• 제목/요약/키워드: 보상금관리시스템

Search Result 8, Processing Time 0.025 seconds

A Study on the Remuneration Management System for Legal Deposit of Digital Products (디지털자료 납본 보상금관리시스템에 관한 연구)

  • Lee, Seok-Hyoung;Kim, Kwang-Young;You, Beom-Jong;Kwak, Seung-Jin
    • Journal of Korean Library and Information Science Society
    • /
    • v.40 no.1
    • /
    • pp.233-251
    • /
    • 2009
  • The National Library of Korea recently proposed a draft of an Act on Legal Deposit and Use for the Online Digital Products and researches about deposit system and remuneration of the digital products are in progress. Based on the law of library and copyright, remuneration of deposit and use products is paid. A draft of a proposed law include information about the remuneration payment. For these reasons, the method for efficient remuneration management is required. In this paper, we propose effective remuneration management system which follows a draft of an Act on Legal Deposit and Use for the Online Digital Products.

  • PDF

Predicting Construction Project Cost using Sensitivity Analysis in Stochastic Project Scheduling Simulation (SPSS) (확률 통계적 일정 시뮬레이선 - 민감도 분석을 이용한 최종 공사비 예측)

  • Lee Dong-Eun;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.80-90
    • /
    • 2005
  • Activity durations retain probabilistic and stochastic natures due to diverse factors causing the delay or acceleration of activity completion. These natures make the final project duration to be a random variable. These factors are the major source of financial risk. Extending the Stochastic Project Scheduling Simulation system (SPSS) developed in previous research; this research presents a method to estimate how the final project duration behaves when activity durations change randomly. The final project cost is estimated by considering the fluctuation of indirect cost, which occurs due to the delay or acceleration of activity completion, along with direct cost assigned to an activity. The final project cost is estimated by considering how indirect cost behaves when activity duration change. The method quantifies the amount of contingency to cover the expected delay of project delivery. It is based on the quantitative analysis to obtain the descriptive statistics from the simulation outputs (final project durations). Existing deterministic scheduling method apply an arbitrary figures to the amount of delay contingency with uncertainty. However, the stochastic method developed in this research allows computing the amount of delay contingency with certainty and certain degree of confidence. An example project is used to illustrate the quantitative analysis method using simulation. When the statistical location and shape of probability distribution functions defining activity durations change, how the final project duration and cost behave are ascertained using automated sensitivity analysis method

KOSHA 18001 - 자율안전관리체계 구축의 "건설업 안전보건경영시스템"

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.261
    • /
    • pp.73-79
    • /
    • 2012
  • 최근 몇 년간 지속된 국내 건설경기 침체로 설비건설업계는 많은 어려움을 겪고 있다. 또한 금년 1월 1일부터 기계설비공사의 겸업제한이 폐지되면서 일반건설사도 기계설비의 면허취득이 가능해지는 등 설비건설업계에 많은 변화가 일고 있다. 이처럼 개방과 불황의 파고를 넘기 위해서는 기업의 경쟁력 강화가 그 어느 때보다도 절실히 요구되고 있다. 기업은 신기술 신공법 개발 및 알뜰경영으로 경쟁력을 강화시키는 것도 중요하지만 전사적인 안전관리로 근로손실에 의한 생산성 저하, 재해보상금 지급 등 안전사고와 관련한 지출을 크게 줄이는 것도 경쟁력 강화의 한 요인으로 주목되고 있다. 최근들어 안전 보건 및 환경 등에 대한 관심이 높아지면서 건설업계는 기업경영의 우수성을 객관적으로 평가받을 수 있는 안전보건경영시스템 인증 취득이 늘어나고 있다. 더구나 설비건설업계의 숙원사업인 분리발주와 유사한 주계약자공동도급이 올해부터 기계설비공사에 적용되면서 일반건설업체도 기계설비건설업체와 공동도급을 받기 위해 노력하고 있다. 이럴 때 설비건설업체가 경쟁에서 우위를 선점할 수 있는 요건은 무엇일까? 기술력, 신뢰도 등 여러 가지 요인이 있겠지만 안전보건경영시스템 인증도 한 몫 할 수 있을 것으로 예상된다. 지난 2001년 안전보건경영시스템 인증이 도입된 이후 지난 3월 30일 현재 설비건설업계는 14개 업체가 인증을 취득했다. 본지는 지난 2006년 9월호에 건설업 안전보건경영시스템을 특집으로 소개한 바 있다. 최근들어 안전보건경영시스템에 대한 관심이 높아지면서 이에 대한 문의가 많아짐에 따라 이번 호에는 안전보건경영시스템에 대해 다시 한번 알아본다.

  • PDF

Development of Submerged Land Compensation Management Geographic Information System (수몰지구 보상관리 지리정보시스템 구축에 관한 연구)

  • Sim, Jeung-Min;Lee, Chang-Kyung
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.2 s.32
    • /
    • pp.29-37
    • /
    • 2005
  • The compensation data for submerged land have been filed in the form of document or managed with spread sheet like Excell up to now. In the case of dam or highway construction, huge compensation data for the submerged or included land have been managed inefficiently by the administrative manpower. Moreover, where and how to keep the enormous data becomes big problems. In response to the requirements, an submerged land compensation management system based on the location and property information of parcels was developed. The compensation management system has many functions including site searching for compensation, compensation money computing, and compensation data managing. It is expected that the submerged land compensation management system creates various information effects.

