• Title/Summary/Keyword: 동적 공정계획

Search Result 17, Processing Time 0.023 seconds

Short-Time Production Scheduling and Parts Routing for Flexible Assembly Lines (유연한 조립 시스템의 단기 생산 스케듈링과 라우팅에 관한 연구)

  • Sin, Ok-Geun
    • The Transactions of the Korea Information Processing Society
    • /
    • v.2 no.6
    • /
    • pp.823-830
    • /
    • 1995
  • A reactive piloting policy for Flexible Assembly Lines (FAL) is proposed, where the sequencing of the operations as well as the assignment of tasks to manipulators are not predetermined but driven by the actual state of the FAL For all work-in-process coming from a manipulator, the next destination is determined by minimizing a temporal criterion taking into account the time needed to reach the destination, the load of the manipulator to reach, the durati on of the operation to be completed in the destination manipulator, and the availability of product components in this manipulator. The purpose of proposed piloting policy is to manufacture a given quantity of products as rapidly as possible by balancing the amount of work allocated to manipulators and to reduce the efforts required for scheduling the production of short series of diversified products. After introducing the characteristics of assembly processes and FAL modelization, the proposed algorithm is evaluated by simulations. The simulations of the proposed algorithm showed satisfactory results.

  • PDF

Incompatible Batch Scheduling with Setup Time (공정 교체 시간을 고려한 배치작업의 일정관리)

  • 김주일;이영훈
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.103-106
    • /
    • 2000
  • 본 논문은 작업이 공정시간 등의 특성으로 인해 Family 로 구분되어지고 동일한 Family 내의 작업끼리만 배치로 구성할 수 있는 제조환경에서의 스케줄링에 관한 연구이다. 이때 배치의 최대크기는 정해져 있어 그 이하의 수로 구성된 작업들로 하나의 배치를 구성할 수 있다. 동일 Family 내의 작업은 작업시간이 동일하고 배치로 구성된 작업이 진행될 때 수에 관계없이 하나의 작업에 소요되는 시간과 동일한 시간이 소요된다. 또한 다른 Family 와의 작업이 이어질 때는 교제시간이 발생한다. 목적함수는 전체지연 시간을 최소화하는 것이며 납기는 동일한 Family 에 있는 작업일지라도 각 작업별로 주어진다. 이 목적함수의 최적해를 구할 수 있는 동적계획법을 제시하고 이를 응용한 발견적 기법을 개발, 적용하여 각각 성능비교를 실시하였다.

  • PDF

Robust Plan Generation and Dynamic Execution for Intelligent Web Service (지능적인 웹서비스를 위한 강건한 계획 생성과 동적 실행 방법)

