• Title/Summary/Keyword: 변동하중

Search Result 269, Processing Time 0.03 seconds

A Case Study on Axial Forces of Cable-band Bolts in Domestic Suspension Bridge (국내 현수교량의 케이블 밴드볼트 축력관리 및 검토사례)

  • Park, Si-Hyun;Jung, Woo-Young;Kim, Hyun-Woo;You, Dong-Woo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.2
    • /
    • pp.1-7
    • /
    • 2018
  • Suspension bridge cables made of high strength steel wires require periodical maintenance in accordance with the axial force of cable-band bolts, since the bolts in suspension bridges can undergo tension decrease due to creep of cable wires, bolt relaxation, load fluctuation, and cable re-arrangement, etc. Consequently, this study is aimed at investigating and subsequently evaluating the critical factors with respect to the bolt tension-decrease phenomenon in SR suspension bridge in Korea, based on field monitoring, theoretical studies, and field record management works. From the observation, it is interesting to note that the decrease in the bolt tension force is typically accompanied by plastic deformation of the zinc plating layers in the cable wires. In addition, a framework corresponding to generic methodologies to characterize the deformation in terms of the bolt tension-decrease and long-term history management has been developed in this exploratory study.

A Development of Dam Risk Analysis Model Using Bayesian Network Model in Hydrologic (Bayesian Network(BN) 모형을 활용한 수문학적 댐 위험도 해석 기법 개발)

  • Kim, Jin Young;Kim, Jin-Guk;Kwon, Hyun-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.501-501
    • /
    • 2015
  • 댐과 같은 수공구조물의 치수능력부족은 구조물의 파손이나 붕괴로 직결되며, 대규모 재산피해와 인명피해가 불가피하다. 또한 최근 기후변화 현상에 의해 발생되고 있는 예상치 못한 큰 강우와 홍수는 댐 안전을 저하하는 요소로 간주되며, 복합적으로 발생시 댐의 치수능력이 크게 저하되어 댐 파괴에 영향을 미칠 가능성이 크다. 또한 ICOLD, 세계대댐회 등의 조사 결과 댐 파괴에 큰 영향을 미치고 있는 수문학적 요소로서 예상치 못한 강우, 홍수 및 월류로 조사되었다. 이러한 이유로 수문학적 위험인자를 효과적으로 고려하기 위해 2000년도 이후 선진국에서는 위험도 해석 기법을 기반으로 파괴모드, 다양한 하중조건 등을 조합하여 위험도 해석을 통해 댐의 안전도 검토를 실시하고 있다. 따라서 최근 증가하는 기상변동성을 능동적으로 고려하기 위해서는 위험도 해석기반의 수공구조물 안정성 평가기법을 기반으로 하는 종합적인 위험도 해석 방안수립이 요구된다. 이러한 이유로 본 연구에서는 BN 모형 기반의 댐 위험도 적용에 앞서 실증댐을 대상으로 분석을 수행하였으며, 분석 절차는 다음과 같다. 첫째, ICOLD 및 세계대댐회 등 다양한 논문, 보고서 등을 조사하여 댐 붕괴에 가장 큰 영향을 미치는 수문학적 파괴인자를 도출하였다. 둘째, BN 모형 구축시 각 노드는 앞서 도출된 수문학적 파괴인자를 이용하였으며, 각 파괴인자에 적합한 확률분포형을 부여하였다. 마지막으로, 노드별 임계값을 부여하여 상황별 파괴인자의 변화 양상을 도출하였다. 본 연구의 결과로 인해 연구대상댐의 가장 취약한 수문학적 파괴인자 도출이 가능하며, 댐의 보수 보강시 우선순위 의사결정의 지원이 가능 할 것으로 판단된다.

  • PDF

Proposal of Return Period and Basic Wind Speed Map to Estimate Wind Loads for Strength Design in Korea (강도설계용 풍하중 평가를 위한 재현기간과 기본풍속지도의 제안)

  • Ha, Young-Cheol
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.2
    • /
    • pp.29-40
    • /
    • 2018
  • Strength design wind loads for the wind resistance design of structures shall be evaluated by the product of wind loads calculated based on the basic wind speed with 100 years return period and the wind load factor 1.3 specified in the provisions of load combinations in Korean Building Code (KBC) 2016. It may be sure that the wind load factor 1.3 in KBC(2016) had not been determined by probabilistic method or empirical method using meteorological wind speed data in Korea. In this paper, wind load factors were evaluated by probabilistic method and empirical method. The annual maximum 10 minutes mean wind speed data at 69 meteorological stations during past 40 years from 1973 to 2012 were selected for this evaluation. From the comparison of the results of those two method, it can be found that the mean values of wind load factors calculated both probability based method and empirical based method were similar at all meteorological stations. When target level of reliability index is set up 2.5, the mean value of wind load factors for all regions should be presented about 1.35. When target level of reliability index is set up 3.0, wind load factor should be presented about 1.46. By using the relationship between importance factor(conversion factor for return period) and wind load factor, the return periods for strength design were estimated and expected wind speeds of all regions accounting for strength design were proposed. It can be found that return period to estimate wind loads for strength design should be 500 years and 800 years in according to target level of reliability index 2.5 and 3.0, respectively. The 500 years basic wind speed map for strength design was suggested and it can be used with a wind load factor 1.0.

