Implementation of Automation Program and Efficient Cable Drum Schedule using Dynamic Programming Algorithm (동적 계획 알고리즘을 이용한 효과적인 케이블 드럼 스케줄 및 자동화 프로그램 구현)

  • Park, Ki-Hong;Lee, Yang Sun
    • Journal of Digital Contents Society
    • /
    • v.17 no.4
    • /
    • pp.257-263
    • /
    • 2016
  • Cable drum schedule is the final step for the electrical equipment of the power plant, and is assigned cables to efficiently cable drum. In this paper, we have implemented an automated program which cables are scheduled in accordance with the capacity of the cable drum for each cable code. Proposed cable drum schedule was applied to the dynamic programming algorithm to effectively solve the optimization problem, and the implemented program is conducted so as to verify the proposed model. The experiment results show that implemented program eliminates the errors that can occur existing method, so we were able to reduce the design time of cable drum schedule. Cables for the electrical equipment of the power plant is designed to at least 2 million units or more. Thus the automation program to provide applies, it is considered that the design time of the cable drum schedule can be greatly reduced without serious error.

Implementation of Cable Drum Scheduling Algorithm for Productivity Enhancement of Power Plant Electrical Installations (발전소 전기설비의 생산성 향상을 위한 케이블 드럼 스케줄링 알고리즘 구현)

  • Lee, Yang-Sun;Park, Ki-Hong;Choi, Hyo-Beom;Oh, Ji-Hyun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.10a
    • /
    • pp.770-771
    • /
    • 2015
  • In this paper, we proposed and implemented the automation of cable drum scheduling which is required a considerable construction cost for electrical equipment in power plant. Implemented cable drum scheduling can be reduced the calculation time of cable drum scheduling, and it is possible to minimize the consuming time of cable drum scheduling than conventional methods. Some experiments are conducted to verify the proposed method, and as a result, the automation of cable drum scheduling is well performed, enabling cables can be optimized and scheduled to fit the drum capacity with productivity enhancement of electrical installations.

  • PDF

An Application Method and Effect Analysis of the DBR(Drum-Buffer-Rope) Method Under the Re-entrant Process (재투입공정 하에서 DBR 기법 적용 방안 및 효과분석)

  • Yang, Hyunjun;Jeong, Sukjae;Yoon, SungWook
    • Journal of the Korea Society for Simulation
    • /
    • v.29 no.1
    • /
    • pp.57-69
    • /
    • 2020
  • Many researchers have recommended that DBR scheduling would be an efficient method to maintain the balance of their workload among many processes in the general flow shop. However, as product variety has increased in recent years, the process has become more complex and requires the re-entrance of raw materials and work in process. The re-entrant line has known for the complex manufacturing process that raw materials are repeatedly processed on the same machine. This study reviews the applicability of DBR against the re-entrant manufacturing line due to the distinguishing characteristics and the higher complexity caused by multiple visits of a job into the identical process. In order to apply the DBR method to the re-entrant process, the main idea is to reconstruct re-entrant process into a virtual flow process(loop) that has a single bottleneck. This study discusses the following two questions. First, DBR is also superior to traditional scheduling methods against re-entrant manufacturing line. And how we structure and detect the system bottleneck (or sub-bottleneck) through drum-buffer-rope concepts. To answer the above questions, we experimented and analyzed the effects of the applicability of DBR under the general re-entrant process model(TRC, Technology Research Center). As a result, we have identified a balance between loops for cycle time and work in process.