• Title/Summary/Keyword: 댐 개발

Search Result 926, Processing Time 0.03 seconds

Development of the Dredged Sediments Management System and Its Managing Criteria of Debris Barrier (사방댐 준설퇴적물 관리시스템 개발 및 관리기준 제안)

  • Song, Young-Suk;Yun, Jung-Mann;Jung, In-Keun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.4
    • /
    • pp.267-275
    • /
    • 2018
  • The dredged sediment management system was developed to have an objective, quantitative and scientific decision for the optimum removal time of dredged sediments behind debris barrier and was set up at the real site. The dredged sediment management system is designed and developed to directly measure the dredged sediments behind debris barrier in the field. This management system is composed of Data Acquisition System (DAS), Solar System and measurement units for measuring the weight of dredge sediments. The weight of dredged sediments, the water level and the rainfall are measured in real time using the monitoring sensors, and their data can be transmitted to the office through a wireless communication method. The monitoring sensors are composed of the rain gauge to measure rainfall, the load cell system to measure the weight of dredged sediments, and water level meter to measure the water level behind debris barrier. The management criteria of dredged sediments behind debris barrier was suggested by using the weight of dredged sediments. At first, the maximum weight of dredged sediments that could be deposited behind debris barrier was estimated. And then when 50%, 70% and 90% of the maximum dredged sediments weight were accumulated behind debris barrier, the management criteria were divided into phases of Outlooks, Watch and Warning, respectively. The weight of dredged sediments can be monitored by using the dredged sediment management system behind debris barrier in real time, and the condition of debris barrier and the removal time of dredged sediments can be decided based on monitoring results.

A Study on the Vulnerable Ranking of Hydrological Safety on Existing Dams (기존댐 수문학적 안전성 취약 순위 도출에 관한 연구)

  • Park, Jiyeon;Kim, Tae Hyung;Kwon, Ji-Hye
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.322-322
    • /
    • 2016
  • 국내 1, 2종 댐 시설물은 "시설물의 안전관리에 관한 특별법(이하 시특법)" 제7조에 의해 주기적으로 정밀안전진단을 실시하여 상태평가 및 안전성평가에 의한 종합평가 등급을 부여하고 있다. 정밀안전진단 중 안전성 평가의 수문학적 안전성 평가는 댐의 구조형식과 현장진단 결과에 의한 댐의 상태평가에 따라 1차적으로 수행된다. 여유고 부족 또는 월류 발생 등의 1차적인 조건을 만족시키지 못할 경우 그에 따른 댐체의 구조적 안전을 검토(콘크리트댐)하고, 최종적으로 댐 붕괴 발생 시 하류에 미치는 인적, 경제적 위험요인 등을 기준으로 평가하는 3단계 평가가 수행된다. 본 논문에서는 위 단계적 평가가 수행된 기존댐의 수문학적 안전성 평가 및 상태평가 결과를 사용하여, 1종 기존댐에 대한 수문학적 안전성 취약 순위를 선정하고자 한다. 취약 순위를 선정하기 위하여 다기준의사결정기법(Multi-Criteria Decision Making: 이하 MCDM)을 적용하였고, MC DM의 Payoff Matrix 설정을 위하여 수문학적 안전성 평가 지표를 기준으로 설정하였으며, 이 외의 기준으로는 대상 댐의 연최대 강수량 값을 사용하였다. 연최대강수량값을 산정하기 위하여 기상관측소별 연최대 강수량 30년치의 평균값을 kriging 기법에 적용하여 대상댐에 대한 연최대강수량 값을 도출하여 수문학적 안전성 평가 지표 및 기존댐의 기상 관측값에 따른 댐별 수문학적 안전성 취약 순위 선정에 관한 연구를 수행하였다. 위 결과를 활용하여 수문학적 안전성 평가등급에 대한 검토 및 기후변화 적응 댐 수문학적 안전성 평가 프레임워크 개발을 위한 기초 자료로 활용될 것으로 기대된다.

  • PDF

Analysis of Boryeong dam diverted tunnel operation effect using reservoir simulation (저수지 모의운영 기법을 활용한 보령댐 도수로 운영효과 분석)

