• Title/Summary/Keyword: 마감 자재

Search Result 59, Processing Time 0.019 seconds

A Simple Formula for the Number of Lifting Times of Finishing Materials in High-rise Complex Building Construction (마감자재 양중횟수 산정 약산식 제안 - 초고층 주상복합 건물)

  • Mun Min-Sik;Choi Seock-Hyun;Hyun Chang-Taek;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.622-625
    • /
    • 2003
  • The purpose of the study is to propose a simple formula of lifting times of finishing materials on establishing the high-rise complex building, it is expected to help the efficient planning of lifting. The planning of lifting the finishing materials becomes important as the buildings get higher. The efficient level of lifting times has been calculated from 'Packaging' to improve the existing studies on the planning of lifting ; 'Packaging' means 'Making a bundle as one unit' basing on the characteristics of the individual materials. The simple formula has been produced regarding two variables of the typical floor area and the number of rooms per area.

  • PDF

A Study of Material Information System Model For Building Finishes (건축 마감자재정보 시스템 모델 연구)

  • Won, Seo-Kyung;Kang, Min-Woo;Woo, Ji-Youn;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.597-601
    • /
    • 2006
  • There are considerable amount of man power and time spent for analysis and selection of various materials due to the inadequate application system and rapid searching process of material related information in each stage of building production process. Also, due to the insufficiency in recycling system of important information created for each process, they are hoarded at each task stage and project completion. As a result, because of the repetition of the similar/identical tasks on each process, it is the major reason for impeding the efficient employment of manpower of the company and decreasing competition of the company. Moreover, in selecting finish material in the project field, there are many difficulties due to the lack of technical information such as product characteristics and field applications. The construction quality also affects the profit and loss of the product which calls for a need to develop continued information management system that the finish material related examples could be shared in real time. The objective of this study is to propose a building finish material information which the real time research and application is possible to raise the productivity. TO do this, the current material information task status analysis and questionnaire research should be conducted to understand the demand of system development and reflect the result onto the system for easy access and application. Therefore, the building finish material information system for enhancement of productivity of construction task proposed in this study is expected to be utilized in enhancement of construction quality, maximization of company profit, and strengthening of company competition.

  • PDF

A Decision-Making Model of Integrated Vertical and Horizontal Move Plan for Finishing Material in Righ-Rise Building Construction (고층건물공사 마감자재의 수직$\cdot$수평이동계획이 통합된 의사결정모델)

  • Ahn Byung-Ju;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.47-58
    • /
    • 2001
  • Of all the site logistics technologies in high-rise building construction, both vertical and horizontal move plan, are the most imperative factors. And the horizontal plan follows lift-up plan as of the vertical plan. However though it may be, temporary lifts on site are numbered by heuristic formulas. The quantity of finishing material cannot be converted into lift-up load per finishing material. The lift-up plan cannot be evaluated the feasibility for finishing material move plan by a reasonable evaluation methodology. The horizontal plan is far from the vertical one. And the information as an input data for the horizontal plan is devoid of package unit size, length, and volume per finishing material. These can hardly result in reasonable and detail decision on how much to use temporary lifts, how long to use these, and where to deposit each finishing material. Therefore, this study is to suggest a decision-making model that can integrate vertical and horizontal material move plan in high-rise building construction and make a decision the plans systematically. And the study is to explain the concept, methodology, and contents of the model applied to a virtual project, named as MT 130 (Millennium Tower 130). By the model, the planner can shift his/her thinking framework on site logistics management products-oriented Into process-oriented. He/she can manage a project by the framework as system thinking, evaluate the feasibility of a lift-up plan, and decide the horizontal plan integrated with the lift-up.

  • PDF

A Study of the High-rise building's Lift-up Management - through Division of Loading Factors of Equipment materials (초고층 건축 공사의 효과적인 양중 제안 - 설비공사 양중부하 분배 개선 방안)

  • Chung Yun-Woo;Kim Eun-Sang;Suh Hyun-Ah;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.539-542
    • /
    • 2004
  • Nowadays, High-rise building becomes higher and bigger than ever. As a result, lots of construction materials are needed at the same times. Because of divided diverse process of construction, several different Processes concur simultaneously with complexity of procurement. So, effective construction material supply and lift-up are essential part of the spot. Especially, when ending part of construction, there are much conflict between finishing and equipment materials also problems of folding lift-up. The Purpose of this paper is suggesting better effective lift-up system through analysis of loading factors.

