• Title/Summary/Keyword: 도로공사

Search Result 989, Processing Time 0.028 seconds

Deriving the Priority of Emergency Vehicle Dispatch Delay Factors Using Spatial Regression Analysis - Focusing on Seoul - (공간 회귀분석을 활용한 긴급차량 출동 지연요소의 우선순위 도출 - 서울시를 중심으로 -)

  • Park, Jun-Sang;Lee, Su-Bin;Kim, Jung-Ok
    • Journal of Cadastre & Land InformatiX
    • /
    • v.53 no.2
    • /
    • pp.67-77
    • /
    • 2023
  • As cities become overcrowded and concentrated, the demand for public services continues to increase due to the improvement of the living standards of urban residents. Among them, fire service can be seen as one of the important public services by reducing damage caused by accidents in emergency situations and affecting the improvement of access to medical services for urban residents. Rapid movement of patients and medical institutions within golden time and proper first aid are essential elements in emergency situations, and Seoul is a super-large city with a large population of about 10 million people and has a large number of emergency medical patients. Therefore, this study used spatial regression analysis to examine the factors affecting the delay factors of emergency dispatch in Seoul to secure golden time, and derived management priorities, and suggested implications for the management of emergency vehicle dispatch delay factors. As a result of the main analysis, land-use characteristics were the most influential factor in emergency vehicle dispatch time, and land-use mixing, commercial area density, average patient age, and average road length were found to affect emergency vehicle dispatch time in order. This study can be used as important basic data for an accurate understanding of the delay factors for emergency dispatch and preparing countermeasures according to priorities.

Enhancing Project Integration and Interoperability of GIS and BIM Based on IFC (IFC 기반 GIS와 BIM 프로젝트 통합관리 및 상호 운용성 강화)

  • Kim, Tae-Hee;Kim, Tae-Hyun;Lee, Yong-Chang
    • Journal of Cadastre & Land InformatiX
    • /
    • v.54 no.1
    • /
    • pp.89-102
    • /
    • 2024
  • The recent advancements in Smart City and Digital Twin technologies have highlighted the critical role of integrating GIS and BIM in urban planning and construction projects. This integration ensures the consistency and accuracy of information, facilitating smooth information exchange. However, achieving interoperability requires standardization and effective project integration management strategies. This study proposes interoperability solutions for the integration of GIS and BIM for managing various projects. The research involves an in-depth analysis of the IFC schema and data structures based on the latest IFC4 version and proposes methods to ensure the consistency of reference point coordinates and coordinate systems. The study was conducted by setting the EPSG:5186 coordinate system, used by the National Geographic Information Institute's digital topographic map, and applying virtual shift origin coordinates. Through BIMvision, the results of the shape and error check coordinates' movement in the BIM model were reviewed, confirming that the error check coordinates moved consistently with the reference point coordinates. Additionally, it was verified that even when the coordinate system was changed to EPSG:5179 used by Naver Map and road name addresses, or EPSG:5181 used by Kakao Map, the BIM model's shape and coordinates remained consistently unchanged. Notably, by inputting the EPSG code information into the IFC file, the potential for coordinate system interoperability between projects was confirmed. Therefore, this study presents an integrated and systematic management approach for information sharing, automation processes, enhanced collaboration, and sustainable development of GIS and BIM. This is expected to improve compatibility across various software platforms, enhancing information consistency and efficiency across multiple projects.

Precision Evaluation of Expressway Incident Detection Based on Dash Cam (차량 내 영상 센서 기반 고속도로 돌발상황 검지 정밀도 평가)

  • Sanggi Nam;Younshik Chung
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.6
    • /
    • pp.114-123
    • /
    • 2023
  • With the development of computer vision technology, video sensors such as CCTV are detecting incident. However, most of the current incident have been detected based on existing fixed imaging equipment. Accordingly, there has been a limit to the detection of incident in shaded areas where the image range of fixed equipment is not reached. With the recent development of edge-computing technology, real-time analysis of mobile image information has become possible. The purpose of this study is to evaluate the possibility of detecting expressway emergencies by introducing computer vision technology to dash cam. To this end, annotation data was constructed based on 4,388 dash cam still frame data collected by the Korea Expressway Corporation and analyzed using the YOLO algorithm. As a result of the analysis, the prediction accuracy of all objects was over 70%, and the precision of traffic accidents was about 85%. In addition, in the case of mAP(mean Average Precision), it was 0.769, and when looking at AP(Average Precision) for each object, traffic accidents were the highest at 0.904, and debris were the lowest at 0.629.