  • Choi, Youngje;Ahn, Jaehwang;Yi, Jaeeung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.184-184
    • /
    • 2016
  • 최근 기후변화로 인하여 과거에는 발생하지 않았던 기상재해의 발생이 빈번해지고 있으며 그 피해규모도 전 세계적으로 증가하고 있다. 그 중 가뭄은 용수공급에 가장 직접적으로 영향을 미치는 원인이다. 우리나라에서는 2010년 이후 지속적인 가뭄이 발생하고 있다. 특히 2015년 금강서해유역의 보령강우관측소에서 연강우량은 783.1 mm로 보령강우관측소의 연평균강우량 1,244.3 mm 대비 62.9%에 불과하였다. 특히 많은 강우량이 집중되는 8월 누적강우량은 30.2 mm(예년대비 7%), 9월 누적강우량은 13.3 ??(예년대비 6%)로 보령지역에서는 강우 부족에 의한 가뭄이 2015년 이후 현재에도 진행 중이다. 국토교통부는 보령지역에 2016년 봄까지 충분한 강우가 내리지 않는다면 보령댐의 용수공급이 불가능할 것으로 판단하여 금강에 위치한 백제보 하류와 보령댐 상류를 연결하는 보령댐 도수로를 계획하였다. 국내에서 용수공급을 위하여 도수로를 이용한 사례로는 안동-임하댐 연결 도수로와 임하댐과 영천댐을 연결한 영천도수로 등이 있으며 관련된 연구로는 도수로 운영 이후 댐의 가용 수자원량을 분석한 사례가 있다. 본 연구에서는 도수로를 통해 보령댐으로 공급된 수량이 보령댐의 생공용수 공급에 미치는 영향을 분석하고자 하였으며 분석을 위해 미 육군공병단에서 개발한 저수지 모의운영 소프트웨어인 HEC-ResSim을 이용하여 보령댐이 완공된 1998년부터 2015년까지 18년 동안 보령댐 저수지 모의운영을 실시하였다. 모의운영 조건으로는 도수로 운영조건 및 용수공급 조정기준을 고려하여 케이스별로 모의운영을 실시하였고 그 결과를 바탕으로 이상갈수 시 공급순위가 가장 높은 생공용수의 공급신뢰도를 이용하여 도수로 운영효과를 비교 분석하였다.

  • PDF

Utility of Deep Learning Model for Improving Dam and Reservoir Operation: A Case Study of Seonjin River Dam (섬진강 댐의 수문학적 예측을 위한 딥러닝 모델 활용)

  • Lee, Eunmi;Kam, Jonghun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.483-483
    • /
    • 2022
  • 댐과 저수지의 운영 최적화를 위한 수문학적 예보는 현재 수동적인 댐 운영이 주를 이루면서 활용도가 높지 않다. 불확실한 기후변화나 기후재난 상황에서 우리 사회에 악영향을 최소화하기 위해 선제적으로 대응/대비할 수 있는 댐 운영 방안이 불가피하다. 강우량 예측 기술은 기후변화로 인해 제한적인 상황이다. 실례로, 2020년 8월에 섬진강의 댐이 극심한 집중 강우로 인해 무너지는 사태가 발생하였고 이로 인해 지역사회에 막대한 경제적 피해가 발생하였다. 선제적 댐 방류량 운영 기술은 또한 환경적인 변화로 인한 영향을 완화하기 위해 필요한 것이다. 제한적인 기상 예보 기술을 극복하고자 심화학습이나 강화학습 같은 인공지능 모델들의 활용성에 대한 연구가 시도되고 있다. 따라서 본 연구는 섬진강 댐의 시간당 수문 데이터를 이용하여 댐 운영을 위한 심화학습 모델을 개발하고 그 활용도를 평가하였다. 댐 운영을 위한 심화학습 모델로서 시계열 데이터 예측에 적합한 Long Sort Term Memory(LSTM)과 Gated Recurrent Unit(GRU) 알고리즘을 구축하고 댐 수위를 예측하였다. 분석 자료는 WAMIS에서 제공하는 2000년부터 2021년까지의 시간당 데이터를 사용하였다. 입력 데이터로서 시간당 유입량, 강우량과 방류량을, 출력 데이터로서 시간당 수위 자료를 각각 사용하였으며. 결정계수(R2 Score)를 통해 모델의 예측 성능을 평가하였다. 댐 수위 예측값 개선을 위해 하이퍼파라미터의 '최적값'이 존재하는 범위를 줄여나가는 하이퍼파라미터 최적화를 두 가지 방법으로 진행하였다. 첫 번째 방법은 수동적 탐색(Manual Search) 방법으로 Sequence Length를 24, 48, 72시간, Hidden Layer를 1, 3, 5개로 설정하여 하이퍼파라미터의 조합에 따른 LSTM와 GRU의 민감도를 평가하였다. 두 번째 방법은 Grid Search로 최적의 하이퍼파라미터를 찾았다. 이 두가지 방법에서는 같은 하이퍼파라미터 안에서 GRU가 LSTM에 비해 더 높은 예측 정확도를 보였고 Sequence Length가 높을수록 정확도가 높아지는 경향을 보였다. Manual Search 방법의 경우 R2가 최대 0.72의 정확도를 보였고 Grid Search 방법의 경우 R2가 0.79의 정확도를 보였다. 본 연구 결과는 가뭄과 홍수와 같은 물 재해에 사전 대응하고 기후변화에 적응할 수 있는 댐 운영 개선에 도움을 줄 수 있을 것으로 판단된다.