  • Hwang, Gyeong-Sun;Lee, Seung-Hui;Lee, Geon-Myeong
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2007.04a
    • /
    • pp.320-323
    • /
    • 2007
  • 웹 서비스와 같은 분산된 환경에서, 특정 서비스를 수행하기 위해서는 원격의 컴퓨터나 사이트상에서 다중 에이전트들의 협업을 통해 이루어진다. 이때 서비스는 여러 에이전트들의 복잡한 행위들에 의해 구성된다. 또한 지능적인 서비스를 위해서는 에이전트들의 상태정보, 목적정보, 그리고 계획정보 등을 이용한다. 특히 계획정보는 에이전트들이 일련의 행위들로 구성된다. 하지만 계획수립을 위한, 기존 연구들 대부분은 정적으로 기술된 서비스 명세와 초기상태 정보를 이용하여 특정 목표를 만족시키는 단일 계획 생성 방법을 연구해왔다. 따라서 계획수립이 실행 도중에 기대하지 않은 네트워크 장애나 방해 등으로 서비스 수행을 실패하는 경우, 그 계획은 무효가 되고 다시 계획을 생성 해야만 한다. 그러나 다시 계획을 생성하기 위해서는 많은 시간을 소비하게 될 뿐만 아니라 태스크 중복이 불가피하므로 매우 비효율적이다. 이 논문에서는 강건한 계획수립과 그 계획을 실행하기 위한 효과적인 방법을 제안한다. 즉, 계획수립의 재생성을 피하기 위한 방법으로 단일 계획수립 대신에 실행 가능한 다중 계획들로 표현된 강건한 계획을 생성하는 것이다. 강건한 계획의 행위들이 실행되는 동안, 각 단계마다 실행 가능한 행위를 선택한 후, 그 행위를 실행한다. 그러나 선택된 행위가 실행결과를 낼 수 없을 경우, 대체 가능한 서브 계획 경로를 선택하여 실행한다. 강건한 계획을 표현하기 위해 페트리 넷 기반의 방법을 제안한다. 강건한 계획 생성 방법에서는 이용 가능한 모든 계획들을 입력으로 사용한다. 그 계획수립 방법은 HTN 계획수립기로 잘 알려진 JSHOP2 계획수립기내에 구현하였다. 계획 실행 방법으로는 주어진 강건한 계획에 대하여 행위들이 직접 실행하수 있도록 한다.며 용량에 의존하는 양상을 보였다. $H_2O_2$에 의해 유발(誘發)된 DNA의 손상은 catalase와 deferoxamine에 의해 억제되었지만 DPPD는 억제시키지 못했다. 배기음(排氣飮)은 $H_2O_2$에 의해 유발(誘發)된 ATP의 소실을 회복시켰다. 이러한 실험결과 $H_2O_2$에 의해 유발(誘發)된 세포(細胞)의 손상(損傷)은 지질(脂質)의 과산화(過酸化)와는 다른 독립적인 기전에 의해 일어남을 나타낸다. 결론 : 이러한 결과들로 볼 때 Caco-2 세포(細胞)에서 배기음(排氣飮)이 항산화작용(亢酸化作用)보다는 다른 기전을 통하여 Caco-2 세포안에서 산화제(酸化劑)에 의해 유발(誘發)된 세포(細胞)의 사망(死亡)와 DNA의 손상(損傷)을 방지할 수 있다는 것을 가리킨다. 따라서 본 연구(硏究)는 배기음(排氣飮)이 반응성산소기(反應性酸素基)에 의해 매개된 인체(人體) 위장관질환(胃腸管疾患)의 치료(治療)에 사용할 수 있을 가능성(可能性)이 있음을 제시하고 있다.에 이를 이용하여 유가배양시 기질을 공급하는 공정변수로 사용하였다 [8]. 생물학적인 폐수처리장치인 활성 슬러지법에서 미생물의 활성을 측정하는 방법은 아직 그다지 개발되어있지 않다. 본 연구에서는 슬러지의 주 구성원이 미생물인 점에 착안하여 침전시 슬러지층과 상등액의 온도차를 측정하여 대사열량의 발생량을 측정하고 슬러지의 활성을 측정할 수 있는 방법을 개발하였다.enin과 Rhaponticin의 작용(作用)에 의(依)한 것이며, 이는 한의학(韓醫學) 방제(方劑) 원리(原理)인 군신좌사(君臣佐使) 이론(理論)에서 군약(君藥)이 주증(主症)에 주(主)로 작용(作用)하는 약물(藥物)이라는 것을 밝혀주는

  • PDF

Rescheduling algorithms considering unit failure on the batch process management (회분공정의 장치 고장을 고려한 동적생산계획 기법)

  • Ko, Dae-Ho;Moon, Il
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.1028-1031
    • /
    • 1996
  • Dynamic scheduling is very important in constructing CIM and improving productivity of chemical processing systems. Computation at the scheduling level requires mostly a long time to generate an optimal schedule, so it is difficult to immediately respond to actual process events in real-time. To solve these problems, we developed dynamic scheduling algorithms such as DSMM(Dynamic Shift Modification Method), PUOM(Parallel Unit Operation Method) and UVVM(Unit Validity Verification Method). Their main functions are to minimize the effects of unexpected disturbances such as process time variations and unit failure, to predict a makespan of the updated dynamic schedule and to modify schedule desirably in real-time responding to process time variations. As a result, the algorithms generate a new pertinent schedule in real-time which is close to the original schedule but provides an efficient way of responding to the variation of process environment. Examples in a shampoo production batch process illustrate the efficiency of the algorithms.

  • PDF

Development of an Image Segmentation Algorithm using Dynamic Programming for Object ID Marks in Automation Process (동적계획법을 이용한 자동화 공정에서의 제품 ID 마크 자동분할 알고리듬 개발)

  • 유동훈;안인모;김민성;강동중
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.8
    • /
    • pp.726-733
    • /
    • 2004
  • This paper presents a method to segment object ID(identification) marks on poor quality images under uncontrolled lighting conditions of automated inspection process. The method is based on dynamic programming using multiple templates and normalized gray-level correlation (NGC) method. If the lighting condition is not good and hence, we can not control the image quality, target image to be inspected presents poor quality ID marks and it is not easy to identify and recognize the ID characters. Conventional several methods to segment the interesting ID mark regions fail on the bad quality images. In this paper, we propose a multiple template method, which uses combinational relation of multiple templates from model templates to match several characters of the inspection images. To increase the computation speed to segment the ID mark regions, we introduce the dynamic programming based algorithm. Experimental results using images from real factory automation(FA) environment are presented.