Analysis of Land Creep in Ulju, South Korea (울주에서 발생한 땅밀림 특성)

  • Jae Hyeon Park;Sang Hyeon Lee;Han Byeol Kang;Hyun Kim;Eun Seok Jung
    • Journal of Korean Society of Forest Science
    • /
    • v.113 no.1
    • /
    • pp.14-30
    • /
    • 2024
  • This study characterized areas at risk of land creep by focusing on a site that has undergone this phenomenon in Ulju-gun, South Korea. Land creep in the area of interest was catalyzed by road expansion work conducted in 2022. The site was examined on the basis of its geological features, topography, effective soil depth, soil hardness, electrical resistivity, and subsurface profile. It consists of a slope covered with sparse vegetation and a concave top that retains rainwater during rainfall. Compositionally, land creep affected the shale, sandstone, and conglomerate formations on the site, which had little silt and more sand and clay compared with areas that were unaffected by land creep. An electrical resistivity survey enabled us to detect a groundwater zone at the site, which explains the softness of the soil. Finally, the effective soil depth at the land creep-affected area was 30.4 cm on average, indicating deep colluvial deposits. In contrast, unaffected sites had an effective soil depth of 24.7 cm on average. These results should facilitate the creation of systems for monitoring and preemptively responding to land creep, significantly mitigating the socioeconomic losses associated with this phenomenon.

Integrated Data Safe Zone Prototype for Efficient Processing and Utilization of Pseudonymous Information in the Transportation Sector (교통분야 가명정보의 효율적 처리 및 활용을 위한 통합데이터안심구역 프로토타입)

  • Hyoungkun Lee;Keedong Yoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.3
    • /
    • pp.48-66
    • /
    • 2024
  • According to the three amended Laws of the Data Economy and the Data Industry Act of Korea, systems for pseudonymous data integration and Data Safe Zones have been operated separately by selected agencies, eventually causing a burden of use in SMEs, startups, and general users because of complicated and ineffective procedures. An over-stringent pseudonymization policy to prevent data breaches has also compromised data quality. Such trials should be improved to ensure the convenience of use and data quality. This paper proposes a prototype system of the Integrated Data Safe Zone based on redesigned and optimized pseudonymization workflows. Conventional workflows of pseudonymization were redesigned by applying the amended guidelines and selectively revising existing guidelines for business process redesign. The proposed prototype has been shown quantitatively to outperform the conventional one: 6-fold increase in time efficiency, 1.28-fold in cost reduction, and 1.3-fold improvement in data quality.

Evaluation of Growth Inhibition Causes on Perennial Ryegrass(Lolium perennial L.) in Afforesting Area (인공배양토 식생지역에서의 페레니얼 라이그래스 생육저해 원인 평가)

  • Lee, In-Bog;Kim, Pil-Joo
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.37 no.4
    • /
    • pp.212-219
    • /
    • 2004
  • To minimize the danger of soil erosion and settle habitats earlier, afforestation, which vegetates bare slopes, is selected as an environmental recovering technology. Large portions of these areas often are suffered by a bad germination and growth inhibition of sprayed seeds. Afforested materials collected in the normal and damaged sites were not any big difference in chemical characteristics and biological response to ryegrass. But background soil of the damaged site has very low pH (3.6) and high contents of iron and aluminum compared with them of the normal sites. Both germination and root growth of ryegrass were inhibited severely in the water extracts of damaged soils, but not in the water extracts of normal sites. Groundwater collected nearby the damaged sites was very strong acidic (pH 33) and exhibited a high value of electrical conductivity and high contents of iron and aluminum. In the ground water, germinated ryegrass was scarcely grown. In Al standard solution, the root growth of ryegrass was inhibited over 50% in 0.5 mM in pH 3.5-4.5 and in 1.4 mM in pH 5.5, which seems to be related to $Al^{3+}$ activity in solution. In the ferric Fe ($Fe^{3+}$) standard solution, ryegrass growth was inhibited over 50% in the concentration of 14-19 mM in root and 23-25 mM in shoot. This strong tolerance of ryegrass to $Fe^{3+}$ might be concerned with the very low activity of $Fe^{3+}$ at pH 3.5-5.5. In contrast, ryegrass responded very sensitively to ferrous Fe ion ($Fe^{2+}$), especially in root growth: $Fe^{2+}$ concentrations corresponding to 50% growth reduction were 0.3-0.4 mM at pH 3.5-5.5 in roots. This high growth inhibition should be related to the high ion activity of $Fe^{2+}$ irrespective of different pH conditions. In conclusion, low pH and high contents of $Fe^{2+}$ and aluminum seem to be caused by pyrite and be closely related to the growth inhibition of ryegrass seeded in afforested area.

