• Title/Summary/Keyword: 배수공법

Search Result 283, Processing Time 0.032 seconds

A study on drainage system of the room-and-pillar underground structure considering groundwater conditions (지하수 유출수 조건을 고려한 주방식 지하구조의 배수시스템 연구)

  • Lee, Chulho;Hyun, Younghwan;Hwang, Jedon;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.675-683
    • /
    • 2015
  • The room-and-pillar construction method for underground space is adopted from the room-and-pillar mining method which is one of the most popular underground mining method in the world. Drainage system in the room-and-pillar underground construction method can be similar with the concept of single shell in tunnel because additional reinforcement except the TSL (thin spray-on liner) is not applied in the room-and-pillar construction method. That is, to decrease groundwater level and maintain safety in tunnel, the drainage pin hole inside lining (shotcrete) can be used. However, if total amount of outflow in the underground structure is relatively small or groundwater is not detected, such drainage system will not be useful and cause additional construction cost. In this study, outflow of conventional tunnels in South Korea was investigated and the criteria to determine whether the drainage pin hole is effective was suggested. And the guided drainage system was suggested when drainage pin hole was not applied in the room-and-pillar construction method.

Economics and Ground Cover Growth Characteristics of a New Method of Shallow Soil Artificial Foundation Planting (저토심 인공지반 녹화공법의 경제성 및 도입 가능한 지피식물의 생육특성)

  • Choi, Jin-Woo;Kim, Hag-Kee;Lee, Kyong-Jae;Kang, Hyun-Kyung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.5
    • /
    • pp.98-108
    • /
    • 2009
  • The purpose of this study is to analyze the characteristics of limited methods, economics and breeding appropriateness of native and imported ground cover plants in the methodology of a shallow soil rooftop garden. The new shallow soil rooftop gardening method uses a total of 13cm in soil thickness, including 4.5cm of top soil on a 7.5cm rock-wool-mat stacked onto a 1cm roll-type-draining plate. The total construction cost for each method of soil level within the design price standard for SEDUM BLOCK is 89,433won/$m^2$, and for DAKU is 92,550won/$m^2$. By comparing those two methods, the construction cost of the shallow soil artificial foundation methodology is 45,000won/$m^2$; this shows the new method is 50% less expensive than the existing method of shallow soil rooftop gardening. The experiment was executed on the rooftop of the Korean National Housing Corporation to ensure validity of the shallow soil artificial foundation planting, and the sample plants which were imported and grown now in native covering. A list investigating the growing plants was made of the cover rate in each plant class, both while alive and the dry plant weight. The native ground cover plants, Sedum kamtschaticum, Sedum middendorffianum, Allium senescens, Sedum sarmentosum, Aquilegia buergariana, and Caryopteris incana increased the cover rate, live weight and dry weight in the shallow soil artificial foundation method. Among the imported cover plants, Sedum sprium and Sedum reflexum, the cover rate increased and growth conditions improved. However, some species needed weed maintenance. After examination with the less expensive shallow soil artificial foundation method and growth analysis, it was found that rooftop gardens are a low-cost option and the growth of plants is great. This result shows the new method can contribute to the proliferation of rooftop gardens in urban settings.

Application Evaluation of Countermeasure Method using Analysis of Failure Causes for Reinforced Slope (보강된 비탈면의 파괴원인 분석 및 대책공법의 적용성 평가)

  • Han, Jung-Geun;Hong, Ki-Kwon;Lee, Jong-Young;Jung, Sun-Kuk
    • Journal of the Korean Geosynthetics Society
    • /
    • v.10 no.1
    • /
    • pp.9-18
    • /
    • 2011
  • This paper described that the failure causes of reinforced slope are analyzed based on the effect of geological and rainfall. The analysis result confirmed that the rainfall has effects on the stability of reinforced slope. Therefore, it was applied to the dewatering method using collector well for slope stabilized, and then the analysis of seepage and slope stability were conducted on slope with the applied method. The results of seepage analysis are corresponded with failure cause by rainfall and the results of slope stability, which is applied to dewatering method, are satisfied with safety factor criterion. Therefore, it confirmed that the dewatering method using collector could be possible to apply in field and reasonable method for slope stabilized during heavy rainfall.

