• Title/Summary/Keyword: 막장안정 평가기법

Search Result 11, Processing Time 0.018 seconds

A study on the evaluation method and reinforcement effect of face bolt for the stability of a tunnel face by a three dimensional numerical analysis (터널막장안정 평가기법 및 막장볼트의 보강효과에 관한 수치해석적 연구)

  • Kim, Sung-ryul;Yoon, Ji-Sun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.1
    • /
    • pp.11-22
    • /
    • 2009
  • Tunnel excavation with several sections and appropriate auxiliary measures such as face bolt and pre-grouting are widely used in case of weak and less rigid ground for the stability of a tunnel face during excavation. This papers first described the evaluation methods proposed in technical literature to maintain the tunnel face stable, and then studied by FEM analysis whether face reinforcement is need in what degree of ground deformation and strength features for the stability of a tunnel face when excavating by full excavation with sub-bench. Lastly, a three dimensional FEM analysis was performed to study how the tunnel face itself and the ground around the tunnel behave depending on different bolt layouts, length of bolts, number of bolts. There were relative differences in comparison of results on the stability of a tunnel face by a theoretical evaluation methods and FEM analysis, but the same in reinforced effect of face. It was found that the stability of a tunnel face can be obtained with face bolt installed longer than 1.0D (tunnel width), bolt density of about 1 bolt per every $1.5\;m^2$ (layout of grid type), and reinforcement area of $120^{\circ}$ arch area of upper section.

Inference of RMR Value Using Fuzzy Set Theory and Neuro-Fuzzy Techniques (퍼지집합이론 및 뉴로-퍼지기법을 이용한 RMR 값의 추론)

  • 배규진;조만섭
    • Tunnel and Underground Space
    • /
    • v.11 no.4
    • /
    • pp.289-300
    • /
    • 2001
  • In the design of tunnel, it contains inaccuracy of data, fuzziness of evaluation, observer error and so on. The face observation during tunnel excavation, therefore, plays an important role to raise stability and to reduce supporting cost. This study is carried out to minimize the subjectiveness of observer and to exactly evaluate the natural properties of ground during the face observation. For these purpose, fuzzy set theory and neuro-fuzzy techniques in artificial intelligent techniques are applied to the inference of the RMR value from the observation data. The correlation between original RMR vague and inferred RM $R_{_FU}$ and RM $R_{_NF}$ values from fuzzy set theory and neuro-fuzzy techniques is investigated using 46 data. The results show that good correlation between original RMR value and infected RM $R_{_FU}$ and RM $R_{_NF}$ value is observed when the correlation coefficients are |R|=0.96 and |R|=0.95 respectively. From these results, applicability of fuzzy set theory and neuro-fuzzy techniques to rock mats classification is proved to be sufficiently high enough. enough.

  • PDF

Study on the Fuzzy Inference System for Objectivity of Ground Evaluation in Tunnelling (터널지반 평가의 객관화를 위한 퍼지추론시스템 연구)

  • 조만섭;김영석
    • Tunnel and Underground Space
    • /
    • v.13 no.1
    • /
    • pp.6-19
    • /
    • 2003
  • This study has for its object to increase an objectivity of the observation result in the face mapping of tunnel and to suggest the reasonable support and reinforcement methods to be considered the rock properties. It was developed in this study to the tunnel stability evaluation system(Prototype NFEST) to be used fuzzy set theory and neuro-fuzzy techniques, and this system was verified according to the reliability evaluation between the 36 learning data and the inferred results. When it summarized the results; (1) 12 evaluation items and ranges were proposed to be modified basis on the RMR which are well known to the domestic workers. (2) It was shown that correlation coefficient(│R│) between $RMR_{inf}$ inferred by 12 items and $RMR_{org}$ due to arithmetic total, $RMR_{chk}$ due to subjective judgement of observer are relatively high relationship with each 0.83 and 0.79. (3) Inferred result of the total tunnel safety shows also a good relationship with $RMR_{inf}$ (│R│=0.7) and the rock weathering(│R│=0.84).

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.

Application of risk analysis and assessment considering tunnel stability and environmental effects in tunnel design (터널 안정성 및 환경성을 고려한 위험도 평가기법의 적용)

  • Kim, Young-Geun;Kim, Do-Hyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2008
  • Recently, because of the various factors by uncertainty of underground, the risks in tunnelling have been occurred increasingly. Therefore, it is very important to estimate and control the risks considering geotechnical conditions for tunnel stability and environmental problems by tunnel construction. In this study, the risk analysis for tunnel stability was carried out by classifying the risk factors such as ground support capacity, ground settlement, the inflow of groundwater into the tunnel and the damage by the earthquake. Also, the risk assessment for the environmental problems was performed by calculating the vibration and noise by blasting and the drawdown of the groundwater level caused by tunnel construction. Each risk factor was evaluated quantitatively based on the probabilistic and statistic technique, then it was analyzed the distribution characteristic along overall tunnel site. Finally, it was evaluated that how much each risk factor influences on the construction cost with a period for tunnel construction, so it is possible to perform reasonable tunnel design which was capable of minimizing the risks in the tunnel construction.

