method using the elastic storage tube increased the injection performance and the quality after repair compared to the conventional injector method. The result of this study is expected to be utilized as the basic data for application and commercialization of the result to the practical structure.

Application of the Main Algorithm of Pavement Management System For the Korea Expressway System (고속도로 포장유지관리체계 논리적용)

  • Suh, Young-Chan;Park, Kyung-Boo
    • International Journal of Highway Engineering
    • /
    • v.3 no.2 s.8
    • /
    • pp.141-147
    • /
    • 2001
  • Maintenance cost for managing the whole network of Expressway system in Korea increases rapidly with the increase of the total length of the system. Implementation of the Pavement Management System(PMS) is essential for efficient management of the Expressway with a limited budget. The purpose of this study is to develop the main algorithm of PMS for Korea Expressway System and to associate the algorithm with database and the Highway Geographic Information System(HGIS) recently developed. Emphasis is laid on developing the algorithm as easy as possible, so that the users can use the PMS without practical difficulty. PMS is not the decision maker, but just a supporting system for the user. The algorithm is designed in such a way that the users can modify the decision criteria if necessary. The user is the one who makes the final decision of the priority and the maintenance alternatives. The users can also inquire the current condition of the whole Expressway network in detail by association of the database and the algorithm with HGIS.

  • PDF

Improvement Measures for the Defect Determination and the Application of Repair Method for Interlayer Cracks in Apartment Houses (공동주택 층간균열의 하자판정 및 보수공법 적용에 대한 개선방안)

  • Choi, Sangjin;Shin, Manjoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.23-33
    • /
    • 2022
  • Cracks, which account for the largest proportion of defect lawsuits in apartment buildings, are not clear on the criteria for defect determination, so judgments about defects are mixed. Interlayer cracks, which account for most of the crack defect judgment amount, tend to be judged as defects regardless of the crack width or condition, and repair methods are mostly set uniformly. This starts from the problem that the standards of the Ministry of Land, Infrastructure and Transport and the Construction Appraisal Practice, which the courts use as standards, do not match. It is necessary to establish a defect determination standard that can be applied to all stakeholders through the amendment of laws and the revision of the Court Appraisal Practice. In addition, it is necessary to apply the crack repair method according to the width and condition of the interlayer crack. If the defect determination and the application of the repair method for cracks are rationalized, it could serve as an opportunity to change the current trend of defect disputes that rely only on litigation.