• Title/Summary/Keyword: 막장관찰기록지

Search Result 2, Processing Time 0.015 seconds

A Study on Problems and Improvements of Face Mapping during Tunnel Construction (국내 터널시공 중 막장지질조사의 문제점 및 개선방안에 관한 연구)

  • Kim Kwang-Yeom;Kim Chang-Yeng;Yim Sung-Bin;Yun Hyun-Seok;Seo Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.16 no.3 s.49
    • /
    • pp.265-273
    • /
    • 2006
  • Face mapping during tunnel construction is useful and critical to predict the characteristics and stability condition of following tunneling sections and to select optimum support pattern. Therefore, a detailed geological survey of the tunnel faces, as important as a routine underground survey and a RMR evaluation, should provide critical information of the tunnel face condition in terms of the engineering geological condition and the safety of working environment for the following tunneling section. But the results of the face investigation have not been applied satisfactorily during tunneling due to limitation of technique, experience and time. This study analyze problems of face mapping in tunnel construction site by using statistical results of face mapping sheets obtained from completed tunnels, and suggest several opinions to improve face mapping during tunnel construction.

Development of Mobile System Based on Android for Tunnel Face Mapping (터널 막장 매핑을 위한 안드로이드 기반의 모바일 시스템 개발)

  • Park, Sung Wook;Kim, Hong Gyun;Bae, Sang Woo;Kim, Chang Yong;Yoo, Wan Kyu;Lee, Jin Duk
    • The Journal of Engineering Geology
    • /
    • v.24 no.3
    • /
    • pp.343-351
    • /
    • 2014
  • Tunnel face mapping plays an important role in risk analysis and infrastructure support decisions during tunnel construction. In this study, a digital mapping system using a mobile device is employed instead of existing face-mapping methods that rely upon face mapping sheets. The mobile device is then connected to the main server in the field, where a tunnel-specific database is compiled automatically. This information provides real-time feedback on the tunnel face to construction personnel and engineers, thus allowing for rapid assessment of tunnel face stability and infrastructure needs. The Douglas-Peucker algorithm, among others, is employed to resolve problems arising from the detailed mapping and speed problem by data accumulation. This system is expected to raise program optimization through field verification and additional functional improvements.