Basin-Wide Real Time Daily Multi-Reservoir Operation Using K-MOSIM (K-MOSIM을 이용한 유역통합 실시간 일 저수지 운영)

  • Lee, Jin-Hee;Ko, Ick-Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.948-952
    • /
    • 2006
  • 인구의 증가와 경제의 발전으로 인해 한정된 수자원에 대한 수요가 급증하였고 향후 고도의 복지사회 구현과 지방 자치화에 따른 각종 용수 수요에 대한 심각한 물 배분 문제가 대두되고 있다. 특히 심각하게 물 배분 문제가 야기될 때 각 수요지점별로 필요한 용수를 공급하기 위해서 단지 상류에서 하류 단으로 물을 배분한다면 수리권의 공정성 문제가 제기되며 물 관리 원칙의 결여에 따른 곤란한 상황이 발생할 수 있다. 이렇게 갈수 및 가뭄 시와 같이 물 배분 문제가 생길시 에는 우선 하천유역 전체의 가용수량을 파악한 후 각 용수 사용별로 중요성을 감안하여 용수공급 우선순위를 설정하여 전 하천 유역을 통하여 일관된 배분을 실시할 수 있는 수자원 최적화 배분 시스템을 개발 할 필요성이 있다. 이러한 문제를 해결하기 위하여 본 연구에서는 한국수자원공사 수자원연구원과 콜로라도주립대학에서 공동 개발한 유역 네트워크 유량 모델(River Basin Network Flow Model)인 K-MODSIM을 이용하여 유역통합 실시간 일 저수지 운영 모델을 개발하였다. 개발된 유역통합 실시간 일운영 모델은 금강유역에 적용하였으며, 금강유역을 12개의 소유역으로 구분하고, 용담댐과 대청댐을 포함하며, 유역관리는 용수공급, 치수대책, 발전수력 및 하천 유지용수의 공급등의 유역내 수자원 관리 상황을 포함하였다. 이처럼 유역의 매우 자세한 세부사항을 고려함으로서 기존에 개발된 모델이 가지고 있던 단순화의 단점을 보완하고 유역의 특성을 최대한 반영하도록 하였다. 또한 유역통합 실시간 일운영 모델의 장기적인 저수지 운영 문제를 해결하기 위해 암시적 추계학적 동적계획법을 사용하여 도출된 월운영룰을 일운영모델에 적용할 수 있는 방법을 제시 하였다.기능으로 구성되어 있으며, 각 기능을 선택하면 해당 화면으로 GUI가 전환된다. 따라서 다량의 측정자료의 신뢰성을 유지하고 이를 모형의 입력자료로 활용하는 일련의 과정을 시스템화하기 때문에 자료의 이상적 유지 관리가 이루어지며 복잡한 2차원 수질해석 모형을 수월하게 운영할 수 있는 시스템으로 개발하였다.제외하면, 부자측정 방법에 의한 유량산정시 가장 큰 오차원인은 홍수시 측정된 유속측선의 위치와 홍수 전후로 측정된 횡단면상의 위치가 일치하지 않는 점과, 대부분 두 측정 구간의 평균값을 대푯값으로 사용한다는 점이다. 본 연구는 다년간의 유량 측정 및 검증 경험과 자료를 토대로 현장에서 부자를 이용하여 측정된 측정성과를 정확도 높은 유량자료로 산정하는데 있어서의 문제점을 도출하고, 이로 인해 발생하는 오차를 추정하여 그 개선방안을 제시해 보고자한다. 더불어 보다 정확한 유량 산정을 위한 기준과 범주를 제시하고자 한다.리적 특성을 잘 반영하며, 도시지역의 복잡한 배수시스템 해석모형과 지표범람 모형을 통합한 모형 개발로 인해 더욱 정교한 도시지역에서의 홍수 범람 해석을 실시할 수 있을 것으로 판단된다. 본 모형의 개발로 침수상황의 시간별 진행과정을 분석함으로써 도시홍수에 대한 침수위험 지점 파악 및 주민대피지도 구축 등에 활용될 수 있을 것으로 판단된다. 있을 것으로 판단되었다.4일간의 기상변화가 자발성 기흉 발생에 영향을 미친다고 추론할 수 있었다. 향후 본 연구에서 추론된 기상변화와 기흉 발생과의 인과관계를 확인하고 좀 더 구체화하기 위한 연구가 필요할 것이다.게 이루어질 수 있을 것으로 기대된다.는 초과수익률이 상승하지만, 이후로는 감소하므로, 반전거래전략을 활용하는 경우 주식투자기간은 24개월이하의 중단기가 적합함을

  • PDF

Exploring Delays of The Mega Construction Project: The Case of Korea High Speed Railway (대형 건설사업의 공기지연분석: 경부고속철도 건설사업을 중심으로)

  • Han, Seung Heon;Yun, Sung Min;Lee, Sang Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.839-848
    • /
    • 2006
  • Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.