• Title/Summary/Keyword: 동범막새

Search Result 1, Processing Time 0.013 seconds

A Study on the Diffusion of Silla Roof-End Tile (신라기와의 지방확산에 대한 검토)

  • Yang, Jong-Hyun
    • Korean Journal of Heritage: History & Science
    • /
    • v.45 no.3
    • /
    • pp.100-113
    • /
    • 2012
  • In the midst of recent active excavation, lots of Silla(新羅) roof-end tiles are unearthed in Yeongnam area(嶺南地域). These are confirmed the same tile frame as the Silla tiles excavated in Gyeongju(慶州). It is represented by the Silla tiles excavated in Ingaksa Temple(麟角寺) excavation research. Roof-end tile with arabesque design(唐草文平瓦當) etc. including roof-end tile with lotus design(蓮花文圓瓦當) are judged to be the tile frame produced by the same frame of roof-end tile that was excavated in Gyeongju, Wolseong(月城) and Hwangyongsa Temple(皇龍寺址). There are three kinds of cases concerning the transportation of tile manufacture ; the roof-end tile manufactured in Gyeongju directly moved to each region, only tile frame moved to site to be manufactured there, and tile manufacturer moved to site to manufacture there. This article considers the case of the roof-end tile manufactured in Gyeongju that was directly moved to each region. In case of the Silla tiles excavated in region especially Ingaksa Temple, the aspects of tiles in accordance with different era show the repeated coexistence, expansion and maintenance. This situation is significant as a clue to understand the supply from Gyeongju not as temporary, but as continuous. On the other hand, if the Gyeongju tiles flowed directly into each region, and if the road was built of gravels and the means of transportation was cart, the damage from movement must never be prevented. On the contrary, transportation through waterway might be advantageous due to the reduction of labor and damage rate and the easiness of loading. Accordingly, it tells us why the ruins where roof-end tiles were excavated located near big and small rivers or streams. Of course there are some ruins located in a fixed distance, but the distance may be enough to endure the impact put on tiles from the overland movement. Therefore, in case of direct inflow form long distance, transportation must be finished by overland movement after waterway movement.