• Title/Summary/Keyword: 동시시공성

Search Result 228, Processing Time 0.024 seconds

Structural Stability Evaluation of Eco-Friendly Prefabricated Rainwater Infiltration Type Detention Facility with Red Clay Water-Permeable Block Body (황토투수블록체를 적용한 친환경 조립식 빗물 침투형 저류시설의 구조 안정성 평가)

  • Choi, Hyeonggil;Lee, Taegyu;Kim, Hojin;Choi, Heeyong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.1
    • /
    • pp.1-10
    • /
    • 2022
  • Recently, due to the frequent occurrence of localized torrential rains and heat waves caused by abnormal climates. For this reason, it is necessary to develop an economical and eco-friendly rainwater detention facility that can secure the groundwater level through rainwater detention as well as flood prevention against concentrated rainfall by simultaneously implementing rainwater permeation and storage. In this study, the structural safety of an eco-friendly rainwater infiltration type detention facility made using eco-friendly inorganic binders including red clay was examined. Static analysis considering the constant load and additional vertical load and dynamic analysis considering the seismic spectrum were performed. As a result, it was found that the eco-friendly prefabricated rainwater infiltration type detention facility developed in this study has a maximum stress of about 68.1% to 75.4% and a maximum displacement of about 0.9% to 9.6% under the same load and seismic conditions compared to the existing PE block rainwater detention facility. It was confirmed that the eco-friendly prefabricated rainwater infiltration type detention facility secured excellent structural stability.

Development of a prefabricated rainwater infiltration storage block for reducing rainfall-runoff (우수유출저감을 위한 조립식 빗물 침투형 저류블록의 개발)

  • Koh, Byoung-Ryoun;Choi, Hee-Yong;Cha, Jung-Mann
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.360-360
    • /
    • 2020
  • 조립식 빗물침투형 저류블록은 우수유출 저감시설로, 황토 및 친환경 무기질 결합재를 이용하여 제작한 고강도 투수성 블록의 적층 및 요철에 의한 끼움식 조립에 의해 형성된 공간에 빗물을 저류하고, 저장된 빗물은 시간이 지남에 따라 지반으로 침투시키는 우수유출 저감용 빗물관리시설로, 집중강우 시 유출수가 발생하는 해당지역에 분산식으로 설치하여 국지적 호우 발생에 대처할 수 있으며, 지속적인 침투를 통한 지하수위 확보 및 가뭄현상의 저감은 물론, 미기후 조성과 건전한 물순환 구조 형성에 이바지하는 빗물관리기술이다. 본 기술은 집중형 대규모 빗물저류조의 적용상의 문제점과 단순저류의 한계성을 극복하고, 기존 침투시설의 낮은 침투능을 증대시키고자 저류기능과 침투기능을 동시에 확보하여 집중호우시 빠른 침투저류능을 향상시킨 조립식 빗물침투형 저류시설이다. 보다 구체적으로는 집중강우에 대한 방재적 측면과 함께 가뭄으로 발생하는 지하수위 저하 등에 친환경적으로 대응하기 위한 복합적인 빗물관리 기술로서, 빗물 유출저감과 함께 물순환 회복 및 저영향개발을 위한 각 지자체의 지침과도 부합될 수 있다. 또한, 콘크리트 제품의 환경적 문제점과 플라스틱 제품의 낮은 물성을 극복하였고, 시공 시에는 보다 현장상황에 맞게 가변적 형태로 적용이 가능한 단순조립 적층공법으로 공기단축에 탁월한 장점이 있으며, 유지관리 시에는 별도의 동력이 요구되지 않는 형태로 개발하였다. 조립식 빗물침투저류블록의 구조체를 이루는 단위 블록유닛은 투수성 소재로 제작되며, 상하부가 개방되어 있고 사각형의 내부에 힘을 받는 격벽과 전후벽이 상호 대응되는 요철로 형성되어 있으며, 단위블록 유닛 다수개가 수직수평으로 연속적으로 조립되어 규모의 제한, 형태의 제한이 없는 구조물 형성이 가능하다. 본 구조체의 저류공극율은 80%이상 확보 가능하며, 또한 블록자체의 투수율이 0.83mm/sec로서 순모래나 순자갈의 포화투수계수보다 투수율이 높아 침투저류 효율성이 높으며 시공 후 상부 토지는 자유롭게 활용 가능하다. 본 조립식 빗물 침투형 저류블록을 이용하여 저영향개발 계획, 우수유출 저감대책 수립, 빗물관리시설 계획시 기존의 시설들에 비하여 경제적, 효율적인 설계가 가능하다.

  • PDF

In-Situ Application of the Steel Pipe jacking with Grouting (그라우팅을 병행한 강관추진공법의 현장 적용성 연구)

  • Jung, Min-Hyung;Lim, Ho-Jung;Shin, Chang-Sub;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.1 s.53
    • /
    • pp.152-160
    • /
    • 2009
  • The pipe jacking method which is a non-excavation method is frequently used due to constructability and economical efficiency in a medium or small-sized pipeline construction. However, jacking process of the method still causes problems that the base ground is disturbed and loosen. These lead to surface settlement, strength decrease and leakage of water. Therefore, this study presents in-situ application of the steel pipe jacking with grouting, and it is that jacking and grouting are progressed simultaneously. To verify this, the steel pipe jacking with grouting and the existing steel pipe jacking have been constructed on the same ground condition. It has been proved that the steel pipe jacking with grouting is in-situ applicable according to results of monitoring surface settlement, in-situ density, GPR geophysical prospecting and large scale direct shear test.