On-line Finite Element Model Updating Using Operational Modal Analysis and Neural Networks (운용중 모드해석 방법과 신경망을 이용한 온라인 유한요소모델 업데이트)

  • Park, Wonsuk
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.1
    • /
    • pp.35-42
    • /
    • 2021
  • This paper presents an on-line finite element model updating method for in-service structures using measured data. Conventional updating methods, which are based on numerical optimization, are not efficient for on-line updating because they generally require repeated eigenvalue analyses until convergence criteria are met. The proposed method enables fully automated on-line finite element model updating, almost simultaneously with vibration measurement, without any user intervention or off-line procedures. The automated covariance-driven stochastic subspace identification (Cov-SSI) method is utilized to identify modal frequencies and vectors, and the identified modal data is fed to the neural network of the inverse eigenvalue function to produce the updated finite element model parameters. Numerical examples for a wind excited 20-story building structure shows that the proposed method can update the series of finite element model parameters automatically. It is also shown that sudden changes in the structural parameters can be detected and traced successfully.

Time-dependent Parametric Analyses of PSC Composite Girders for Serviceability Design (사용성 설계를 위한 PSC 합성거더교의 시간의존적 변수해석)

  • Youn, Seok-Goo;Cho, Sun-Kyu;Lee, Jong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5A
    • /
    • pp.823-832
    • /
    • 2006
  • To ensure the serviceability requirements of PSC composite girder bridges, it is essential to predict the stresses and deformations of the structure under service load conditions. Stresses and deformations vary continuously with time due to the effects of creep and shrinkage of concrete and relaxation of prestressing steel. The importance of these time-dependent effects is much more pronounced in precast prestressed concrete structures built in stages than in those constructed in one operation. In this paper, time-dependent analyses for PSC composite bridges using 30m standard girders have been conducted considering with the variation of the times of introducing initial prestressing forces and casting concrete. A computer program has been developed for the time-dependent analysis of simple or continuous PSC composite girders and parametric studies are conducted. Based on the numerical results, it is investigated the long-term behaviors of PSC composite girder bridges and discussed the limitations of the current codes for the prestress loss.

Analytical Study on Seismic Performance Assesment of Reinforced Concrete Shear Wall using High-Strength Reinforcing Bar (고강도 철근을 적용한 철근콘크리트 전단벽체의 내진성능평가를 위한 해석적 연구)

  • Cheon, Ju-Hyun;Kim, Kyung-Min;Park, Kwang-Min;Shin, Hyun-Mock
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.2
    • /
    • pp.138-145
    • /
    • 2017
  • The purpose of this study is to establish a reasonable analytical method for the estimation of overall behavior characteristic from cracking to yielding of rebar and crushing of concrete and seismic performance of reinforced concrete shear wall with high-strength reinforcing bar. A total of 8 specimens of reinforced concrete walls which have constant aspect ratio and a variety of variables such as reinforcement ratio, reinforcement yielding strength, reinforcement details, concrete design strength, section shape and whether lateral restraint hoop were selected and the analysis was performed by using a non-linear finite element analysis program (RCAHEST) applying the proposed constitutive equation by the authors. The mean and coefficient of variation for maximum load from the experiment and analysis results was predicted 1.04 and 8%. The mean and coefficient of variation for displacement corresponding maximum load from the experiment and analysis results was predicted 1.17 and 19% respectively. The analytical results were predicted relatively well the fracture mode and the overall behavior until fracture for all specimens. These results are expected to be used as basic data for application of high-strength reinforcing bar to design codes in the future.

Interpretation of geological structures and stratigraphy around the Kita-Yamato Bank in the East Sea (동해 키타-야마토 뱅크 주변 해역의 지질구조 및 퇴적층서 해석)

