• 제목/요약/키워드: 마스터(기준) BOM

검색결과 1건 처리시간 0.012초

전동차 유지보수를 위한 BOM 체계 구축에 관한 (A Study on BOM System Constructing for Rolling Stock Maintenance)

  • 손영진;이강원
    • 한국철도학회논문집
    • /
    • 제10권2호
    • /
    • pp.195-200
    • /
    • 2007
  • The most important part of RIMS(Rolling Stock Information Maintenance System) project is to construct BOM(Bill of Material). BOM is a listing or description of raw materials, parts, and assemblies that define a product. To construct BOM for RIMS is not a easy task due to several reasons such as data base scale and flexibility, proper integration between physical BOM and functional BOM, interoperability with other systems, etc. In this study we show several principles that Seoul Metro takes to get over the difficulties mentioned above. Based on these principles we propose the methodology Seoul Metro employs to construct BOM efficiently. We also discuss the applicability of BOM in several fields.