  • PDF

A Study on Development of Load as a Resource on Power Market Stabilization (전력시장 안정화를 위한 민간부하 활용 방안에 대한 연구)

  • Lee, Jin-Ho;Jung, Ju-Hwan;Seo, Jang-Cheol;Choe, Jong-Woong
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.174-176
    • /
    • 2002
  • 전력산업 구조개편이 진행되면서 국내의 수요관리에 대한 정책도 변화하고 있는 실정이다. 수용 가에 계량 및 원격제어를 할 수 있는 시스템이 설치되고 이를 통하여 원격에서 부하를 하단하고 참여하는 수용가에 보상금을 지급하는 방식인 직접부하제어 방식은 부하 관리 자원 이용 가능성의 우의, 성과계량의 용이, 비용 효과 증대 동의 이유로 인하여 최근 많은 각광을 받고 있으며 한국전력, 에너지 관리공단에 의하여 시범적으로 국내에 도입되었다. 또한, 다수의 수용가에 대한 대표성을 가지며 수용가의 부하를 관리하여 직접부하제어를 대 행하는 민간기관인 부하관리 사업자가 국내에 생겨나게 되었다. 부하관리 사업자는 약정을 체결한 다수의 수용가 부하를 자원으로 하여 현재의 수요관리에서 직접부하 관리에 참여 할 수 있으며 향 후 도매경쟁체제에서는 확보한 부하 자원을 이용하여 다양한 방법으로 시장에 참 여할 수 있는 기회를 가지게 된다. 부하관리 사업자를 활성화하기 위해서는 수익을 창출할 수 있는 사업모델이 필요하며 활성화 되면 활용할 수 있는 부하자원의 양이 많아지게 되어 전력시장의 안정화를 위한 역할을 할 수 있게 될 것으로 기대된다.

  • PDF

Improving the Disaster Management Service in the Demander-Centered Approach (수요자 관점에서 접근한 재난관리서비스의 개선 방안)

  • Yoo, Hyun-Jung;Lee, Jae-Eun;Rho, Jin-Chul;Kim, Gyum-Hun
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.5
    • /
    • pp.224-236
    • /
    • 2008
  • To enhance the quality of disaster management service, the paradigm shift is necessary from the supplier-centered approach to demander-centered approach. In this paper, demander means all the policy actors that participate in the field of disaster such as central & local governments, emergency rescue systems, civil volunteer groups as well as the disaster victims. In this study, we analyze the current problems of disaster management service in demanders' point of view through in-depth interviews and then address suggestions based on each entity's recognitions and understandings related. The results are as follows: 1) Lack of systemicity in the current disaster management service. 2) The mutual distrust and understanding among the policy actors participating in the disaster site. 3) In the field of disaster, not only the disaster victims but also people related to entities are deprived of a stable living due to a long period of rescue activities. Furthermore, the conflicts derived from allocations of the aid fund can bring about the collapse of local community involved in disaster. 4) The life of the disaster victims that have been damaged mentally and financially is earnestly necessary to be conveniently served by disaster management service.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