Non-linear Finite Strain Consolidation of Ultra-soft Soil Formation Considering Radial Drainage (방사방향 배수를 고려한 초연약 지반의 비선형 유한변형 자중압밀 거동 분석)

  • An, Yong-Hoon;Kwak, Tae-Hoon;Lee, Chul-Ho;Choi, Hang-Seok;Choi, Eun-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.11
    • /
    • pp.17-28
    • /
    • 2010
  • Vertical drains are commonly used to accelerate the consolidation process of soft soils, such as dredged materials, because they additionally provide a radial drainage path in a deep soil deposit. In practice, vertical drains are commonly installed in the process of self-weight consolidation of a dredged soil deposit. The absence of an appropriate analysis tool for this situation makes it substantially difficult to estimate self-weight consolidation behavior considering both vertical and radial drainage. In this paper, a new method has been proposed to take into account both vertical and radial drainage conditions during nonlinear finite strain self-weight consolidation of dredged soil deposits. For 1-D nonlinear finite strain consolidation in the vertical direction, the Morris (2002) theory and the PSDDF analysis are adopted, respectively. On the other hand, to consider the radial drainage, Barron's vertical drain theory (1948) is used. The overall average degree of self-weight consolidation of the dredged soil is estimated using the Carillo formula (1942), in which both vertical and radial drainage are assembled together. A series of large-scale self-weight consolidation experiments being equipped with a vertical drain have been carried out to verify the analysis method proposed in this paper. The results of the new analysis method were generally in agreement with those of the experiments.

Analysis of hydraulic Characteristics of Close-to-nature Creek Improvement (자연형 소하천정비사업 수리특성분석)

  • Yeon, Gyu-Bang;Kim, Yang-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.444-448
    • /
    • 2005
  • 자연형 이동소하천 시범사업은 축제공, 배수공, 구조물공, 조경공 등의 공종과 자연석 쌓기, 식생축조블록, 그린리버(환경)블록, 스톤넷, 친환경 돌망태, 식생매트, 환경블록 H형, 반딧불 블록, 지오그린셀, 자연석 3단쌓기 호안 등 9개의 다양한 호안공법이 적용되어 2003년 5월부터 공사를 시작하여 2003년 12월에 준공하였다. 본 자연형 이동소하천 정비시범사업에서는 공사 전$\cdot$$\cdot$후에 "수질, 유량, 홍수량 측정 및 수리분석 그리고 생태계, 하천수리"에 대한 모니터링 사업을 현재까지 계속적으로 수행하고 있다. 본 연구는 자연형 소하천정비 시범사업 중에서 유역 내 2004년의 홍수로 인하여 발생한 세굴$\cdot$퇴적 등의 하상변동과 하천형태의 변화특성을 분석한 것이다. 또한 2003년도에 시공되어 설치 완료된 9개의 호안 공법의 적응도를 분석하였다. 소하천 특성을 고려한 올바른 하천정비가 이루어지기 위해서는 적용하고자 하는 공법들에 대한 치수 안전성 및 신뢰성이 확보되어야 한다. 다양한 자연형 소하천 정비실적 및 적용사례가 부족한 국내의 실정을 고려할 때 국내 소하천 특성에 적합한 치수 안전성을 갖추면서 소하천의 환경기능을 향상시킬 수 있는 소하천 정비공법의 개발을 위한 지속적이고 일관성 있는 수리$\cdot$수문자료의 축적을 위한 연구와 모니터링이 이루어져야할 것이다.

