A Suggestion of Penalty Cost Appropriation Methodology for Performance Acceptance Test of CGAM Cogeneration - Part II (CGAM 열병합발전의 인수성능에 대한 페널티 비용 책정 방법론 제안 - Part II)

  • Kim, Deok-Jin
    • Plant Journal
    • /
    • v.12 no.4
    • /
    • pp.32-36
    • /
    • 2016
  • In this study, a penalty cost appropriation methodology for CGAM performance acceptance test was suggested. As the result of CGAM performance test, there were 0.31% decreases in electricity output, 0.39% decreases in heat rate on electricity output, 0.31% increases in heat output, and 0.23% increases in heat rate on heat output. As the result of penalty cost appropriation for above performance, the penalty cost was calculated as -$20,837 in electricity output, -$25,930 in heat rate on electricity output, +$10,340 in heat output, and +$7,715 in heat rate on heat output. Each penalty is appropriated as above fore kinds, however the total penalty should be determined as how to combine above fore kinds of penalty. In our calculation, the minimum total penalty was -$18,215 and the maximum total penalty was -$46,767. The methodology of total penalty appropriation should be determined in the contract between ordering organization and construction firm, and we can understand that it is very important.

  • PDF

A Study of FEED Verification process of Small Utility Equipment in Offshore plant (해양플랜트 소형 유틸리티장비의 FEED 검증 프로세스에 대한 연구)

  • Han, Seong-Jong;Park, Beom
    • Plant Journal
    • /
    • v.13 no.2
    • /
    • pp.39-45
    • /
    • 2017
  • This paper is a study on FEED validation model that can be used in the bidding stage of small utility equipment in offshore plant industry using system engineering technique. Currently, domestic marine plant equipment industry companies are faced with the financial risk of project execution as they enter marine plant. The major cause was the insufficient ability to verify the FEED output from the contractor (Engineering or Procurement and Construction) of the equipment manufacturer (COMPANY or EPC). Therefore, we propose FEED design verification method that simplifies the system engineering method that sequentially applies requirements analysis, function, performance analysis and physical architecture building process. Also, we verified the suitability of the developed model by comparing the results of applying the developed FEED verification model and the verification method that depends on the existing experience for the small utility equipment (Air Compressor).

  • PDF

A Successful Example of the PMIS to Dongnam Distribution Complex Project using TPMS(Total Project Management System) of the GS E&C (GS건설 TPMS를 통한 동남권유통단지 이주전문상가 현장 PMIS 성공사례)

  • Lee, Heung-Won;Park, Chan-Jeong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.129-134
    • /
    • 2007
  • In 1996, GS E&C became the first in the industry to adopt a Project Management System using EVM(Earned Value Management) to link schedule with profit/loss. In 2006, the TPMS(Total Project Management System) was completed by adding the concept of Lean Construction and JIT(Just In Time) to the Project Management System. This was done with the purpose of reducing waste and creating optimal work processes. This has been implemented on all sites and has enabled drastic increase of productivity. The portal provides customized information to the client, inspector and subcontractor personnel. Since various parties are receiving information that suits their requirements and is easy to use, usage has increased and since they are on the same platform, quick decisions and information sharing is possible. The purpose of the PMIS's success model in construction projects, this paper tests and proves the TPMS's efficiency and productivity to Dongnam Distribution Complex project.

  • PDF

Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System- (공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로-)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.12-21
    • /
    • 2013
  • Total Project Cost Management System(TPCMS) was introduced with the purpose of increasing the efficiency of cost control for public construction project in 1994. In this paper, general perception of participants of the public construction project on the TPCMS was examined, and the problems in implementing the TPCMS was figured out through expert interviews and survey. Then better ways to implement the system were drawn based on the problems. To effectively manage the cost of public construction project, basically project cost should be estimated accurately in planning stage and managed based on it to have a project complete within the budget. In addition, the cost need to be managed in more systematic ways in terms of data collection and analysis, and the autonomy in managing the project cost given to the project owner needs to be expanded. Most of all, proper budget should be provided to prevent a project from delay through setting the priority of projects and proper budget allocation based on the priority.

An Exploratory Study on S/W Project Quality and Organizational Performance by Process Maturity Certification (프로세스 성숙도 인증 여부에 따른 프로젝트 품질 성과 및 조직 성과 차이에 관한 탐색적 연구 : CMM 인증 및 비인증 조직을 중심으로)

  • Moon, Song-Chul;Kim, Hyun-Soo
    • The KIPS Transactions:PartD
    • /
    • v.11D no.2
    • /
    • pp.387-396
    • /
    • 2004
  • Qualify of software development project is very important in complex and large domestic software market. Software development companies are eager to Bet some quality certification such as CMM certification. However, reliability and effectiveness of CMM certification tomes into question. This study explores the relationships between software project Quality (and some organizational performance) and organization's CMM certification. The result shows no strong relationships between project quality and CMM certification. This may imply that an incremental improvement of project process plays a more important role than certification process itself.

