Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.471-474
/
2008
The range of PFI project has been expanded from Road facilities, Hobor facilities to Education facilities, Military residence facilities since 2005. Especially, The dormitory project that one of the most lucrative facilities among education facilities was progressing but it has many problems with introducing PFI project. This object of research is deriving problems by introducing PFI project and solving problems by consulting with experts. The results of research have had problems that increasing rental fee, difficulty of retrieving the investment and shortage of government supports. The solutions concerning the problems are using organization, introducing various programs and relieving regulation of government. This paper was made by consulting with experts and is expecting to use the basic data when comparing and analyzing the cases used PFI.
우리나라에서는 벤처생태계의 구성이 태생적으로 정부 주도로 법제화된 정부자금의 지원이 기초가 되어 이루어지면서 공적 자금의 정책적 목적에 따라 운영되어왔다. 따라서 벤처투자기구에 대해서 이해상충 가능성 배제, 고도의 윤리성, 공정성 및 투명성 등을 요구하는 등 강한 규제가 반영되게 되었다. 이러한 공적규제가 일면 타당성이 있을 수 있으나, 공적규제 위주의 관리감독 체계는 규제의 영향을 크게 받는 한국 벤처투자 시장의 성격상 민간자금의 유입을 제한할 수 있다. 민간 중심의 벤처투자 시장으로 전환하기 위해서는 공적규제를 강화하기보다는 자율규제 영역을 확대하여 업계의 전문성과 효율성에 친화적인 규제 환경을 조성할 필요가 있다. 따라서 본 연구에서는 벤처투자 시장의 자율규제 가능 영역을 살펴보고, 벤처투자기구의 운용사 관점에서의 자율규제 방안을 제시하였다. 구체적 방안 중 하나로는 출자자 사이의 자치적 규범이라고 할 수 있는 규약의 표준이 참여자의 전문적인 식견을 최대한 반영하여 마련된 것이므로, 펀드 결성 이후 출자자 사이의 규약을 둘러싼 분쟁이 발생하는 경우 이를 자율적으로 해결할 수 있는 1차적인 분쟁 조정 절차를 마련해 볼 수 있다.
Journal of Korean Society of Archives and Records Management
/
v.21
no.3
/
pp.37-60
/
2021
The recent revision of the Public Records Management Act provided a basis for the procurement of private records from local archives. Accordingly, some local governments are promptly trying to gather these private records through various ways, and a representative methodology of such is a contest for acquiring records. This study aims to analyze how much this contest contributes to the acquisition of private records and the current status of its operation. As an example of this study, Jeonju Citizens Archives, which conducted the contest more than ten times, was selected. Based on the analysis results, the operation status of the contest for acquiring records and improvement plans for activation were presented.
Proceedings of the Korea Water Resources Association Conference
/
2005.05b
/
pp.1363-1367
/
2005
본 연구에서는 우리나라의 민간단체에서 시행되고 있는 전국 강살리기 운동 사례를 조사하여 강살리기 운동의 현황과 전망 및 한계점을 분석하며, 앞으로의 바람직한 강살리기 운동의 방향을 제시하는 것으로 하였다. 이를 위하여 전국 강살리기 네트워크 참여 단체를 중심으로 각 단체의 활동 사례를 조사하여 이들 활동의 특성을 검토하고, 치수와 이수 및 하천환경 측면에서 운동의 현황과 한계점을 검토하여 이를 극복하는 방안을. 제시하며, 이를 바탕으로 지역 주민과 함께 하는 강살리기 사업의 방안도 모색하는 것으로 하였다.
Studying the operation of urban control plan and control program of urban plan facilities to present development direction of urban plan in the future by performing multi-variate analysis, the research acquired the following conclusion. It is required to institutionally activate the inhabitants' participation by reflecting spontaneous participation and opinion of inhabitants to adminstration so that the effect of business can be maximized in the stage of establishing urban control plan. Furthermore, the participation of role dividing type is necessary to adjust and connect the interest of expert that has experience in practical business of overall urban plan, inhabitant and self-governing body. It is required to reduce the service supplied by government so as to enhance policy of plan-first and development last for facilities with high importance and utility such as road, park and water supply/sewage, etc as well as to seek control program that expands the participation of private sector for administration for which private service is possible.