동물 결핵

  • Jo, Yun-Sang
    • Journal of the korean veterinary medical association
    • /
    • v.44 no.9
    • /
    • pp.803-818
    • /
    • 2008
  • 동물의 결핵은 Mycobacterium bovis의 감염에 의한 만성 소모성 질병이며 인수공통전염병이다. 동물로부터 사람으로의 결핵 전염은 생유 섭취하던 시대에 상당히 많이 보고되었다. 우유의 살균처리와 소에서 피내진단에 의한 양성우 살처분 및 보상금 지급 정책을 전개하면서 M. bovis의 사람전염은 급격히 감소하였다. 소 결핵은 우리나라에서 연간 0.15% 내외의 발생을 보이고 있으며, 발생의 주원인으로는 외부입식소, 인근발생농장, 과거발생농장의 사후관리소홀 등이다. 사람 결핵의 주원인균인 M. tuberculosis와 M. bovis는 유전체가 99.9% 유사하며, M. bovis를 M. tuberculosis의 아종으로 분류하기도 한다. 두 세균은 M. tuberculosis complex에 속하며, M. tuberculosis와 M. bovis이외에도 M. africanum, M. canettii, M. microti, M. pinnipedii 등이 있다. M. bovis는 M. tuberculosis complex중에서 가장 넓은 숙주범위를 가진다. M. bovis의 대표적인 숙주는 종이름에도 나타나 있듯이 소이다. 소결핵 전파원으로서는 M. bovis에 감염된 소가 가장 중요하다. 소 이외에도 면양, 산양, 말, 돼지, 사슴, 엘크, 영양 (antelope, kudus, elands, sitatungas, oryxes, addaxes), 개, 고양이, 흰족제비 (ferrets), 낙타, 여우, 밍크, 오소리, 쥐, 영장류, 라마, 맥 (tapirs), 코끼리, 코뿔소 (rhinoceroses), 주머니쥐, 땅다람쥐 (ground squirrels), 수달 (otters), 물개, 산토끼 (hares), 두더쥐 (moles), 너구리 (raccoons), 코요테, 사자, 호랑이, 표범, 살쾡이 (lynx) 등에 감염될 수 있으나, 대부분 종결숙주 (spillover host)로 가축의 결핵방제가 유지되고 있는 국가에서는 야생동물 결핵의 가축 전염이 문제시되고 있다. M. bovis는 주로 호흡기와 소화기를 통하여 감염되며, 결핵결절이 형성되는 부위를 관찰하면 감염경로를 추정할 수 있다. 결핵에 감염되면, 초기에는 뚜렷한 임상증상을 보이지 않으나, 아침, 추운 날씨, 또는 운동 중에 심한 기침을 하며, 호흡곤란을 일으킬 수 있다. 결핵은 감염되어도 대부분 무증상이기 때문에 피내진단, 결핵결절 병리소견, 원인균 분리 등에 의해 진단하여야 한다. 감염된 결핵균은 탐식세포에 탐식되어 특징적인 육아종성 결절 병변으로 진행된다. 현재 결핵은 피내진단과 결핵결절 병리소견 등에 의해 판정하고 있다. 최신 진단법으로는 피내진단을 대체할 수 있는 인터페론 감마 검사법과 우군의 결핵 스크리닝과 말기 결핵 검사에 우수한 항체진단법이 개발되어 있다. 그러나, 소 결핵 근절을 위해서는 일관성있는 진단법과 진단기준을 적용하는 것이 중요한 성공요인중 하나이다. 소결핵 청정국인 호주와 캐나다에서는 피내진단과 도축장 결절검사를 결핵 양성우 색출방법의 근간으로 삼고 있으며, 소결핵 근절의 최종단계에 이르러서는 특이적인 검사법을 적용하였지만, 근절목적상 민감성이 높은 피내진단법을 사용하였다. 이와 더불어, 피내진단 양성우의 부검소견과 원인균 분리를 통해 결핵을 확진하여 출처농장의 역추적 검사를 통하여 결핵 양성소를 제거하였다. 한편, 결핵의 농장간 및 지역간 전파방지를 위해 결핵 청정농장과 결핵 오염농장, 결핵 청정지역과 결핵 오염지역 구분을 통하여 결핵 오염농장과 결핵 오염지역으로부터 결핵 청정농장과 결핵 청정지역으로의 이동전 결핵 검진을 통해 개체 이동에 따른 결핵 전파를 근본적으로 차단하는 시스템을 엄격히 적용한 것이 주요한 성공 요인중 하나였다. 호주 결핵 근절정책 성공요인을 요약하면, 일관성 있는 결핵진단법 적용, 양성우 출처농장의 철저한 역추적 검사, 개체 이동전 결핵 음성증명 확인, 농가단체의 경제적 및 방역상 적극적인 지원 및 협조 결핵의 지속적인 모니터 링과 현장요구에 부응하는 방제신기술의 지속적인 연구개발 등을 들 수 있다. 최근 들어 국내 동물 결핵은 소, 특히, 한우의 결핵발생이 증가하고 있으며, 사슴 결핵발생도 증가하고 있다. 농장간 및 지역간에 결핵 감수성 가축, 특히, 소와 사슴의 거래가 아주 복잡하게 이루어지고 있는 현실을 고려할 때, 결핵전파의 주원인인 결핵감염 소나 사슴의 농장내 반입을 철저히 차단해야 할 것이다. 이때, 개체 검사는 물론이고, 출처농장에 대한 결핵 음성을 확인한 후 입식하여야 할 것이며, 입식 후에도 60일정도 격리사육하면서 피내진단등 결핵검진 후 음성인 경우에만 합사하여야 할 것이다. M. bovis는 사람을 비롯한 거의 모든 온혈동물에서 결핵을 일으킬 수 있기 때문에, 결핵 감염소로 판정된 농장 종사자는 각 시도 보건소의 협조를 받아 결핵검진을 받도록 해야 한다. 농장 가축에 접촉할 수 있는 야생동물의 접촉을 차단하여야 하며, 특히, 농장 사료의 야생동물에 의한 오염을 방지할 수 있는 사료창고관리를 철저히 해야 한다. 결핵 감염소를 다룰 때는 분비물 또는 가검물에 의해 감염될 수 있기 때문에 개인방역장비 - 방역복, 마스크, 비닐장갑, 비닐장화 - 를 착용한 상태에서 다루어야 한다. 특히, 결핵 감염소를 매몰 또는 소각하는 과정에서 결핵 감염소의 배설물 및 분비물 처리를 철저히 하여야 한다. 모든 작업을 마친 후에는 개인방역장비, 매몰 또는 소각에 사용하였던 장비 등을 청소 및 소독하고 필요시 소각 또는 매몰하여야 하며, 개인감염위험과 타인 감염위험을 방지하기 위해 노출부위를 세척하여야 한다.

  • PDF