Estimation of resistance coefficient of PHC bored pile by Load Test (재하시험에 의한 PHC 매입말뚝의 저항계수 산정)

  • Park, Jong-Bae;Kwon, Young-Hwan
    • Land and Housing Review
    • /
    • v.8 no.4
    • /
    • pp.233-247
    • /
    • 2017
  • In Europe and the USA, the use of limit state design method has been established, and the Korea Ministry of Land, Transport and Maritime Affairs has implemented the bridge substructure design standard based on the critical state. But Korean piling methods and ground conditions are different from Europe and USA, the limit state design method can not be used immediately. In this study, the resistance coefficient was proposed by comparing and analyzing the results of the static load test(9 times) and dynamic load tests(9 times of EOID and 9 times of Restrike) with the bearing capacity calculated by Meyerhof(LH design standard, Road bridge design standard) method and surcharge load method(using Terzaghi's bearing capacity coefficient and Hansen & Vesic's bearing capacity coefficient). The previous LHI study showed the resistance coefficient of the LH design standard was 0.36 ~ 0.44, and this research result showed the resistance coefficient was 0.39 ~ 0.48 which is about 8% higher than the previous study. In this study, we tried to obtain the resistance coefficient mainly from the static load test and the resistance coefficient was 0.57 ~ 0.69(Meyhof method : LH design standard) based on the ultimate bearing capacity and the resistance coefficient was 0.49 ~ 0.60(Meyhof method : LH design standard) based on the Davissons bearing capacity. The difference of the resistance coefficient between the static and dynamic load test was greater than that we expected, we proposed the resistance coefficient(0.52 ~ 0.62 : Meyerhof method: LH design standard) using the modified bearing capacity of the dynamic load test. Summarizing the result, the coefficient of resistance obtained from the static and dynamic load tests was 0.35 ~ 0.76, which is greater than 0.3 suggested by the Road bridge design standard, so the economical design might be possible using the coefficient of resistance proposed by this study.

Effectiveness Analysis and Application of Phosphorescent Pavement Markings for Improving Visibility (축광노면표시 시인성 개선에 따른 경제성 분석 및 적용방안)

  • Yi, Yongju;Lee, Kyujin;Kim, Sangtae;Choi, Keechoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.815-825
    • /
    • 2017
  • Visibility of lane marking is impaired at night or in the rain, which thereby threatens traffic safety. Recently, various studies and technologies have been developed to improve lane marking visibility, such as the extension of lane marking life expectancy (up to 1.5 times), improvement of lane marking equipment productivity, improvement of lane marking visibility by applying phosphorescent material mixed paint. Cost-benefit analysis was performed with considering various benefit items that can be expected. About 45% of traffic accidents would be prevented by improving lane marking visibility. Additionally, accident reduction benefit and traffic congestion reduction benefit were calculated as much as 246 billion KRW per year and 12 billion KRW per year, respectively, by reducing repaint cycle due to enhanced durability. 45 billion KRW per year is expected to reduced with improved lane detection performance of autonomous vehicle. Meanwhile, total increased cost when introducing phosphorescent material mixed paint to 91,195km of nationwide road is identified as 1922 billion KRW per year. However, economic feasibility could not be secured with 0.16 of cost-benefit ratio when applied to the road network as a whole. In case of "Accident Hot Spot" analyzing section window (400m), one or more fatality or two or more injured (one or more injured in case of less than 2 lanes per direction) per year were caused by pavement marking related accident, economic feasibility was secured. In detail, 3.91 of cost-benefit ratio is estimated with comparison of the installation cost for 5,697 of accident hot spot and accident reduction benefit. Some limitations and future research agenda have also been discussed.