Effects of Information from Enterprise Architecture on Government IT Projects (EA(Enterprise Architecture)에서 제공하는 정보가 공공기관 정보화사업수행 활동에 미치는 영향 연구: 관세청 정보화 구축·운영사업 사례를 중심으로)

  • Hyun, Myungjin;Kim, Miryang
    • Informatization Policy
    • /
    • v.29 no.3
    • /
    • pp.61-81
    • /
    • 2022
  • This paper explores how the provided information from Enterprise Architecture (EA) affects the activities to for performing IT projects. The IT projects analyzed in this paper are projects to for developing and maintaining Korea Customs' UNI-PASS. This research was conducted based on surveys to demonstrate the effects of the information from EA on activities for IT projects. Information from EA is categorized into propriety, sufficiency and consistency. Activities for IT projects are defined as management, participation, communication, requirement management and human resource. Correlational analysis is used to measure the effects of the inf ormation on the defined activities. The analysis, which verifies the provided information by EA, does not have meaningful correlation with project management nor human resource. For public officials in charge, Sufficiency of the information produces a positive effect on decision making. For operation company, consistency of the information encourages utilization of the resources required for the project. This research suggests that strategies for performing IT projects with EA information that can support the verification of characteristic environments of each project and performance of vital activities required by the participants' roles will ensure the success of government IT projects.

Analysis of Potential Construction Risk Types in Formal Documents Using Text Mining (텍스트 마이닝을 통한 건설공사 공문 잠재적 리스크 유형 분석)

  • Eom, Sae Ho;Cha, Gichun;Park, Sun Kyu;Park, Seunghee;Park, Jongho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.91-98
    • /
    • 2023
  • Since risks occurring in construction projects can have a significant impact on schedules and costs, there have been many studies on this topic. However, risk analysis is often limited to only certain construction situations,and experience-dependent decision-making is therefore mainly performed. Data-based analyses have only been partially applied to safety and contract documents. Therefore, in this study, cluster analysis and a Word2Vec algorithm were applied to formal documents that contain important elements for contractors or clients. An initial classification of document content into six types was performed through cluster analysis, and 157 occurrence types were subdivided through application of the Word2Vec algorithm. The derived terms were re-classified into five categories and reviewed as to whether the terms could develop into potential construction risk factors. Identifying potential construction risk factors will be helpful as basic data for process management in the construction industry.

A Study on the Designer's Post-Evaluation of Gyeongui Line Forest Park Based on Ground Theory - Focused on Yeonnam-dong Section - (근거이론을 활용한 설계자의 경의선숲길공원 사후평가 - 연남동 구간을 중심으로 -)

  • Kim, Eun-Young;Hong, Youn-Soon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.47 no.3
    • /
    • pp.39-48
    • /
    • 2019
  • This research is based on the analysis of in-depth interviews of designers who participated in the design of the Yeonnam-dong section, which was completed in 2016. The case study site has received many domestic and foreign awards and is receiving very positive reviews from actual users. 53 concepts were derived from the open coding of the ground theory methodology. Thirty-four higher categories incorporated the concepts and 18 higher categories that reintegrated them. Later, the six categories of the ground theory were interpreted as the paradigm, and it was determined that the aspects of 'will of client' and 'work efficiency', 'site resources' and 'field manager's specialty' were the categories that had the greatest positive impact on the park construction. The key category of this park's construction was interpreted as "a park-construction model with active empathy and communication." The results of the study and are linked to the following research proposals. First, the need to improve the trust between the client and the landscape designer and the need to improve the customary administrative procedures; second, the importance of the input of landscape experts into the park construction process; third, the importance of all efforts to develop the design; fourth, the importance of on-site circular resources and landscape preservation; and fifth active social participation to increase the opportunity. This study, which seeks to grasp the facts that existed behind the park's construction, which received excellent internal and external evaluations, and has a qualitative, objective and structural interpretation of the social network related to the park's construction, in contrast to the conventional quantitative post-evaluation. It is expected that the administration and system improvements related to landscaping will be further improved through the continuation of in-depth post-evaluation studies.

Operation Model of On-site Environmental Management Council to Enhance Eco-friendliness in Public Construction Sites (공공 건설현장의 친환경성 제고를 위한 현장환경관리협의회 운영 모델)

  • Sohn, Jeong-Rak;Park, Seong-Sik;Jun, Myoung-Hoon;Song, Sang-Hoon
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.423-431
    • /
    • 2012
  • The trends of Green growth and environmentally-friendliness came to be the key development indicator for sustaining global environment for the future. Korean government reflected these trends in the main flows of the national development index. Korean construction industry is concentrating investment on fields related to these trends such as technologies for carbon dioxide deduction, materials or products for environmentally-friendly building and alternative energy development, as well. However, efforts to follow these trends during the construction process as a step for production phrase are not being considered enough. In this study, we analysed current status and points to be improved of on-site environment management by surveying major project owners and representatives of the environmental affairs in the leading companies of those fields. Also, we suggested organizational structure and operation model as a solution for enhancing environmentally-friendliness for systematic approach to manage on-site environment in public construction sites. In addition to these solutions, further approaches such as shifting paradigm of project owners and contractors, securing workforce and practical budget for efficient management activities, developing environmental management manuals, setting standards for evaluation of activities are needed for the stable settlement of on-site environmental management.

Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis (IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가)

  • Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.145-156
    • /
    • 2024
  • In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.