• Title/Summary/Keyword: 배전계통

Search Result 1,189, Processing Time 0.026 seconds

New Businesses and Challenges related to Japan's Electricity System Reform (일본 전력시스템개혁에 따른 지능형 사업 발전과 도전과제)

  • Park, Chan-Kook;Kim, Yang-Soo
    • Journal of Digital Convergence
    • /
    • v.13 no.9
    • /
    • pp.1-9
    • /
    • 2015
  • The Japanese government has carried out the power industry reform in three phases to supply power stably, control the rise of electricity tariff, and expand consumer choices. The reform of the Japanese electric power industry fosters new kinds of businesses as well as changes the competitive structure in which the enterprises participating electricity business compete. However, for the power industry restructuring to be done smoothly, the accompanying tasks should be carried out. Korea has also been devoting a lot of efforts to cultivate various types of new industries based on the convergence of energy and information and communications technology. If there are the same kinds of new industries between the two countries, the progresses of the industries can be compared to each other over a period of time.

A Study on the Characteristic of Power Consumption and Design of the Electrical Installations for the Inverter Controlled Elevator (인버터제어 승강기의 전력소비 특성과 전원설비 계획에 관한 연구)

  • 이기홍;성세진
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.2
    • /
    • pp.57-63
    • /
    • 2001
  • This paper analysed the characteristic of Power consumption at many type of Inverter controlled Elevator. Especially, this paper proposed the standard value of full load currents. For this propose, it was classified by the passenger capacity and manufacture company. As a result, it is found that (i) the value is between -3[A] and 7[A] in case of elevator. That means the full load currents was smaller than the standard value of conventional operation type (ii) the value is between 0.5[kVA] and 3[kVA] in case of Power transformer. That means the transformer capacity was smaller than the standard value of conventional operation type. it was classified by the passenger capacity at inverter controlled elevator in apartment Also, to guarantee the operation stop of inverter controlled elevator, this paper proposed the redundancy method of electrical installations. the redundancy method is (i) 2 line service system and (ii) 2 distribution line system.

  • PDF

Optimal Location of Mail Distribution Center using Steiner Tree (Steiner Tree 이론을 이용한 우편물 교환센터인 최적 워치선정)

  • Yang, Seong-Deog;Lyu, Woong-Gyu;Lee, Sang-Joong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.9
    • /
    • pp.82-87
    • /
    • 2008
  • Faster, safer and cheaper mailing of the postal matter is essential for surviving in the competitive market of home-delivery service. In the past, the domestic delivery business has been nu by only a few number of companies. But more and more number of companies including medium size ones are participating in the business, and the competition is getting severe. This paper proposes a method to select the optimal location of mail distribution centers that minimally connect the local mail centers of some major cities in Korea using the Steiner Tree theory, which is about connecting a finite number of points with a minimal length of paths and has been used in the distribution system optimization and optimal routing of the transmission lines of the electric power system. By using Steiner Tree theory in finding the best location of the postal delivery hub, we may expect the reduction of transportation cost and the increase of profit, resulting in acquiring the superior position in the competitive delivery business. It is expected that we may use the Steiner Tree theory in finding the best location of the electric power substation for the nott higher EHV(extreme high voltage) transmission network.

Design Methodology of Communication & Control Device for Smart Grid Power Facility based on DSP and Raspberry Pi (DSP와 라즈베리 파이를 기반으로 한 스마트 그리드 전력설비의 통신제어장치 설계 방법론)

  • Oh, Se-Young;Lee, Jun-Hyeok;Lee, Sae-In;Park, Chang-Su;Ko, Yun-Seok
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.16 no.5
    • /
    • pp.835-844
    • /
    • 2021
  • In this paper, a power facility communication control device was designed to autonomously determine and separate the fault section through communication between power facilities in the smart grid distribution system. In the power facility communication control device, the control module was designed as a DSP to measure three-phase voltage and current, and the communication module was designed as an embedded-based Raspberry Pi to determine the fault section and realize the fault section separation through communication between power facilities. Communication between DSP and Raspberry Pi was designed by SPI communication, and communication between Raspberry Pi was designed based on Wi-Fi. Finally, a performance evaluation system based on three power facility communication control devices was built, and simulation verification was conducted for various fault events that may occur on the distribution line. As a result of the test evaluation, it was possible to confirm the effectiveness of the design methodology of the communication control device by showing the required response of the communication control device to all test cases.

Research on Backup Protective Coordination for Distribution Network (네트워크 배전계통용 백업 보호협조에 관한 연구)

  • Kim, WooHyun;Chae, WooKyu;Hwang, SungWook;Kim, JuYong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.1
    • /
    • pp.15-19
    • /
    • 2022
  • The radial distribution systems (RDS) commonly used around the world has the following disadvantages. First, when the DL is operated on a radial system, the line utilization rate is usually kept low. Second, if a fault occurs in the radial DL, a power outage of 3 to 5 minutes is occurring depending on the operator's proficiency and fault situation until the fault section is separated and the normal section is replaced. To solve this problem, Various methods have been proposed at domestic and foreign to solve this problem, and in Korea, research is underway on the advanced system of operating multiple linked DL always. A system that is electrically linked always, and that is built to enable high-speed communication during the protection coordination is named networked distribution system (NDS). Because the load shares the DL, the line utilization rate can be improved, and even if the line faults, the normal section does not need to be cut off, so the normal section does not experience a power outage. However, since it is impossible to predict in which direction the fault current will flow when a failure occurs in the NDS, a communication-based protection coordination is used, but there is no backup protection coordination method in case of communication failure. Therefore, in this paper, we propose a protective cooperation method to apply as a backup method when communication fails in NDS. The new method is to change TCC by location of CB using voltage drop in case of fault.