Case Study on the Countermeasure Methods and Collapsed Sources of Segmental Retaining Wall Considering Site Conditions (시공환경을 고려한 블록식 보강토옹벽의 붕괴요인 분석 및 대책방안 사례연구)

  • Han, Jung-Geun;Cho, Sam-Deok;Jeong, Sang-Seom;Lee, Kwang-Wo;Kim, Ji-Sun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.4 no.3
    • /
    • pp.35-43
    • /
    • 2005
  • The geosynthetic reinforced segmental retaining walls(SRW) are improved that the disadvantage of existed retaining wall and the workability in field. Recently, the segmental retaining wall is replacing the exited wall because it is quickly advanced to using by the block in-situ. The use, therefore, is increasing. But, the trends of the large scaled construction was developed that the problems likely to crack and collapse, those are caused of careless in design and construction of SRW not considering about various surrounding conditions. In this study, the cause analysis on destructed SRW was carried out that based on the datum of measured displacement of walls, rainfall features and ground sounding conditions. Also, the analysis of the global slope stability was carried out on collapsed section and non-collapsed section using critical equilibrium method. For the rational stability and analysis of slope including SRW structure, the site conditions including situations of topography, ground and histories of construction and collapse etc should be considered. The rational countermeasure methods for non-collapsed and collapsed areas may be sustained as much as possible current state.

  • PDF

Stability Analysis of Low Flow Revetments on External Forces (저수호안에 작용하는 외력에 의한 안정성분석)

  • Kim, Chul;Park, Nam-Hee;Kim, Dae-Young;Kim, Yun-Hwan
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.5
    • /
    • pp.147-153
    • /
    • 2008
  • Tractive forces by flowing water and ship generated waves are items that affect the stability of the low flow revetments among various external forces exerting on those revetments. Bank revetment stability by these external forces is analysed in this study. The study area is the section of the test construction area changing the artificial revetments to ecological revetments in Han river. Tractive forces are computed using the calculated flow velocity using RMA-2 model. The stability is analyzed comparing the calculated tractive forces with permissible tractive forces of the revetments in the study area. The calculated tractive forces at section number 93 is higher than permissible tractive forces in that section, so the section is estimated hydraulically unstable. The calculated tractive forces for the storm of 10th August 2007 are small compared to the permissible tractive forces in all sections. The sections are considered to be hydraulically stable, but have been eroded in some parts. The reason for the erosion is considered to have insufficient time for the plants taking root, and be exerted composite forces such as forces by ship generated waves. Ship generated waves by the excursion boats and small boats called river taxi was calculated. Wave forces by these calculated waves are computed and compared with the supporting forces of the revetment material. The external forces exerted by the ships in Han River on the revetments is very little compared with the permissible supporting forces of the revetments, so the revetments are estimated hydraulically stable. But considering the composite forces are exerted simultaneously, the stability consideration should include these composite forces.

Evaluation on Thermal Performance Along with Constructability and Economic Feasibility of Large-diameter Cast-in-place Energy Pile (대구경 현장타설 에너지파일의 열교환 성능과 시공성 및 경제성 분석)

  • Park, Sangwoo;Sung, Chihun;Lee, Dongseop;Jung, Kyoungsik;Choi, Hangseok
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.5
    • /
    • pp.5-21
    • /
    • 2015
  • An energy pile is a novel type of ground heat exchangers (GHEX's) which sets up heat exchange pipes inside a pile foundation, and allows to circulate a working fluid through the pipe for exchanging thermal energy with the surrounding ground stratum. Using existing foundation structure, the energy pile can function not only as a structural foundation but also as a GHEX. In this paper, six full-scale energy piles were constructed in a test bed with various configurations of the heat exchange pipe inside large-diameter cast-in-place piles, that is, three parallel U-type heat exchangers (5, 8 and 10 pairs), two coil type heat exchangers (with a 500 mm and 200 mm pitch), and one S-type heat exchanger. During constructing the energy piles, the constructability of each energy pile was evaluated with consideration of the installation time, the number of workers and any difficulty for installing. In order to evaluate the thermal performance of energy piles, the thermal performance tests were carried out by applying intermittent (8 hours operating-16 hours pause) artificial cooling operation to simulate a cooling load for commercial buildings. Through the thermal performance tests, the heat exchange rates of the six energy piles were evaluated in terms of the heat exchange amount normalized with the length of energy pile and/or the length of heat exchange pipe. Finally, the economic feasibility of energy pile was evaluated according to the various types of heat exchange pipe by calculating demanded expenses per 1 W/m based on the thermal performance test results along with the market value of heat exchange pipes and labor cost.