  • PDF

A Layout Planning Optimization Model for Finishing Work (건축물 마감공사 자재 배치 최적화 모델)

  • Park, Moon-Seo;Yang, Young-Jun;Lee, Hyun-Soo;Han, Sang-Won;Ji, Sae-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.43-52
    • /
    • 2011
  • Unnecessary transportation of resources are one of the major causes that adversely affect construction site work productivity. Therefore, layout related studies have been conducted with efforts to develop management technologies and techniques to minimize the resource transportation made at site-level. However, although the necessity for floor-level layout planning studies has been increasing as buildings have become larger and floors have become more complicated, studies to optimize the transportation of materials inside buildings are currently not being actively conducted. Therefore, in this study, a model was developed using genetic algorithms(GA) that will enable the optimization of the locations of finishing materials on the work-floor. With the established model, the arrangement of diverse materials on complicated floors can be planned and the optimized material layout planning derived from the model can minimize the total material transportation time spent by laborers during their working day. In addition, to calculate travel distances between work sites and materials realistically, the concept of actual travel distances was applied. To identify the applicability of the developed model and compare it with existing methodologies and analyze it, the model was applied to actual high-rise residential complexes.

Optimization of real-time path finding for material handling of finishing work considering the logistics flow (물류량을 고려한 마감공사 자재운반의 실시간 경로탐색 최적화 연구)

  • Kim, Wansoub;Lee, Dongmin;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.170-171
    • /
    • 2015
  • Resource procurement and material handling are considered as a significant part of construction project especially in large or tall building construction site. There are multiple variables that must be considered in a construction site during finishing work such as movement of materials, equipments, and workers. Therefore, it is difficult for construction workers to find the material handling path solely by intuition. The aim of this study is to propose a real-time path finding model suitable for complicated logistics flow in the field. The model explores the optimal transport path of finishing material with its basis on optimization algorithm, and it determines the direction of the Smart Sign. The proposed model is expected to be utilized for planning of efficient finishing material handling.

  • PDF

Experimental Study on the Effect of Environmentally Friendly Materials on Indoor Air Quality in New Apartment Buildings (신축 공동주택에서의 친환경 마감자재 사용에 따른 실내공기질 개선효과 실증연구)

  • Park, Young-Sok;Lee, Gyu-Dong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.139-142
    • /
    • 2006
  • The indoor air quality of new apartment buildings, which is known to cause sick housing syndrome, has become a major concern among apartment residents as well as construction companies in Korea. In this study, the effects of environmentally friendly materials and ventilation system are evaluated to compare the strategies applied to improve indoor air quality at the pre-occupancy stage. Six residential units are tested under three conditions : one unit is consisted of environmentally friendly materials and ventilation system, another unit is consisted of environmentally friendly materials and non-ventilation system, and the other four units are consisted of common materials and non-ventilation system.

  • PDF

두엄누리회보 제49호

  • Korea Organic Ferlizer Assocation
    • 두엄누리회보
    • /
    • s.49
    • /
    • pp.1-4
    • /
    • 2007
  • 유기질비료 지원사업 개선방안 설명회/유통제품에 대한 샘플 채취는 아직 어려워/축분 퇴비 품평회/2007년도 농업연수원 부산물비료 생산과정 교육 실시/친환경 유기농자재 목록 공시제도 6월 30일 마감

  • PDF

The Improvement Plans for Material Flow and Productivity Improvement of Low-e Double Glazing on Site (Low-e 복층유리의 현장 내 물류흐름 파악 및 생산성 향상을 위한 개선안 방향)

  • Lee Sang-Hyuk;Lim Myung-Bok;Lee Jae-Sung;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-344
    • /
    • 2003
  • There are many problems in management of high-rise building construction performed in downtown area due to limited spaces and equipments for increasing kinds and quantities of material. By these restrictions, problems such as increase of construction cost. delay of construction period, decrease of productivity, occurrence of accident are caused. Recently, studies on JIT concept have focused on construction materials as a solution for the problems. But, studies about finishing material are insufficient yet. Accordingly, this study suggests flowing of current material management, JIT management effect, and development direction of lifting-up and procurement system with Low-emissivity double Glazing, among of main finishing materials.

  • PDF

Building construction process improvement using prefabricated materia (공업화자재의 활용을 통한 공정합리화)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.90-96
    • /
    • 2003
  • The purpose of this study is to present an improvement building construction process by using prefabricated materials. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Non-value adding activities were found at existing slab form work process by current state mapping(CSM) 2) Future state mapping(FSM) suggest process Integration to slab form work. 3) Slab form work is analyzed reduction time-cost by prefabricated material. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction and application of prefabricated material should be increased.