  • Huh Sik;Yoo Hai Soo;Park Chan Hong;Han Sang Joon;Jou Hyeong Tae
    • The Korean Journal of Petroleum Geology
    • /
    • v.9 no.1_2 s.10
    • /
    • pp.16-23
    • /
    • 2001
  • The study area in the East Sea is located on the northeastern margins of the Ulleung Basin near the Kita-Yamato Bank. The research area provides the important clue to the development of Miocene basins which are characterized by the normal faults and volcanic activities related to rifting in the continental crust. Kita-Yamato Bank is a small sediment-filled graben which was formed by failed rifting in the Early Miocene. The basins rapidly vary the bathymetry, depth of acoustic basement and thickness of sedimentary layer. The tension in the study area caused the extensional lithospheric deformation before/during the Early Miocene. In consequence, tectonic forces resulted in the depression or subsidence of basement from continental rifting in the Kita-Yamato Bank followed by the opening of the Ulleung Basin, and caused the onset of graben or half-graben structure bounded by large blocked syn-rift faults. Afterward no significant tectonic deformation exists, with the consequence that post-rift normal faults with small heave were formed and reactivated by the resultant forces such as tectonic subsidence, sediment loading and volcanic activity. The Cenozoic sediment layer has a maximum thickness of 1.0 s along the center of the graben or half-graben, which overlies the consolidated acoustic basement. Seismic units V and IV supposed to be syn-rift sedimentary rocks are deformed by both the volcanic activities and numerous basement-involved normal faults induced from extension. In the uppermost layer, slump scars resulted from the slope failure are recognized.

  • PDF

Experimental Study on the Effective Temperature Calculation of Concrete Box Girder Bridge (콘크리트 박스거더교의 설계 유효온도 산정을 위한 실험적 연구)

  • Lee, Seong-Haeng
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.740-745
    • /
    • 2020
  • To calculate the reasonable design temperature load of a concrete box girder bridge, one bridge test specimen was made. The temperature gauges installed on the bridge test specimen measured 48 sets of temperature per day at 30-minute intervals during the summer and winter periods of one year. The temperature measured at each station was treated statistically to calculate the trend line and standard error, and the temperature distribution and trend line at the representative station were presented. The maximum effective temperature and the lowest effective temperature were calculated from the air temperature suggested by Euro code. The maximum effective temperature was calculated to be 1.5 to 2℃ higher than the Euro code at 35℃ and above. In comparison, the lowest effective temperature was 0.5 to 1.1℃ lower at -13℃ to-19℃. Compared to the effective temperature of this study according to the highest and lowest 50-year frequency of the Yangsan region, the highest effective temperature was 4.7℃ higher, and the lowest effective temperature was 4.5℃ lower. Considering the increasing climate change and reflecting the results of this analysis, it is deemed necessary to make the current temperature design standards larger.

Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City (연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로)

  • Heo, Kang Kug;Park, Hyung Keun;Ahn, Byung Chul;Min, Byeong Uk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.705-713
    • /
    • 2016
  • For the soft ground construction, the factors not considered in the design stage occurs in the construction stage so that they cause the increase of the construction cost due to the structural stability and the design change. The subject of the study is the construction section of the industrial complex access road made in the Ochang region of Chungcheongbuk-do. The study is concerned with selecting the soft ground handling method such as the replacement method using rock debris and the surcharge reflecting the service load as the soft ground handling measure and analyzing the effect of reducing the construction cost with the stability of structures and the reduction of the construction period. The soft ground in the study section consists of sandy and cohesive soil and is 2.4m to 5.5m deep. It is distributed unevenly between the 1.5m to 5.9m stratums under the ground surface. Settlement is not serious, but the future uneven settlement and difference are expected so that the future settlement behavior is estimated by analyzing the site measurement results after the soft ground treatment. Moreover, in consideration of the regional characteristics and economic efficiency, soil with good quality is replaced with rock debris as the replacement material so that 29% of the construction cost is reduced due to the increase of stability and the reduction of duration. If the estimation of the dispersion of the pore water pressure within the dam body and the change of the underground water level and the relation of the actually measured soft ground with consolidation is studied further on the basis of the study, it is expected that the behavior of the soft ground will be correctly estimated in various site conditions.

Analytical Study on Behavior Characteristic of Shear Friction on Reinforced Concrete Shear Wall-Foundation Interface using High-Strength Reinforcing Bar (고강도 전단철근을 사용한 철근콘크리트 전단벽체-기초계면에서의 전단마찰 거동특성에 대한 해석적 연구)

  • Cheon, Ju-Hyun;Lee, Ki-Ho;Baek, Jang-Woon;Park, Hong-Gun;Shin, Hyun-Mock
    • Journal of the Korea Concrete Institute
    • /
    • v.28 no.4
    • /
    • pp.473-480
    • /
    • 2016
  • The purpose of this study is to provide analytical method to reasonably evaluate the complicated failure behaviors of shear friction of reinforced concrete shear wall specimens using grade 500 MPa high-strength bars. A total of 16 test specimens with a variety of variables such as aspect ratio, friction coefficient of interface in construction joint, reinforcement details, reinforcement ratio in each direction, material properties were selected and the analysis was performed by using a non-linear finite element analysis program (RCAHEST) applying the modified shear friction constitutive equation in interface based on the concrete design code (KCI, 2012) and CEB-FIP Model code 2010. The mean and coefficient of variation for maximum load from the experiment and analysis results was predicted 1.04 and 17% respectively and properly evaluated failure mode and overall behavior characteristic until failure occur. Based on the results, the analysis program that was applied modified shear friction constitutive equation is judged as having a relatively high reliability for the analysis results.