• Title/Summary/Keyword: 댐 공사

Search Result 272, Processing Time 0.033 seconds

Development of Float Water Level Meter Portable Calibration System (부자식 수위계 이동형 교정시스템 개발)

  • Hong, Sung-taek;Kim, Il-han;Choi, Jong-woong;Shin, Gang-wook
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.10a
    • /
    • pp.411-414
    • /
    • 2016
  • K-water institute is a calibration and test institute accredited by international standard calibration center for water-level meters. Due to the absence of on-site calibration system and procedure for Float Water Level Meter, the calibration was performed only in the standard calibration laboratory. In this study, mobile calibration system and procedure were developed to calibrate Float Water Level Meter on site using scale bar and camera. It is possible to obtain reliable water-level data and achieve consistent data management.

  • PDF

Current status of site observations for evapotranspiration and soil moisture content in the K-water dam watershed (K-water 댐 유역 증발산량 및 토양수분량 관측 현황)

  • Cho, Younghyun;Kang, Tae Ho;Lee, Young Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.67-67
    • /
    • 2022
  • 국가 물관리 측면에서 증발산량과 토양수분량은 자연계 손실로서 국내 수자원 총량의 약43%(563억 m3/년)를 차지하며, 수자원의 계획과 개발, 물순환 과정 규명 및 다양한 수재해 분석 등을 위한 수문 요소이다. 정부는 2005년 「수문조사 선진화 5개년 계획」과 2008년 「제1차 수문조사기본계획(2010~2019년)」을 통해 2019년까지 증발산량과 토양수분량 관측소 확대(각각 25개 지점) 기반을 마련하였고 「수자원의 조사·계획 및 관리에 관한 법률」에 따라 매년 공인 수문 자료로 증발산량과 토양수분량을 측정하고 있다. 증발산량과 토양수분량은 댐 유역의 정밀한 물순환 해석에도 매우 중요한 정보로서 현재 K-water에서의 관측은 일부 시험유역(용담댐 유역)의 flux tower에 의한 에디공분산법(Eddy Covariance Method) 및 토양수분 센서(TDR, Time Domain Reflectometery)에 의한 지점 자료의 생산만 각각 이루어지고 있다. 본 연구에서는 K-water 댐 유역의 증발산량 및 토양수분량 관측 현황과 그간 관측된 자료의 특성을 각종 경향성 분석 등과 함께 소개하고자 한다, 증발산량의 경우는 2개소의 flux tower를운영(덕유산 지점 2011년 이후, 용담 지점 2017년 이후)하고 있으며, 토양수분량은 총 7개소(계북, 천천, 상전, 안천, 부귀, 주천 지점 2013년 이후, 장계 지점 2017년 이후)에 TDR센서를 설치, 계측 운영 중이다. 이렇게 관측된 자료는 매년 홍수통제소 주관 관련 전문가 공인심사를 통해 일자료 기준으로 한국수문조사연보에 수록되고 있으며, K-water에서도 연보를 통해 공개된 자료를 기준으로 공공데이터포털(data.go.kr) 등과 연계하여 온라인 자료 서비스 중이다. 한편, 최근 2020년 「제2차 수문조사 기본계획(2020~2029년)」에서는 수자원 위성 개발연구와 연계하여 위성을 활용한 증발산량과 토양수분량 산정 연구의 필요성이 강조되고 있다. 하지만 본 연구에서 살펴본 지점 자료만으로는 댐 유역을 포함한 광역단위의 시계열 공간정보를 생산하기 한계가 있으며, 댐 유역과 국내 전 지역의 공간 시계열 증발산량 및 토양수분량 자료 산정과 활용 방안에 대해 정립하고, 나아가 위성영상을 활용한 댐 유역 증발산량·토양수분량 관측 가이드라인 마련 등을 위해서는 국가적으로 많은 재원의 투입과 노력이 필요한 상황이다.