  • PDF

Rehabilitation with the Green Method for the Huge Pipeline Using a Dry-Type Equipment (녹색공법을 이용한 대형 수도관 갱생)

  • Kim, Young-Ju;Choi, Byoung-Seub;Lee, Sang-Hyun;Hong, Dae-Sung;An, Hyo-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.282-286
    • /
    • 2009
  • 1979년 준공된 수도권 광역상수도 1단계 시설은 상당한 노후화가 진행되었을 것으로 예상되며, 또한 향후 한강하류권 용수공급계획이 예정되어 있어 내부부식 및 관로손상부 개량의 시급성이 제기되었다. 이에 따라 직경 2,800${\sim}$800mm의 초대구경 도수관 53.9km의 개량을 위한 사업이 추진되었으며 시공성, 환경성, 경제성 등의 여러 항목에 대한 검토 결과 신개념 녹색공법인 비굴착식 건식일체형 공법이 최종 선정되었다. 그동안 기존관 개량공사에서 주로 사용되었던 굴착공법이 굴착에 따른 공기지연, 소음 분진 악취 등의 환경오염, 전구간 굴착에 따른 공사비 증가 등 많은 문제점을 안고 있는 것에 반해, 동사업에서 채택된 비굴착공법은 관로내에서 작업이 이루어지므로 공기단축, 환경오염 최소화에 따른 민원발생 최소화, 작업구만 굴착함에서 오는 공사비 절감 등 상대적으로 훨씬 우수한 것으로 평가된다. 동공법에 따르면 관내부 갱생공사는 '배수 및 잔류토사 제거'${\to}$'관내건조'${\to}$'표면처리'${\to}$'프라이머도장'${\to}$'본도장'의 순으로 진행된다. 일체형 장비에 의한 이와 같은 초대형관의 자동화시공은 세계에서 처음 적용되는 것이다.

  • PDF

A Selection of Bank Protection Method of Natural Stream by Numerical Simulation and Hydraulic Model Test in Han River Basin (한강유역 수치모의 및 수리모형실험을 통한 자연형 하천 저수호안공법 선정)

  • Moon, Young-Il;Son, Chan-Young;Chang, Myung-Sik;Oh, Chul-Kyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.178-178
    • /
    • 2011
  • 현재 환경적인 면과 실용적인 면을 고려한 한강 르네상스 사업중 한강공원 특화사업을 시행하고 있다. 하지만 이러한 환경적인 면과 실용적인 면을 고려할 시 문제점이 될 수 있는 것은 결국 치수성의 문제을 생각하여야 하므로 본 연구는 한강공원 특화사업으로 인하여 발생할 수 있는 치수 문제를 사전에 예방하고자 한강공원특화사업의 RAMS모형을 이용하여 200년 빈도 유량에 대한 2차원 수치모의 및 수리모형실험을 하여 한강공원 특화사업으로 인해 발생할 수 있는 수리학적 흐름 특성 변화를 분석하여 홍수에 대한 안정성을 검토하였으며, 자연형 호안공법을 비교하여 각 권역에 맞는 호안공법을 선정하고자 하였다. 수치모의를 통한 분석결과 뚝섬권역의 수위분포는 잠실대교 하류 부근에서 0.02m 정도의 편수위가 발생하였고, 유속분포는 약2m/s~2.5m/s이며, 현단면과 계획단면 비교시 수위, 유속의 변화는 거의 없는 것으로 나타났으며, 수치모의와 수리실험결과로 인하여 수리적 안전성을 확보하고 친환경, 경제성 등의 검토로 보수가 용이하고 배수성이 양호한 사석공법과 세굴방지 효과가 우수하며, 자연경관이 뛰어난 자연석공법이 적합하다고 판단된다.

  • PDF

A Case Study on the Improvements of Soft Ground Using PBD Method in Pusan New Port (부산신항 연약지반에 적용된 PBD공법의 지반개량 시공사례)

  • Son, Jin-Hyun;Kim, Ji-Yong;Byun, Ki-Jun;Lee, Byung-Gil;You, Seung-Kyong;Kim, Tae-Hyung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.5 no.4
    • /
    • pp.1-10
    • /
    • 2006
  • In This paper, the settlements of soft ground and the undrained shear strength were compared for verify the improvement effect of PBD method, completed in the Busan New Port phase 1-1 site. Through the describing of design cases with the PBD method, the effects of the improvement method with CPT data were evaluated comparing with measured results. We expect that the output from this research is useful in future for design and analysis when similar soft grounds are planned to be used.

  • PDF