A Study on the Load Distribution Ratio and Axial Stiffness on Existing and Reinforcing-Pile in Vertical Extension Remodeling (수직증축시 기존말뚝과 보강말뚝의 하중분담율 및 축강성 분석)

  • Jeong, Sang-Seom;Cho, Hyun-Cheol
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.1
    • /
    • pp.17-30
    • /
    • 2019
  • This study presents the application of the numerical and analytical technique to simulate the Load Distribution Ratio (LDR) and to define axial stiffness on reinforcing pile foundation ($K_{vr}$) in vertical extension remodeling structure. The main objective of this study was to investigate the LDR between existing piles and reinforcing piles. Therefore, to analyze the LDR, 3D FEM analysis was performed as variable for elastic modulus, pile end-bearing condition, raft contacts, and relative position of reinforcing pile in a group. Also, using the axial stiffness ($K_{ve}$) of existing piles, the axial stiffness of reinforcing pile was defined by 3D approximate computer-based method, YSPR (Yonsei Piled Raft). In addition $K_{vr}$ was defined by reducing the $K_{ve}$considering the degradation of the existing piles.

Case Study for Construction Cost Saving by means of Economic Pile Design Procedure (말뚝기초의 경제적인 설계절차에 의한 건설비용 절감 사례 연구)

  • Choi, Yong-Kyu;Lim, Jong-Seok;Kwon, Oh-Kyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.4 no.4
    • /
    • pp.73-84
    • /
    • 2003
  • In this study, the economic pile design procedure using the proof test results was proposed. In order to improve the inappropriate pile design routine, the proof test for 6 pile cases were performed and the construction saving effect were analyzed. The saving rate of construction cost with the small diameter piles and the large diameter drilled shafts were 34 - 47 and 0 - 55 %, respectively.

  • PDF

A Suggestion of High Quality Concrete for PHC Pile (PHC 말뚝의 콘크리트 고품질화를 위한 제언)

  • 최승선
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.6
    • /
    • pp.41-48
    • /
    • 2002
  • 2001년도 년간 302만 4,000ton의 사용실적을 보이고 전체 콘크리트 말뚝 사용량의 99.5%를 점유하고 있는 PHC 말뚝은 국내에 도입된 1992년이래 약 10년 동안 양적, 질적으로 많은 발전을 거듭하여 왔으며 현재 우리나라의 건축 토목공사용 기초자재로서 없어서는 안될 중요한 위치를 확보하고 있는 것이 사실이다. 1970년대까지 주로 사용되었던 RC 말뚝은 1970년대 후반부터 PC 말뚝으로 대체되었고, 1990년도 초반 생산되기 시작한 PHC 말뚝이 우리나라 콘크리트 말뚝의 주류를 이루어 현재콘크리트 말뚝의 대명사로 자리 매김하며 발전을 거듭하고 있는 것이다. 또한 PHC 말뚝에 사용되는 콘크리트의 압축강도는 800kgf/$\textrm{cm}^2$ 이상이 확보되어야 함으로 콘크리트 공장제품 중에서 보기 드물게 고강도를 요구하고 있으며 고강도화를 위한 제조공정의 품질관리도 높은 수준이 요구되어 우리나라 콘크리트 공장제품의 고강도화와 품질향상에 기여한 정도가 이루 말할 수 없을 정도로 크다고 볼 수 있다.(중략)

A study on the behaviour of pre-existing single piles to adjacent shield TBM tunnelling from three-dimensional finite element analyses (3차원 유한요소해석을 통한 shield TBM 터널 근접시공에 의한 인접 단독말뚝의 거동에 대한 연구)

  • Jeon, Young-Jin;Jeon, Seung-Chan;Jeon, Sang-Joon;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.23-46
    • /
    • 2020
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of pre-existing single piles to adjacent tunnelling by considering the tunnel face pressures and the relative location of pile tips with respect to the tunnel. The numerical modelling has analysed the effect of the face pressures on the pile behaviour. The analyses concentrate on the ground settlements, the pile head settlements, the axial pile forces and the shear stress transfer mechanism at the pile-soil interface. The head settlements of the pile (the vertical distance between the pile and the tunnel: 0.25D, where D is the tunnel diameter) directly above the tunnel crown with the face pressure 50% of the in-situ horizontal soil stress at the tunnel springline decreased by about 38% compared to corresponding settlements with a face pressure 25% of the in-situ horizontal soil stress at the tunnel springline. Furthermore, it was found that the smaller the face pressure, the larger the tunnelling-induced ground movements and the axial pile forces were and the higher the degree of the shear strength mobilisation at the pile-soil interface. When the piles were outside the tunnel influence zone, compressive pile forces were developed due to tunnelling. It has been found that the ground settlements and the pile settlements are heavily affected by the face pressures and the position of the pile tip relative to the tunnel. In addition, the computed results have been compared with relevant studies previously reported in literature. The behaviour of the piles has been extensively examined and analysed by considering the key features in great detail.