  • PDF

Development of Data Driven Flood Arrival Time and Water Level Estimation Simulator (데이터 기반 홍수 도달시간 및 수위예측 시뮬레이터 개발)

  • Lee, Ho Hyun;Lee, Dong Hun;Hong, Sung Taek;Kim, Sung Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.104-104
    • /
    • 2022
  • 임진강 수계는 북측 지역이 다수를 차지하는 유역 특성으로 예고 없는 상류 급방류, 강우 등으로 인해 댐 운영에 근본적 어려움이 있으며, 이에 따라 홍수조절지 및 댐 하류 계측 가능 지역의 취득 자료를 고려한 하천 수위 변화에 대한 사전 예측을 필요로 하고 있다. 홍수기 하천 도달시간 및 수위예측 기법으로는 물리 기반 및 데이터 기반 모델들이 다양하게 연구되어 왔으며, 일부 연구성과들은 현업에 활용하고 있다. 물리기반 모델은 하천 지형 변화에 대한 자료 취득 및 분석에 많은 시간을 요하는 단점은 있으나, 설명 가능한 모델을 구현할 수 있을 것으로 사료 된다. 반면, 데이터 기반 인공지능 모델은 짧은 시간 및 비용으로 모델을 개발할 수 있으나, 복잡한 알고리즘구현 시 설명이 불가하여 일관성을 의심 받을 수 있다. 본 논문에서는 홍수 도달시간과 하류 수위 상승에 대하여 설명 가능한 인공지능 알고리즘 및 시뮬레이션 프로그램을 개발하고자 하였다. 홍수 도달시간 예측은 기존 조견표 방식에서 고려하지 않았던 홍수파의 영향을 추가 변수화 하고, 데이터의 전후처리를 통하여 도달시간을 예측하였다. 실시간 하류 수위 예측은 댐 방류량, 주변 강우, 조위 등을 고려하여 도달시간 후 수위를 예측할 수 있도록 구현하였으며, 자료 동화 기술을 일부 적용하였다. 미래 방류조건에 대한 시뮬레이션을 위해서는 미래 방류량, 예상 강우 입력 시 하천 지점별 수위 상승을 예측할 수 있도록 알고리즘 및 프로그램을 개발하였다. 이를 구현하기 위하여 다양한 인공지능 알고리즘을 이용한 학습, 유전자 알고리즘을 이용한 가중치 학습 제한 조건내 최적화, 수위파와 조위파의 중첩의 정리 등을 이용하여 예측 정확도 및 신뢰성을 제고 하였다. 인공지능 분석결과의 현업활용성 제고를 위하여 시뮬레이터 프로그램을 개발하여 현업에 적용하였다.

  • PDF

Design of the Reinforced Concrete Lining in Bakun Diversion Tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1999.03a
    • /
    • pp.9-15
    • /
    • 1999
  • 말레이지아 보르네오섬 사라왁주의 바군 가배수로 터널(약칭 "바쿤터널")은 본 댐 공사를 수행하기 위한 배수 터널로 터널의 완공시기는 바쿤 수력발전사업의 중요한 요인이다. 터널의 라이닝작업은 터널공사의 완료 단계로 공사비와 공기 면에서 굴착 및 지보작업과 같이 중요한 단계이다. 바쿤터널은 내부 직경 12 m의 유사연장 3개의 터널로 이루어져 있으며 총길이는 4314.6 m 이다. 내공 단면은 배수시 마찰을 감소시키기 위하여 원형단면으로 설계되었다. (중략)계되었다. (중략)

  • PDF

A Case Study of Spillway Design of Imha Dam (임하댐 비상여수로 설계 사례 소개)

  • Kim, Dong-Min;Kim, Tae-Hyun;Jang, Min-Chul
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.364-371
    • /
    • 2006
  • 최근 기상이변에 따른 이상홍수가 빈번하고, 댐 설계홍수량 설계기준이 가능최대홍수량(PMF)으로 강화되었으며, 최근의 주요 호우사상을 고려하여 산정한 임하댐 유역의 가능최대강수량(P.M.P)이 설계 당시보다 증가됨에 따라 가능최대홍수량(PMF) 유입시 댐 안정성 확보가 필요한 것으로 검토되었다. 따라서, 본 과업은 “댐의 수문학적 안정성검토 및 치수능력증대 기본계획 수립, 2004. 9. 건설교통부/한국수자원공사”에 의거하여, 최근의 태풍 ‘RUSA’(’02) 및 ‘MAEMI’(’03)와 같은 이상호우에 대한 댐 및 여수로의 안정성을 확보함으로써 국민의 생명과 재산을 보호할 수 있도록 비상여수로를 계획하였다. 비상여수로는 수문학적 안정성을 검토한 후, 가능최대홍수량(PMF)과 같은 홍수유입시 댐의 안전을 위하여 신속히 홍수를 배제시킬 수 있는 수리적.구조적인 안정성 확보가 가능하고, 시공성, 경제성 및 환경성 측면을 고려하여 댐우안 300m 지점에 터널규모 D15m${\times}$3련 ${\times}$L1,262m (L1=379m, L2=421m, L3=462m)의 월류형 터널식으로 계획하였다.

