• Title/Summary/Keyword: 방사화 생성물 재고량

Search Result 5, Processing Time 0.02 seconds

The Effects of Impurity Composition and Concentration in Reactor Structure Material on Neutron Activation Inventory in Pressurized Water Reactor (경수로 구조재 내 불순물 조성 및 함량이 중성자 방사화 핵종 재고량에 미치는 영향 분석)

  • Cha, Gil Yong;Kim, Soon Young;Lee, Jae Min;Kim, Yong Soo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.14 no.2
    • /
    • pp.91-100
    • /
    • 2016
  • The neutron activation inventories in reactor vessel and its internals, and bio-shield of a PWR nuclear power plant were calculated to evaluate the effect of impurity elements contained in the structural materials on the activation inventory. Carbon steel is, in this work, used as the reactor vessel material, stainless steel as the reactor vessel internals, and ordinary concrete as the bio-shield. For stainless steel and carbon steel, one kind of impurity concentration was employed, and for ordinary concrete five kinds were employed in this study using MCNP5 and FISPACT for the calculation of neutron flux and activation inventory, respectively. As the results, specific activities for the cases with impurity elements were calculated to be more than twice than those for the cases without impurity elements in stainless and carbon steel. Especially, the specific activity for the concrete material with impurity elements was calculated to be 30 times higher than that without impurity. Neutron induced reactions and activation inventories in each material were also investigated, and it is noted that major radioactive nuclide in steel material is Co-60 from cobalt impurity element, and, in concrete material, Co-60 and Eu-152 from cobalt and europium impurity elements, respectively. The results of this study can be used for nuclear decommissioning plan during activation inventory assessment and regulation, and it is expected to be used as a reference in the design phase of nuclear power plant, considering the decommissioning of nuclear power plants or nuclear facilities.

Preliminary Estimation of Activation Products Inventory in Reactor Components for Kori unit 1 decommissioning (고리1호기 해체시의 원자로 구조물에서의 방사회 생성물 재고량 예비평가)

  • Lee, Kyung-Jin;Kim, Hak-Soo;Sin, Sang-Woon;Song, Myung-Jae;Lee, Youn-Keun
    • Journal of Radiation Protection and Research
    • /
    • v.28 no.2
    • /
    • pp.109-116
    • /
    • 2003
  • Based on the necessity to evaluate the activation products inventory during decommissioning lot domestic nuclear power plants, a preliminary estimation of the activation products inventory for Kori unit 1, which is getting close to the end of lifetime, was carried out with ANISN and ORIGEN2 code. In order to calculate neutron nux using ANISN code, the reactor was divided into 9 zones from core to bioshield concrete for radial direction. Also :he cross-section of main nuclides were calibrated with neutron flux in the reactor pressure vessel(RPV) region. The results showed that 95 % of tile total radioactivity in RPV from reactor shutdown to 10 years came from the nuclides of $^{55}Fe,\;^{59}Ni,\;^{63}Ni\;and\;^{60}Co$. And the total radioactivity with cooling of more than 50 years after decommissioning was no more than 0.2 % of at the time of shutdown. Considering the weight of RPV is 210 tons, the total radioactivity of RPV reached to $5.25{\times}10^{6}GBq$ at shutdown time. As compared with the total radioactivity of bioshield concrete at reactor shutdown time, the radioactivity after tooling more than 10 years was below 1 %.

A Study on Radioactive Source-term Assessment Method for Decommissioning PWR Primary System (PWR 1차계통내 해체 방사성선원항 평가방법에 관한 연구)

  • Song, Jong Soon;Kim, Hyun-Min;Lee, Sang-Heon
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.12 no.2
    • /
    • pp.153-164
    • /
    • 2014
  • Currently, there are many programs which are now being developed or already developed to predict radionuclide and corrosion product at the stage of designing NPP. However, since there are not many developments in evaluating quantity of activation corrosion products occurring when disassembling a nuclear power plant there exist some difficulties in calculating accurately. In order to evaluate activation products inventory for the research of effect of neutron activation in the reactor vessel, component of nuclear reactor and adjacent structures, it should be evaluated by using operation history of nuclear reactor, material composition of structure and average neutron flux in every field representing fixed structure of nuclear reactor. In this study, CORA, PACTOLE, CRUDSIM, CREAT and ACE codes are analyzed to predict the quantity of radionuclide and corrosion product of primary reactor which is used at the stage of designing. As a future study, the accuracy in calculating the quantity of product corrosion can be increase by finding out the possibility of use and improvement for evaluation of the decontamination.

Inventory Estimation of 36Cl and 41Ca in Concrete of Kori Unit 1 (고리 1호기의 콘크리트 내 36Cl 및 41Ca의 방사화재고량 평가)

  • Jang, Mee;Lim, Jong Myoung;Kim, Hyun Chul;Kim, Chang-Jong
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.17 no.1
    • /
    • pp.121-126
    • /
    • 2019
  • The radionuclide inventory prediction of a nuclear power plant can help establish decommissioning plan by providing information of radiation environment. Accumulated radionuclides in reactors and related facilities after reactor shutdown can be divided into neutron activated materials and contaminated materials. Among the neutron activated radionuclides, $^{36}Cl$ and $^{41}Ca$ are important from the viewpoint of disposal because of its long half-life and physiochemical characteristics. In this research, we calculated the radionuclides of $^{36}Cl$ and $^{41}Ca$ in bioshielding concrete by estimating the neutron flux and cross section using the MCNPX. And we evaluated the inventories of $^{36}Cl$ and $^{41}Ca$ using the activation calculation code ORIGEN2.