The Response of a Single Pile and Pile Groups to Tunnelling Performed in Weathered Rock (풍화암에서 실시된 터널굴착으로 인한 단독말뚝 및 군말뚝의 거동)

  • Lee, Cheol Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5C
    • /
    • pp.199-210
    • /
    • 2012
  • The effects of tunnelling in weak weathered rock on the behaviour of a pre-existing single pile and pile groups ($3{\times}3$ and $5{\times}5$ pile groups) above a tunnel have been studied by carrying out three-dimensional (3D) elasto-plastic numerical analyses. Numerical modelling of such effects considers the response of the single pile and pile groups in terms of tunnelling-induced ground and pile settlement as well as changes of the shear transfer mechanism at the pile-soil interface due to tunnelling. Due to changes in the relative shear displacement between the pile and the soil at the pile-soil interface with tunnel advancement, the shear stresses and axial pile force distributions along the pile change drastically. Based on the computed results, upward shear stresses are induced up to about Z/L=0.775 from the pile top, while downward shear stresses are mobilised below Z/L=0.775, resulting in a reduction in the axial pile force distribution with depth equivalent to a net increase in the tensile force on the pile. A maximum tensile force of about $0.36P_a$ developed on the single pile solely due to tunnelling, where $P_a$ is the service axial pile loading prior to tunnelling. The degree of interface shear strength mobilisation at the pile-soil interface was found to be a key factor governing pile-soil-tunnelling interaction. Overall it has been found that the larger the number of piles, the greater is the effect of tunnelling on the piles in terms of pile settlement, while changes of the axial pile forces for the piles in the groups are smaller than for a single pile due to the shielding effect. The reduction of apparent allowable pile capacity due to tunnelling-induced pile head settlement was significant, in particular for piles inside the groups.

A study on the effect of the locations of pile tips on the behaviour of piles to adjacent tunnelling (말뚝선단의 위치가 터널근접 시공에 의한 말뚝의 거동에 미치는 영향에 대한 연구)

  • Lee, Cheol-Ju;Jeon, Young Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.91-105
    • /
    • 2015
  • In the current work, a series of three-dimensional (3D) finite element analyses have been performed to study the effects of the locations of pile tips on the behaviour of single piles to adjacent tunnelling. In the numerical modelling, several key issues, such as tunnelling-induced pile head settlements, axial pile forces, interface shear stresses and apparent factors of safety have been studied. When the pile tips are inside the influence zone which considers the relative pile tip location with respect to the tunnel position, tunnelling-induced pile head settlements are larger than those computed from the greenfield condition. However, when the pile tips were outside the influence zone, an opposite trend was observed. When the pile tips were inside the influence zone, tunnelling-induced tensile pile forces developed; however, when the pile tips were outside the influence zone, tunnelling-induced compressive pile forces were mobilised, associated with larger settlements of the surrounding soil than the pile settlements. It has been shown that the increases in the tunnelling-induced pile head settlements have resulted in reductions of the apparent factor of safety by about 50% when the pile tips are inside the influence zone, therefore severly affecting the serviceability of piles. The pile behaviour, when considering the location of pile tips with regards to the influence zone, has been analysed in great detail by taking the tunnelling-induced pile head settlements, axial pile force and apparent factor of safety into account.