  • PDF

Development and evaluation of dam inflow prediction method based on Bayesian method (베이지안 기법 기반의 댐 예측유입량 산정기법 개발 및 평가)

  • Kim, Seon-Ho;So, Jae-Min;Kang, Shin-Uk;Bae, Deg-Hyo
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.7
    • /
    • pp.489-502
    • /
    • 2017
  • The objective of this study is to propose and evaluate the BAYES-ESP, which is a dam inflow prediction method based on Ensemble Streamflow Prediction method (ESP) and Bayesian theory. ABCD rainfall-runoff model was used to predict monthly dam inflow. Monthly meteorological data collected from KMA, MOLIT and K-water and dam inflow data collected from K-water were used for the model calibration and verification. To estimate the performance of ABCD model, ESP and BAYES-ESP method, time series analysis and skill score (SS) during 1986~2015 were used. In time series analysis monthly ESP dam inflow prediction values were nearly similar for every years, particularly less accurate in wet and dry years. The proposed BAYES-ESP improved the performance of ESP, especially in wet year. The SS was used for quantitative analysis of monthly mean of observed dam inflows, predicted values from ESP and BAYES-ESP. The results indicated that the SS values of ESP were relatively high in January, February and March but negative values in the other months. It also showed that the BAYES-ESP improved ESP when the values from ESP and observation have a relatively apparent linear relationship. We concluded that the existing ESP method has a limitation to predict dam inflow in Korea due to the seasonality of precipitation pattern and the proposed BAYES-ESP is meaningful for improving dam inflow prediction accuracy of ESP.

Analysis of time-series displacement using satellite SAR interferometry technique for Dam safety monitoring (댐 안전 관리를 위한 위성 SAR 간섭기법 활용 시계열 변위 분석)

  • Kang, Ki-mook;Hwang, EuiHo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.440-440
    • /
    • 2022
  • 1970년대부터 집중 건설 된 우리나라의 다목적댐, 홍수조절댐, 용수전용댐 등의 대형 국가 수자원시설물들의 '고령화'가 급속히 진행되어 수리구조물에 대한 안정성을 주기적으로 파악할 수 있는 정밀안전모니터링 체계 구축이 시급한 시점이다. 주기적인 정밀안전모니터링 방법들 중에는 위성 등을 활용한 원격관측 기술들이 최근 시도되고 있다. 위성 영상레이더(SAR; Synthetic Aperture Radar)는 마이크로파 대역의 전자기파를 송·수신하는 능동센서로 날씨 및 주·야간에 영향을 받지 않고 지표면 관측이 가능한 장점이 있다. 특히, 고정산란체 영상레이더 간섭(PSInSAR; Permanent Scatterer Interferometry SAR)기법은 영상레이더 영상에서 긴밀도(coherence)가 상대적으로 높은 수자원시설물과 같은 고정산란체의 위상(phase) 정보를 이용하여 mm급의 측정민감도로 시계열 변위 분석이 가능하다. 또한, 여러 장의 InSAR 영상을 생성하였기 때문에 DEM 오차, 위성궤도 오차, 대기 성분에 의한 지연 오차 등을 보다 정밀하게 제거할 수 있는 장점이 있다 본 연구에서는 국내 중대형 수자원시설물의 정밀안전모니터링을 위하여 고정산란체 영상레이더 간섭 기법을 영암금호방조제, 영주댐, 소양강댐 등에 적용하여 시계열 변위 분석을 수행하였다. 2014년 11월부터 2022년 3월(현재)까지 획득된 Sentinel-1 SLC(Single Look Complex) 위성자료의 상승(Ascending) 궤도 126장 및 하강(Descending)궤도 187장을 각각 활용하였다. 두 위성궤도를 모두 활용하여 수직, 수평 변위 등 3차원 분석을 수행하였으며, 특히 소양강댐 GPS 관측 자료와 정확도 검증에서 연평균 2mm의 RMSE를 보였다. 이를 통해 위성 원격탐사 기술로도 댐, 보, 방조제와 같은 수자원시설물에 대한 시계열 변위 분석을 통한 댐 안전관리가 가능함을 보여주고 있다. 2025년 발사될 국내 C-밴드 SAR 탑재 수자원위성 개발을 통해 한반도 재방문주기를 단축시킴으로써, 한반도 전역의 수자원시설물 정밀안전진단체계 구축이 가능할 것으로 기대된다.

