• Title/Summary/Keyword: 도로점용공사구간

Search Result 1, Processing Time 0.012 seconds

Development of Saturation Flow Rate Estimation Models Considering Workzone in the Vicinity of Signalized Intersections (도시부 신호교차로 인근 도로점용공사를 고려한 포화교통류율 산정모형 개발에 관한 연구)

  • Eo, Hyo-Gyeong;Sin, Chi-Hyeon
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.6
    • /
    • pp.109-120
    • /
    • 2010
  • This study aims to develop mathematical models for estimating saturation flow rates at the stop line of signalized intersection due to Workzones in the vicinity, since the saturation flow rate is the most critical parameter in capacity analysis for signalized intersections. It was found by reference review that saturation flow rates are sensitively influenced by the location of Workzone, the number of lanes, cycle length and effective green time. Extensive microscopic simulation runs were also performed and compared to the those of mathematical models for model verification. Mathematical models were developed based on traffic flow theory and dualizing them by the location of workzones. And then each result produced by changing important parameter values was carefully examined and analyzed. Small but consistent differences in saturation flow rate values between mathematical models and simulations exist. However, the pattern of changes in saturation flow rates depending on each variable was similar.