A Study for Improved Design Criteria of Composite Pile Joint Location based on Case Analysis (사례 분석을 통한 복합말뚝 이음위치의 설계 기준식 개선 연구)

  • Hwang, Uiseong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.3
    • /
    • pp.21-30
    • /
    • 2019
  • Composite pile, which is composed of the steel pipe pile in which the large horizontal force acts and the PHC pile in which the small horizontal force acts by a special connecting devices, is being commercialized as a base material for civil engineering structures. The core of such a composite pile can be said to be a design criterion for estimating the joint position and stability of the connection device between steel pipe pile and PHC pile. In Korea, there is no precise specification for the location of composite pile joints. In the LH Design Department (Korea Land & Housing Corporation, 2009), "Application of composite pile design and review of design book marking" was made with reference to Road Design Practice Volume 3 (Korea Expressway Corporation, 2001). this is used as a basis of the design of the composite pile. It can not be regarded as a section change of the composite pile, so it has a limitation in application. Therefore, In this study, we propose a design criterion for the location of the section of the composite pile (joint of steel pipe pile and PHC pile) and evaluate the stability and economical efficiency of it by using experimental method and analytical method. Analysis of composite pile design data installed in 79 domestic bridges abutment showed that the stresses, bending moments, and displacements acting on the pile body and connection of the pile were analyzed. Through the redesign process, it was confirmed that the stresses generated in the connecting device occur within the allowable stress values of the connecting device and the PHC pile. In conclusion, the design proposal of composite pile joint location through empirical case study in this study is an improved design method considering both stability and economical efficiency in designing composite pile.

Axial Behavior of Non-Displacement Tapered Piles in Sand (모래지반에서 비배토 테이퍼말뚝의 연직거동 특성)

  • Paik, Kyu-Ho;Lee, Jun-Hwan;Kim, Dae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.8
    • /
    • pp.35-45
    • /
    • 2007
  • It is known that the response of piles is affected by the shape of pile as well as soil conditions. In order to investigate the characteristics of the axial responses and bearing capacities of non-displacement tapered and cylindrical piles in sands, 12 model pile load tests using a calibration chamber were conducted on model tapered and cylindrical piles, which were specially manufactured to measure the base and shaft load capacities independently. Results of the model tests showed that the shaft load of tapered piles continuously increased with pile settlement, whereas the shaft load of cylindrical piles reached ultimate values at a settlement equal to 4% of pile diameter. Therefore, taper piles have greater shaft loads than cylindrical one at the same settlement. It is also observed that the total load capacity of tapered piles is lower than cylindrical piles for dense sand but is greater than that of cylindrical piles for medium sand. The ultimate unit base resistance of tapered piles was greater than that of cylindrical piles for lateral earth pressure ratio greater than 0.4, and the shaft resistance was greater than that of cylindrical piles irrespective of lateral earth pressure ratio.

Efficient Arrangement of Root Piles in Reinforcing the Strip Footing on a Sand Ground (기호보강을 위한 그물식 뿌리말뚝의 효과적인 배치)

  • 이원택;박영호
    • Geotechnical Engineering
    • /
    • v.10 no.2
    • /
    • pp.57-68
    • /
    • 1994
  • To find out the most efficient arrangement of root piles reinforcing sandy soil under a strip footing, a series of model tests for the patten A of by R.H. Bassett and N.C. Last are carried out. In the model test, the variables adopted are a pile length, longitudinal spacing, and the number of rows of piles. According to the results, the most efficient longitudinal spacing of piles is six times of a pile diameter. When the pile length exceeds five times of footing width, no further increase of reinforcing effect is observed. In the pattern A, piles of second row exhibit the largest reinforcing effect and the fifth row show no significant reinforcing effect on the soil.

  • PDF

A Study on the Influences of Shape and Installion Method on the Ultimate Uplift Capacity of Model Piles in Sand (모래지반에서 말뚝의 모양과 설치방법이 모형말뚝의 극한상장지지력에 미치는 영향)

  • 송영우
    • Geotechnical Engineering
    • /
    • v.8 no.3
    • /
    • pp.5-12
    • /
    • 1992
  • This paper performs a study on the influences of shape and installation method on the ultimate uplift capacity of model piles in sand. Several model piles of different shape, such as straight sided, single-underreamed, multi-underreamed and anchor plate are used. The effects of installation method are studied with buried, driven and vibrotriven piles. Based on model test results, it has been found that when the foundation is subjected to atrial up- lift and compressive load as well, a single-underreamed pile is most effective. When the loading is axial uplipt only, it is likely that anchor plate would be most efficient. Installation method and tip configuration of pile have significant influnce on uplift resistance.

  • PDF