Kim, Byungil;Yun, Sungmin;Han, Seung Heon;Kim, Hyung Hwe
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.6D
/
pp.839-847
/
2008
No proper system exists for private investment projects, and efficient project management is not being achieved due to entanglements of management. Recognizing these circumstances, this paper has diagnosed the hard facts that project management organizations and systems are facing, and presented solutions to the factors that are obstructing the establishment of efficient project management system. This paper carried out focus group interviews on the experts who had participated in the Incheon International Airport Railway construction project, using the methodology of an exploratory case study. The results were systematically analyzed according to organizational behavior and causes corresponding to each of the problems were deduced. Private investment projects were divided into task environments and project organizations based on social science methodology and analyzed, and a final improvement plan for each participating organization was presented. An improvement plan was presented, and it was compared with the case study of Incheon bridge construction project, which is recognized as a model of successful project management, and its appropriateness evaluated.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.2
/
pp.471-480
/
2015
The market of public-private partnership (PPP) projects has reduced from 9.4 trillion won in 2007 to 4.5 trillion won in 2012. However, the need of PPP projects is brought up by a massive down scale of government financial business. Previous studies regarding PPP projects mostly evaluate profitability from the financial perspective or analyze risk factors as a whole. Although PPP projects generally have complex structure involving diverse stakeholders, such as contractor, financial investor, and special purpose company (SPC) operators, existing studies have rarely considered the different viewpoints of PPP project stakeholders. Therefore, purpose of this study is to develop a structural equation model (SEM) considering the diverse stakeholders of PPP projects. To this end, the authors first reviewed the organizational structure of PPP projects. Next, the identification of the factors affecting project profitability are done via comprehensive literature reviews. After that, we conducted in-depth interviews and questionnaire surveys to reflect stakeholders' perspectives (contractors, financial investors, and SPC operators). As a result, a SEM model is developed to analyze direct and indirect effect on the PPP project performances. Finally, using the analysis results, relevant implications and directions for improvements are discussed. The prediction of the business performance of contractor, financial investor, and SPC operator is expect to be possible through the model developed and supports the strategy deduction that is appropriate for the participants.
Park, Heedae;Park, Hyung Keun;Jang, Hyeon Seok;Han, Seung Heon
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.1D
/
pp.119-126
/
2011
High-speed railway raises global interests with the growing concerns on the green development and the green energy. However, since most of the infrastructure investment of Korea was focused on the highway projects for last forty years, the investment on the railway has been limited around 40~50% of that of the highway projects. In addition, due to the world economy crisis and unsatisfactory support of existing policy for the private investment project, the private investment is given a small deal of weight on the social overhead capital investment. Meanwhile, despite the world high-speed railway market is growing rapidly and the Korean contractors have won the international construction contracts over 70 billion USD, past records of railway projects are very rare. Therefore, it is required to develop strategies for encouraging private investment in the domestic market to achieve efficient high-speed railway development and for advancing into foreign high-speed railway market. This study carried out data collection and market analysis for both domestic and foreign market respectively. Through a structured questionnaire survey and expert interviews, contractors' perceptions on the high-speed railway market and needs for the government support are collected. Summary of strategies drawn from this study are as follows: 1) carrying out BTL high-speed railway projects and revising related policies; 2) upwarding incentive level for the private pre-investment projects considering the contractors' credit rating; 3) carrying out Honam-Jeju submarine railway project; 4) establishing a efficient consortium model for foreign market; 5) improving the capacity of the Korea Railway Association that support Korean contractors' foreign advancement; and 6) expand the budget for Global Infra-fund.
The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
/
v.29
no.6
/
pp.15-19
/
2000
환경문제의 윤리적 실천을 위한 구체적인 방안으로 인간과 자연의 공존모색, 새로운 자연보전제도의 수립, 올바른 생태학적 지식에 따른 건축계획 등을 제시하고, 정부의 자연보전정책을 실질적으로 강력하게 그 모범을 주는 의미에서 생태건축도시의 생성과 산·학·연 그리고 민간의 참여로 생태건축의 활성화를 도모하고자 함.
Proceedings of the Korea Contents Association Conference
/
2006.11a
/
pp.382-386
/
2006
본 연구에서는 지방의회 재출범 15년을 평가해 보고 충청지역(대전,충남,충북) 전문가그룹의 인식을 토대로 지방의회의 발전방안을 정책기능강화 측면과 주민참여활성화 측면으로 나누어 모색하였다. 정책기능의 강화를 위해서 본 연구에서는 전문 위원실 역할강화, 정책관련부서의 신설, 지방의원의 외유내실화, 상임위원회의 기준완화 등을 제안하였다. 그리고 지방의정에의 시민참여 활성화방안으로는 인터넷이나 케이블TV를 통한 의회활동중개, 의사일정의 고정과 적극적인 홍보, 주요의사 결정과정에 자문위원회 및 심의위원회의 대폭확대, 유급시민모니터링제도의 도입, 상임위원회에 민간위원의 참여(결정권 없이) 필요성 정도, 휴일의회 및 야간의회 개최 등의 방안을 제안하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.