  • PDF

Investigation of Generation and Treatment Status of Floating Waste in Chungju Dam (충주댐 부유물 발생 현황조사 및 처리대책)

  • Park, Jae-Hong;Yoon, Suk-Pyo;Lim, Hak-Sang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1291-1295
    • /
    • 2005
  • 제천, 충주, 단양의 3 개 지자체에 걸쳐 있는 충주호는 매년 여름철 집중호우시 부유쓰레기가 $3,000\~45,000\;m^3$ 의 범위에서 반복하여 발생하고 있으며 이들 대부분은 제천시 관내에서 수거되고 있다. 현재 부유쓰레기의 수거 및 육상 집하는 수자원공사가 담당하고 있으며 제천시는 이를 폐기물 매립장으로 운반하여 매립하고 있다. 이러한 부유쓰레기는 무게로는 그리 많지 않으나 부피가 매우 커 운반시 수거 차량의 운행대수가 많아지고 매립지 용량을 크게 소모하는 등 쓰레기 처리과정상의 문제점을 발생시키고 있으며 특히 부유쓰레기의 발생은 1 회성이 아니라 매년 장마와 홍수가 발생하면 되풀이되는 현상으로, 수자원 확보 및 홍수조절을 위해 설치된 댐에 의해 집중호우시 발생된 부유쓰레기가 댐 수위가 낮아짐에 따라 댐 주변부에 잔류하게 되어 수자원 및 수질 관리에 큰 어려움을 발생시키고 있다. 이러한 부유쓰레기는 댐 상류지역에 방치된 쓰레기들이 강우시 지표류와 함께 떠내려 온 것들로서 발생원인의 완전 제거는 불가능한 실정이므로 발생된 부유쓰레기를 최대한 신속히 수거하고 수거된 쓰레기는 소각이나 톱밥 생산 등의 물질자원화 방법으로 매립 양을 최소화 할 필요가 있다. 이에 본 연구에서는 충주댐에서 매년 집중호수시 발생하는 부유쓰레기의 발생 및 수거, 처리실태를 조사하며 또한 제천관내에 부유 쓰레기의 집중되는 원인을 분석하고 이로부터 적절한 부유쓰레기 관리대책을 수립하고자 하였다. 충주댐 부유물 발생 현황 조사 및 처리대책에 관한 연구결과는 다음과 같다. 부유쓰레기 발생량은 태풍의 발생에 따라 급격히 증가하여 년간 $12,587m^3\~45,356m^3$ 이 발생하고 있었다. 댐 및 하천 흐름 해석을 위해 2 차원 동수역학 모델인 RMA2 모형을 이용하여 충주댐에서의 물의 흐름을 해석한 결과 옥순대교$\~$청풍대교 구간 사이에 댐 및 지형적 영향으로 인해 잘 발달된 와류가 하도 전체를 통하여 발생되고 있었고 이는 댐 부유물 정체현상이 나타나는 지점과 잘 일치하고 있었다.

  • PDF

Analysis and Application of CCHE2D on Channel-Bed Elevation Changes Downstream from Yong-Ju Multi-purpose Dam in Korea (댐건설로 인한 댐하류 하상변동 CCHE2D모형 분석.적용(영주댐하류 내성천 회룡포 구간 중심으로))