A study of communication-based protection coordination for networked distribution system (네트워크 배전계통용 통신기반 보호협조에 관한 연구)

  • Kim, WooHyun;Chae, WooKyu;Hwang, SungWook;Lee, HakJu
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.1
    • /
    • pp.43-48
    • /
    • 2022
  • Although the distribution system has been structured as complicated as a mesh in the past, the connection points for each line are always kept open, so that it is operated as a radial distribution system (RDS). For RDS, the line utilization rate is determined according to the maximum load on the line, and the utilization rate is usually kept low. In addition, when a fault occurs in the RDS, a power outage of about 3 to 5 minutes occurs until the fault section is separated, and the healthy section is transferred to another line. To improve the disadvantages of the RDS, research on the construction of a networked distribution system (NDS) that linking multiple lines is in progress. Compared to the RDS, the NDS has advantages such as increased facility utilization, load leveling, self-healing, increased capacity connected to distributed generator, and resolution of terminal voltage drop. However, when a fault occurs in the network distribution system, fault current can flow in from all connected lines, and the direction of fault current varies depending on the fault point, so a high-precision fault current direction determination method and high-speed communication are required. Therefore, in this paper, we propose an accurate fault current direction determination method by comparing the peak value polarity of the fault current in the event of a fault, and a communication-based protection coordination method using this method.

Development of Current Limiting COS Fuse Link with Improved Overcurrent and Protection Coordination performance (과전류 차단과 보호협조 성능이 향상된 한류형 COS 퓨즈링크 개발)

  • Kim, Youn-Hyun;Kim, Young-Ju
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.129-136
    • /
    • 2020
  • A Cut Out Switch (COS) is used for line protection and pole transformer protection in power systems. The COS used to protect the pole transformer is installed on the power side of the pole transformer to protect the electric equipment from fault currents. The COS is composed largely of a body and a fuse holder, and when the fault current is energized, the element of the fuse link in the fuse holder is melted to block the fault current. The arc generated when the COS fuse link is blown causes fire and noise, causing discomfort to residents in the surrounding area, and the arc flame can cause secondary damage to the peripheral device. In this study, a current-limiting COS fuse with improved overcurrent blocking performance rather than explosion type was developed to solve the arc and noise problems during COS operation. The overcurrent breaking performance of the current-limiting COS improves the reliability by developing a striker and COS fuse bracket. In addition, this study aimed to verify the performance of the developed current-limiting COS fuse through a test at an authorized institution.

A Study on the Automation of MVDC System-Linked Digital Substation (MVDC 시스템연계 디지털변전소 자동화 연구)

  • Jang, Soon Ho;Koo, Ja Ik;Mun, Cho Rong
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.10 no.7
    • /
    • pp.199-204
    • /
    • 2021
  • Digital substation refers to a substation that digitizes functions and communication methods of power facilities such as monitoring, measuring, control, protection, and operation based on IEC 61850, an international standard for the purpose of intelligent power grids. Based on the intelligent operating system, efficient monitoring and control of power facilities is possible, and automatic recovery function and remote control are possible in the event of an accident, enabling rapid power failure recovery. With the development of digital technology and the expansion of the introduction of eco-friendly renewable energy and electric vehicles, the spread of direct current distribution systems is expected to expand. MVDC is a system that utilizes direct current lines with voltage levels and transmission capacities between HVDCs applied to conventional transmission systems and LVDCs from consumers. Converting existing lines in substations, where most power equipment is alternating current centric, to direct current lines will reduce transmission losses and ensure greater current capacity. The process bus of a digital substation is a communication network consisting of communication equipment such as Ethernet switches that connect installed devices between bay level and process level. For MVDC linkage to existing digital substations, the process level was divided into two buses: AC and DC, and a system that can be comprehensively managed in conjunction with diagnostic IEDs as well as surveillance and control was proposed.

A Study on the Application of Bushings Fire Prevent Structure to Prevent Fire Spread of Transformer (변압기의 화재확산 방지를 위한 부싱 방화구조체 적용에 관한 연구)

  • Kim, Do-Hyun;Cho, Nam-Wook;Yoon, Choung-Ho;Park, Pil-Yong;Park, Keun-Sung
    • Fire Science and Engineering
    • /
    • v.31 no.5
    • /
    • pp.53-62
    • /
    • 2017
  • Electric power which is the energy source of economy and industries requires long distance transportation due to regional difference between its production and consumption, and it is supplied through the multi-loop transmission and distribution system. Prior to its actual use, electric power flows through several transformations by voltage transformers in substations depending on the characteristics of each usage, and a transformer has the structure consisting of the main body, winding wire, insulating oil and bushings. A transformer fire that breaks out in substations entails the primary damage that interrupts the power supply to houses and commercial facilities and causes various safety accidents as well as the secondary economic losses. It is considered that causes of such fire include the leak of insulating oil resulting from the destruction of bottom part of bushings, and the chain reaction of fire due to insulating oil that reaches its ignition point within 1 second. The smoke detector and automatic fire extinguishing system are established in order to minimize fire damage, but a difficulty in securing golden time for extinguishing fire due to delay in the operation of detector and release of gas from the extinguishing system has become a problem. Accordingly, this study was carried out according to needs of active mechanism to prevent the spread of fire and block the leak of insulating oil, in accordance with the importance of securing golden time in extinguishing a fire in its early stage. A bushings fireproof structure was developed by applying the high temperature shape retention materials, which are expanded by flame, and mechanical flame cutoff devices. The bushings fireproof structure was installed on the transformer model produced by applying the actual standards of bushings and flange, and the full scale fire test was carried out. It was confirmed that the bushings fireproof structure operated at accurate position and height within 3 seconds from the flame initiation. It is considered that it could block the spread of flame effectively in the event of actual transformer fire.