Estimation of resistance coefficient of PHC bored pile by Load Test II (재하시험에 의한 PHC 매입말뚝의 저항계수 산정 II)

  • Park, Jong-Bae;Park, Yong-Boo;Kwon, Young-Hwan
    • Land and Housing Review
    • /
    • v.9 no.3
    • /
    • pp.1-8
    • /
    • 2018
  • In Europe and the United States, the use of limit states design has almost been established for pile foundation design. According to the global trend, the Ministry of Land, Transport and Maritime Affairs has established the basic design criteria of the bridge under the limit state design method. However, it is difficult to reflect on the design right now because of lack of research on resistance coefficient of the pile method and ground condition. In this study, to obtain the resistance coefficient of PHC bored pile which is widely used in Korea, the bearing capacity calculated by the LH design standard and the bridge design standard method, the static load test(21 times) and the dynamic load test(EOID 21 times, Restrike 21) The reliability analysis was performed on the results. The analysis of the resistance coefficient of PHC bored pile by loading test was analyzed by adding more than two times data. As a result, the resistance coefficient obtained from the static load test(ultimate bearing capacity) was 0.64 ~ 0.83 according to the design formula and the target reliability index, and the resistance coefficient obtained from the dynamic load test(ultimate bearing capacity) was 0.42~0.55. Respectively. The resistance coefficient obtained from the modified bearing capacity of dynamic load test(EOID's ultimate end bearing capacity + restrike's ultimate skin bearing capacity) was 0.55~0.71, which was reduced to about 14% when compared with the resistance coefficient obtained by the static load test(ultimate bearing capacity). As a result of the addition of the data, the resistivity coefficient was not changed significantly, even if the data were increased more than 2 times by the same value or 0.04 as the previous resistance coefficient. In conclusion, the overall resistance coefficient calculated by the static load test and dynamic load tests in this study is larger than the resistance coefficient of 0.3 suggested by the bridge design standard(2015).

Mechanism of steel pipe reinforcement grouting based on tunnel field measurement results (터널 현장 계측결과를 통한 강관보강 그라우팅의 거동 메커니즘)

  • Shin, Hyunkang;Jung, Hyuksang;Lee, Yong-joo;Kim, Nag-young;Ko, Sungil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.3
    • /
    • pp.133-149
    • /
    • 2021
  • This study aims to report the behavioral mechanism of steel pipe reinforcement grouting, which is being actively used to ensure the stability of the excavation surface during tunnel excavation, based on measurements taken at the actual site. After using a 12 m steel pipe attached with a shape displacement meter and a strain gauge to reinforce the actual tunnel surface, behavioral characteristics were identified by analyzing the measured deformation and stress of the steel pipe. Taking into account that the steel pipes were overlapped every 6 m, the measured data up to 7 m of excavation were used. In addition, the behavioral characteristics of the steel pipe reinforcement according to the difference in strength were also examined by applying steel pipes with different allowable stresses (SGT275 and SGT550). As a result of analyzing the behavior of steel pipes for 7 hours after the first excavation for 1 m and before proceeding with the next excavation, the stress redistribution due to the arching effect caused by the excavation relaxation load was observed. As excavation proceeded by 1 m, the excavated section exhibited the greatest deformation during excavation of 4 to 6 m due to the stress distribution of the three-dimensional relaxation load, and deformation and stress were generated in the steel pipe installed in the ground ahead of the tunnel face. As a result of comparing the behavior of SGT275 steel pipe (yield strength 275 MPa) and SGT550 steel pipe (yield strength 550 MPa), the difference in the amount of deformation was up to 18 times and the stress was up to 12 times; the stronger the steel pipe, the better it was at responding to the relaxation load. In this study, the behavior mechanism of steel pipe reinforcement grouting in response to the arching effect due to the relaxation load was identified based on the measured data during the actual tunnel excavation, and the results were reported.