  • PDF

Rock Classification Prediction in Tunnel Excavation Using CNN (CNN 기법을 활용한 터널 암판정 예측기술 개발)

  • Kim, Hayoung;Cho, Laehun;Kim, Kyu-Sun
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.9
    • /
    • pp.37-45
    • /
    • 2019
  • Quick identification of the condition of tunnel face and optimized determination of support patterns during tunnel excavation in underground construction projects help engineers prevent tunnel collapse and safely excavate tunnels. This study investigates a CNN technique for quick determination of rock quality classification depending on the condition of tunnel face, and presents the procedure for rock quality classification using a deep learning technique and the improved method for accurate prediction. The VGG16 model developed by tens of thousands prestudied images was used for deep learning, and 1,469 tunnel face images were used to classify the five types of rock quality condition. In this study, the prediction accuracy using this technique was up to 83.9%. It is expected that this technique can be used for an error-minimizing rock quality classification system not depending on experienced professionals in rock quality rating.

Application of the Evaluation System of Rock Mass in a Mountain Tunnel Constructed by NATM (NATM 시공 산악터널에서의 암반평가시스템 적용 연구)

  • 김영근;장정범;정한중
    • Tunnel and Underground Space
    • /
    • v.5 no.4
    • /
    • pp.297-307
    • /
    • 1995
  • 터널은 긴 선상구조물로서 사정조사결과와 다른 지질조건이 나타날 수 있으므로, 안전하고 합리적인 터널공사를 위해서는 시공중 지질조건에 적합한 지보설계를 실시하는 것이 필수적이다. 이를 위해서는 시공중 터널주변자반에 대한 정량적이고 공학적인 평가가 매우 중요하다. 그러나 시공중 암반을 평가하는 것은 매우 어렵고 조사자의 경험과 지식의 차이에 의해 평가정도가 크게 달라져 그 불합리성이 심화되고 있는 실정으로 터널주변암반에 대한 합리적인 평가방법이 절실히 요구되고 있다. 본 연구에서는 터널화상처리, GeoCAD, 역해석으로 구성된 평기시스템을 개발하였다. 본 시스템은 터널막장에서의 조사.시험 및 화상처리기법을 통하여 암반분류.평가를 실시하고, 터널주변 지반구조 및 굴착/지보과정의 3차원 모델링을 통하여 전방지질을 예측가능하게 하며, 터널계측자료의 역해석을 통하여 터널주변 지반의 물성을 정량적으로 평가할 수 있는 체계적이고 종합적인 평가시스템이다. 또한 이를 NATM 공법으로 시공되는 터널현장에 적용하므로써 본 시스템의 현장적용성을 검증하였으며, 이를 통해 적절한 지보공을 시공하여 터널의 안정성을 확보하고 합리적인 시공관리를 달성할 수 있었다.

  • PDF

Prediction of fault zone ahead of tunnel face using x-Rs control chart analysis for crown settlement (천단변위의 x-Rs 관리도 분석을 이용한 터널 막장 전방 단층대 예측)

  • Yun, Hyun-Seok;Seo, Yong-Seok;Kim, Kwang-Yeom
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.4
    • /
    • pp.361-372
    • /
    • 2014
  • A measurement of tunnel displacement plays an important role for stability analysis and prediction of possible fault zone ahead of tunnel face. In this study, we evaluated characteristics of tunnel behaviour due to the existence and orientation of fault zone based on 3-dimensional finite element numerical analysis. The crown settlement representing tunnel behaviour is acquired at 5 m away from tunnel face in combination with x-Rs control chart analysis based on statistics for trend line and L/C (longitudinal/crown displacement) ratio in order to propose risk management method for fault zone. As a result, x-Rs control chart analysis can enable to predict fault zone in terms of existence and orientation in tunnelling.

A Case Report on Snapping Hip Patient Treated by Chuna Manual Therapy for Meridian Sinew System (경근추나 치료 후 호전된 발음성 고관절 환자 치험례)

  • Kim, Wu-Young;Lee, Jae-Young;Han, Sang-Yup;Kong, Deok-Hyun;Park, Jai-Young;Lee, Hyun-Jong
    • The Journal of Churna Manual Medicine for Spine and Nerves
    • /
    • v.5 no.2
    • /
    • pp.43-48
    • /
    • 2010
  • Objectives : This study is designed to evaluate the effect of conservative oriental medical treatment using Chuna manual therapy for meridian sinew system for snapping hip patient who have hip joint movement system impairment. Methods : 28-year old snapping hip patient who have hip joint movement system impairment was treated with conservative oriental medical treatment using Chuna manual therapy for meridian sinew system. The improvement of the patient was evaluated by Numerical rating scale(NRS), Snapping Sound Degree(SSD), Range of Motion(ROM). Results: After 13 times treatment, the patient had significant improvement in Numerical rating scale(NRS), Snapping Sound Degree(SSD), Range of Motion(ROM). Conclusions: If hip joint movement system impairment cause a snapping hip, we can treat with Chuna manual therapy for meridian sinew system.

  • PDF