• Title/Summary/Keyword: 록필

Search Result 2, Processing Time 0.016 seconds

A Study on the Face Slab Deformation of Concrete Faced Rockfill Dams During Initial Impoundment (초기 담수 중 콘크리트 표면차수벽형 석괴댐의 슬래브 거동에 관한 연구)

  • Won, Myoung Soo;Kim, Hyeong Joo;Jung, Young Chae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.129-139
    • /
    • 2015
  • Concrete-Face Rock-Fill Dams (CFRDs) are rock-fill dams with watertight-concrete slabs on its upstream slope instead of its central earth cores. The design for CFRDs are still largely empirical and typically based on past experiences. This paper presents a description of the concrete face slabs and leakage behaviors of two post-constructed CFRDs based on the data gathered through instrumentation during the initial impoundment. The results show that the strain on the concrete face slab and the horizontal displacements of the vertical slab joints are slightly affected by both the seasonal temperature change and water loading during the initial impoundment. The deformation of perimetric joints are less affected by the temperature change, however it is significantly affected by the water loading during the initial impoundment. The leakage rate is significantly affected by the hydrostatic load and the deformation of the perimetric joints.

A Study On The Deformation Behavior of Post-Construction Crest Settlement, Face Slab Deformation, and Leakage of Concrete Faced Rockfill Dams (콘크리트 표면차수벽형 석괴댐의 준공 후 정부침하와 슬래브 변형 및 누수 거동에 관한 연구)

  • Kim, You-Seong;Choi, Jae-Seon;Won, Myoung-Soo;Lee, Hee-Hun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.8 no.2
    • /
    • pp.31-39
    • /
    • 2009
  • The purpose of present study performed 27 CFRD cases analyses to predict and effectively use post-construction crest settlement, face slab deformation, and leakage as indexes for the maintenance and management of concrete faced rockfill dams(CFRD). The results showed that the range of post-construction crest settlement suggested by Sherard and Cooke (1987), and Clements (1984) had a good agreement in the case analyses using rockfills with very high intact strength, but it had a trend which underestimated crest settlement in the cases using rockfills with medium to high intact strength. The leakage case analyses showed that leakage is mainly caused by face slab deformation due to the water load, the maximum leakage in general was observed during the first reservoir filling, and leakage was rapidly increasing when the dam height exceeds 125m.

  • PDF