• Title/Summary/Keyword: 방전 및 방전가스

Search Result 262, Processing Time 0.018 seconds

Solar ESS Peak-cut Simulation Model for Customer (수용가 대응용 태양광 ESS 피크컷(Peak-cut) 시뮬레이션 모델)

  • Park, Seong-Hyeon;Lee, Gi-Hyun;Chung, Myoung-Sug;Chae, U-ri;Lee, Joo-Yeuon
    • Journal of Digital Convergence
    • /
    • v.17 no.7
    • /
    • pp.131-138
    • /
    • 2019
  • The world's electricity production ratio is 40% for coal, 20% for natural gas, 16% for hydroelectric power, 15% for nuclear power and 6% for petroleum. Fossil fuels also cause serious problems in terms of price and supply because of the high concentration of resources on the earth. Solar energy is attracting attention as a next-generation eco-friendly energy that will replace fossil fuels with these problems. In this study, we test the charge-operation plan and the discharge operation plan for peak-cut operation by applying the maximum power demand reduction simulation. To do this, we selected the electricity usage from November to February, which has the largest amount of power usage, and applied charge / discharge logic. Simulation results show that the contract power decreases as the peak demand power after the ESS Peak-cut service is reduced to 50% of the peak-target power. As a result, the contract power reduction can reduce the basic power value of the customer and not only the economic superiority can be expected, but also contribute to the improvement of the electric quality and stabilization of the power supply system.

Economic analysis of Frequency Regulation Battery Energy Storage System for Czech combined heat & power plant (체코 열병합발전소 주파수조정용 배터리에너지저장장치 경제성 분석)

  • KIM, YuTack;Cha, DongMin;Jung, SooAn;Son, SangHak
    • Journal of Energy Engineering
    • /
    • v.29 no.2
    • /
    • pp.68-78
    • /
    • 2020
  • According to the new climate change agreement, technology development to reduce greenhouse gases is actively conducted worldwide, and research on energy efficiency improvement in the field of power generation and transmission and distribution is underway [1,2]. Economic analysis of the operation method of storing and supplying surplus electricity using energy storage devices, and using energy storage devices as a frequency adjustment reserve power in regional cogeneration plants has been reported as the most profitable operation method [3-7]. Therefore, this study conducted an economic analysis for the installation of energy storage devices in the combined heat and power plant in the Czech Republic. The most important factor in evaluating the economics of battery energy storage devices is the lifespan, and the warranty life is generally 10 to 15 years, based on charging and discharging once a day. For the simulation, the ratio of battery and PCS was designed as 1: 1 and 1: 2. In general, the primary frequency control is designed as 1: 4, but considering the characteristics of the cogeneration plant, it is set at a ratio of up to 1: 2, and the capacity is simulated at 1MW to 10MW and 2MWh to 20MWh according to each ratio. Therefore, life was evaluated based on the number of cycles per year. In the case of installing a battery energy storage system in a combined heat and power plant in the Czech Republic, the payback period of 3MW / 3MWh is more favorable than 5MW / 5MWh, considering the local infrastructure and power market. It is estimated to be about 3 years or 5 years from the simple payback period considering the estimated purchase price without subsidies. If you lower the purchase price by 50%, the purchase cost is an important part of the cost for the entire lifetime, so the payback period is about half as short. It can be, but it is impossible to secure profitability through the economy at the scale of 3MWh and 5MWh. If the price of the electricity market falls by 50%, the payback period will be three years longer in P1 mode and two years longer in P2 and P3 modes.