  • Kim, June-Ho;Park, Jae-Young;Kim, Jong-Gae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.342-342
    • /
    • 2011
  • 댐의 건설로 인해 자연적인 물의 흐름이 댐 운영에 의하여 조절되기 때문에 유사의 연속성 및 유량의 변화에 따른 지형 환경적 변화가 예상된다. 따라서 영향분석을 위한 체계적인 조사 및 연구가 필요할 것이다. 본 연구는 내성천 영주댐 건설 예정지로부터 48.4km 하류인 회룡포 구간에서 하상변동이 예상됨에 따라 현장 조사를 수행하고, 장래변화를 예측하기 위하여 수치모델을 수행하였다. 수리학적 변화량은 금회 수립중인 하천정비계획의 계획 홍수량인 댐건설 전 4,040cms, 댐건설 후 2,934cms로 구분하고, 유사변화량은 영주댐 실시설계 보고서결과를 적용하여 분석하였다. 한편 2001년과 2010년의 실측종단변화를 검토한 결과, 회룡포 구간에서 0.5m~1.7m의 퇴적이 진행되고 있음을 알 수 있었다. 수치모델 및 실측한 데이터를 종합적으로 판단한 결과, 단기호우사상에 대해 댐 건설 후 회룡포 구간의 사주퇴적능력은 -0.05m로 감소되어 그 영향은 비교적 미미할 것으로 분석 되었고, 대부분의 변화는 주수로에서 -0.5~0.5m로 변화될 것으로 예측되었다. 하상 변동의 양상은 실측한 10년간의 종단변화와 같은 경향성을 보이며, 횡단번호 No.15 이후로 0.5m이상 퇴적이 이루어 질 것으로 예측되었다. 본 연구결과는 댐건설로 인한 하천 하상변화에 대한 특성을 파악하고 하천공사 나 수리구조물 설계의 기초자료로 활용될 수 있을 것으로 판단되며, 향후 지속적인 모니터링 및 조사를 통하여 하상변동양상을 관측하고 분석할 필요가 있을 것으로 판단된다.

  • PDF

Assessment of Climate Change Impact on Downstream Flow by Dam Operations during the Drawdown Period (기후변화가 이수기 댐운영에 따른 하류하천유량에 미치는 영향 평가)

  • Park, Jong-Yoon;Ha, Rim;Jung, In-Kyun;Kang, Boo-Sik;Chung, Se-Woong;Kim, Seong-Joon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.157-157
    • /
    • 2012
  • 본 연구에서는 충주댐유역($6,642km^2$)을 대상으로 미래 기후변화가 다목적댐의 이수운영에 따른 하류하천유량에 미치는 영향을 평가하고자 하였다. 이를 위해, 물리적 기반의 장기유출모형인 SWAT(Soil and water assessment tool) 모형과 저수지의 홍수조절, 용수공급계획, 저수지 제약사항 조사 및 실시간 의사결정지원이 가능한 HEC-ResSim 모형을 적용하였다. 먼저, 미래 댐유입량 산정을 위해 IPCC(Intergovernmental panel on climate change)에서 제공하는 A1B 배출시나리오를 포함하는 MIROC3.2 hires 모형의 결과로부터 충주댐 유역의 총 6개 기상관측소에 대한 과거 30년(1997~2006) 실측자료를 바탕으로 미래 온도와 강수에 대한 편이보정(Bias correction) 및 상세화(Downscaling) 과정을 통하여 미래 기후자료(2040s, 2080s)를 생산하였다. 그 결과, 미래 연평균 온도는 기준년도인 2010년에 비해 최대 $+4.8^{\circ}C$(2080s)의 온도증가를 보였으며, 강수량의 경우 여름과 가을 강수량이 다소 감소하였으나 연평균 강수량은 최대 +34.4%(2080s) 증가하는 것으로 전망되었다. 기후변화에 따른 충주댐의 유입량 산정은 SWAT모형을 이용하여 수자원공사에서 제공하는 1995~2010년까지의 일별 댐유입량 자료를 제공받아 모형의 보정 및 검증을 실시하였다. 기후변화 시나리오 적용에 따른 연평균 댐 유입량은 2080s에 39.8% 증가는 것으로 전망되었다. 이러한 댐유입량의 변화는 댐운영의 변화를 가져올 것으로 예상된다. 따라서, 본 연구에서는 HEC-ResSim모형을 이용하여 충주댐의 월별 용수공급계획(생공용수, 발전용수, 관개용수, 하천유지용수) 및 저수지 운영룰(Rule)에 따른 이수운영모의를 통해 미래 댐유입량 시나리오별 저수위변화 및 방류량을 산정하고 하류 하천의 유황변화를 분석하였다.

  • PDF