Evaluation of Heat Exchange Efficiency and Applicability for Parallel U-type Cast-in-place Energy Pile (병렬 U형 현장타설 에너지파일의 열교환 효율 및 적용성 평가)

  • Park, Sangwoo;Kim, Byeongyeon;Sung, Chihun;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.361-375
    • /
    • 2015
  • An energy pile is one of the novel ground heat exchangers (GHEX's) that is a economical alternative to the conventional closed-loop vertical GHEX. The combined system of both a structural foundation and a GHEX contains a heat exchange pipe inside the pile foundation and allows a working fluid circulating through the pipe, inducing heat exchange with the ground formation. In this paper, a group of energy piles equipped with parallel U-type (5, 8 and 10 pairs) heat exchange pipes was constructed in a test-bed by fabricating in large-diameter cast-in-place concrete piles. In addition, a closed-loop vertical GHEX with 30m depth was constructed nearby to conduct in-situ thermal response tests (TRTs) and to compare with the thermal performance of the cast-in-place energy piles. A series of thermal performance tests was carried out with application of an artificial cooling and heating load to evaluate the heat exchange rate of energy piles. The applicability of cast-in-place energy piles was evaluated by comparing the relative heat exchange efficiency and heat exchange rate with preceding studies. Finally, it is concluded that the cast-in-place energy piles constructed in the test-bed demonstrate effective and stable thermal performance compared with the other types of GHEX.

A Case Study of GTX A Tunnel Station Blasting with Electronic Detonator (GTX A 터널정거장에 대한 전자뇌관 적용 시공 사례)

  • Hwang, Nam-Sun;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Seong, Yoo-Hyeon;Lee, Chang-Won
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.24-34
    • /
    • 2021
  • Electronic detonators are widely used in various construction sites due to accurate delay time. Including the cases with exceeded noise and vibration from site using electric/non-electric detonator, electronic detonators are used to improve blast fragmentation or to reduce the cost of secondary partial blasting. Furthermore, the number of cases using electronic detonators are increased for reduction of the cost and construction period by maximizing operations efficiency. This case study is about applying electronic detonators on large section station, tunnel construction site which is the part of urban area GTX A project. Although it was initially planned to utilize non-electric detonators, damage was inflicted on safety-thing. We have considered blasting method using electronic detonators as solution of this problem. By applying electronic detonators, we not only satisfied environmental regulations but also prevented nearby safety-thing from getting damaged. In addition, we were able to shorten the construction period than the initial plan by conducting single simultaneous blasting on large section station, in order to ensure safe and efficient construction.

Construction Method Improvement of the FRP-plate Strengthening Method using the Velcro (벨크로를 이용한 FRP 플레이트 보강공법의 시공공법 개선)

  • Hong, Geon-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.6
    • /
    • pp.225-232
    • /
    • 2008
  • The object of this paper is to study the flexural strengthening effectiveness on the construction method of bonding of the FRP. The existing FRP flexural strengthening methods were divided into FRP sheet strengthening and FRP plate strengthening according to the FRP condition. For improving the existing construction method, this paper proposed the velcro type anchorage system for temporary bonding material, and flexural strengthening effects were tested. Test variables were bonding methods of the FRP strengthening materials, and total 4 specimens were tested. Following to the test results, it is shown that FRP-plate strengthening method using the velcro can get better workability than existing construction methods, and have excellent strengthening performance including flexural strength, stiffness, ductility and failure aspect.

Estimation of Coefficient of Earth Pressure At Rest During SCP Installation by Drained Triaxial Compression Test (배수삼축압축시험을 통한 SCP 시공과정 중 정지토압계수 평가)

  • Kwon, Youngcheul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.11
    • /
    • pp.93-101
    • /
    • 2012
  • SCP is a construction method that maximizes the effects of ground improvement by creating sand piles, which are formed by the compaction within soft ground. SCP is mainly used for consolidation and drain effects in clayey soils, and as a liquefaction countermeasure through effects such as compaction in loose sandy soils. In the design of SCP, if the sand piles with high stiffness are not taken into account, it can become a design that overly considered safety, and increased construction costs are highly likely to cause economic disadvantages. The changes in stress conditions and compaction mechanisms in the subsurface have been identified to a certain extent by study findings to date. However, the studies that considered SCP and in-situ ground as composite ground are fairly limited, and therefore, those studies have not achieved enough results to fully explain the relevant topics. In this study, the ground improved by SCP was regarded as the composite ground that consists of SCP and in-situ ground. Moreover, employing a CID test, this study examined the changes in the stress conditions of in-situ ground according to the installation of SCP through the relations between $K_0$ and SCP replacement ratio. At the same, whether the SCP installation procedure can be recreated in a laboratory was examined using a cyclic triaxial test. According to the test results, the changes in the stress conditions of the original ground occurred most largely in an initial stage of SCP installation, and after a certain time point, the vibration for SCP installation did not have a great influence on the changes in the stress conditions of the ground. Moreover, in order to recreate the behaviors of in-suit ground according to SCP in a laboratory, cyclic loading, which corresponds to casing vibration, was concluded to be essentially required.