• 제목/요약/키워드: 라이프 사이클 코스트 평가 모델

검색결과 1건 처리시간 0.018초

건축설비시설의 갱신을 위한 최적 대체안 선정모델 개발에 관한 연구 (A Study on the Development of Optimal Alternative Selection Model to Renew Building Equipments System)

  • 윤동원;이정재;정광섭;한화택;정순성
    • 설비공학논문집
    • /
    • 제12권10호
    • /
    • pp.950-961
    • /
    • 2000
  • The objective of this study is to develop optimal alternative selection model for renewing building equipments system. Cost Breakdown Structure of LCC in HVAC systems are deduced from resonable data and factors. As for Cost Breakdown Structure of LCC in HVAC system, pertinent level, title, CBS number, and block number are determined efficiently. Especially, in addition to current cost factor, it is possible to make Cost Breakdown Structure using present worth method more clear. A model of POWER LCC ver 1.0 used to analyze primary cooling system, heating system, and air conditioning system are POWER LCC ver 1.0_/sub SYSTEM/ : C1+ C2- C3+ C4+ C5+ C6+ C7±C8+ C9- C10/sub -1/+ C10/sub -2/+ C10/sub -3/, and is implemented with consideration of Cost Breakdown Structure and their summation using present-worth method. It is programmed with one of scientific languages, MATLAB 5.3.

  • PDF