• Title/Summary/Keyword: 독립적 자료모니터링 위원회

Search Result 2, Processing Time 0.016 seconds

The Necessity of Independent Data Monitoring Committee in Domestic Clinical Trials (현재 국내임상시험에서 독립적 자료모니터링위원회의 필요성)

  • Kang, Seung-Ho
    • The Korean Journal of Applied Statistics
    • /
    • v.22 no.2
    • /
    • pp.317-327
    • /
    • 2009
  • In adaptive designs important components of clinical trials may be changed based on the results of interim analysis. Several international guidelines point out that such interim analysis should be performed by independent experts who do not participate in clinical trials when adaptive designs are used in therapeutic confirmatory clinical trials, and if not, it may cause bias. The international guidelines recommend the establishment of independent data monitoring committee for conducting interim analysis independently.

A Study on the Risk of Lightning in Special Structures and its Verification Method (특수 구조물의 낙뢰 위험도와 검증 방안에 관한 연구)

  • Yoo, Jeong Hyun;Kim, Hei Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.664-668
    • /
    • 2018
  • Free-standing structures that are especially high are more likely to receive brain attacks caused by lightning. Since special structures are generally part of national industrial structures, lightning strikes mostly cause socio-economic damage. Lightning protection facilities are installed to prevent such lightning damage, but in 2015, support cables on West Sea bridges were hit by lightning, causing a lot of economic damage. Accordingly, the design of a lightning protection system shall establish protective measures after analyzing the risk of debris falling onto the structure. In this thesis, lightning strikes are analyzed directly in relation to the modeling system that operates the actual information collection system for lightning strikes, depending on the location of the tall, free-standing structures, and practical lightning hazard information is provided by a meteorological station. In addition, we propose monitoring and applying a probability correction rate to the calculation of the lightning risk based on the number of lightning strikes directly reaching the ground in order to obtain an effective lightning risk assessment.