  • PDF

An Analysis of Groundwater Level Fluctuation Caused by Construction of Groundwater Dam (지하댐 건설에 따른 유역 내 지하수위 변화 특성 해석)

  • Kim, Jong-Tae;Kim, Man-Il;Chung, Il-Moon;Kim, Nam-Won;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.19 no.2
    • /
    • pp.227-233
    • /
    • 2009
  • Most of hydrological processes of groundwater recharge generally are occupied a rainfall, and recharged an aquifer along infiltrate into subsurface. These processes mainly have an influence by hydrological characteristics and topographic gradient of the aquifer. Development of water resources and its management is not good because of temporal and spatial disproportion in local rainfall. In order to deal with insufficiency of water resources from now on, development of groundwater dam requires a plan of a sustainable of new water resources. These are necessary that investigation of construction area of groundwater dam, effective groundwater development interconnected with surface water and groundwater, and assessment of an application of groundwater dam for utilization of water resources. Tn this study we were derived the input data by geological survey, hydraulic and hydrological analysis around Hoengchun-river, located in Hadong-gun, Gyeongsangnam Province where is a plan area for construction of groundwater dam. Based on input data we were carried out the interconnected analysis of surface water and groundwater using the SWAT-MODFLOW, and predicted groundwater fluctuation of its construction before and after.

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( II ) - Simulation of Historical Flood Events - (퍼지제어모형을 이용한 다목적 댐의 홍수조절모형 (II) - 과거홍수사상에 대한 적용 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Cho, Won-Cheol;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.1 s.12
    • /
    • pp.41-50
    • /
    • 2004
  • The objective of this study is to investigate the feasibility of the developed Fuzzy control techniques in dam operation. The simulated results for the 1984, 1990, and 1995 flood events are compared with historical operation results in the view of flood control and disaster prevention. The three models developed in this study determine the outflows based on the two conditions the first one is to consider only two inputs such as reservoir water level and inflow, for operation of the existing situations, the second one is that the possible maximum discharge from each dam does not exceed the allowable design maximum discharge for disaster prevention in downstream area. As the results, it was shown that the suggested models based on Fuzzy control technique could reduce both the peak water level and the maximum peak discharge compared with the historical operation results.

Development of dam inflow simulation technique coupled with rainfall simulation and rainfall-runoff model (강우모의기법과 강우-유출 모형을 연계한 댐 유입량 자료 생성기법 개발)

  • Kim, Tae-Jeong;So, Byung-Jin;Ryou, Min-Suk;Kwon, Hyun-Han
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.4
    • /
    • pp.315-325
    • /
    • 2016
  • Generally, a natural river discharge is highly regulated by the hydraulic structures, and the regulated flow is substantially different from natural inflow characteristics for the use of water resources planning. The natural inflow data are necessarily required for hydrologic analysis and water resources planning. This study aimed to develop an integrated model for more reliable simulation of daily dam inflow. First, a piecewise Kernel-Pareto distribution was used for rainfall simulation model, which can more effectively reproduce the low order moments (e.g. mean and median) as well as the extremes. Second, a Bayesian Markov Chain Monte Carlo scheme was applied for the SAC-SMA rainfall-runoff model that is able to quantitatively assess uncertainties associated with model parameters. It was confirmed that the proposed modeling scheme is capable of reproducing the underlying statistical properties of discharge, and can be further used to provide a set of plausible scenarios for water budget analysis in water resources planning.

HEC-6를 이용한 하천의 하상적응과정분석 (반변천을 중심으로)

  • Park, Hee-Young;Jang, Chang-Lae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.683-687
    • /
    • 2009
  • 하천의 하상은 장기간에 걸친 교란으로 변화를 겪으며 자연 평형상태에 이르게 된다. 하천에서의 교란은 자연적인 교란과 인위적인 교란으로 나눌 수 있다. 자연적인 교란은 홍수, 태풍, 지진, 해충, 질병, 사태, 극고 저온, 한발 등을 포함하며 생태계의 안정성, 저항성 및 복원성에 의하여 자연 복원되는 경우이며, 인위적인 교란은 댐건설, 하도정비, 골재채취 기타 다른 하천 구조물의 축조 등으로 인해 생태계의 구조와 기능에 막대한 변화가 초래되는 경우이다. 따라서 이러한 교란된 하천의 하상변동 경향을 분석하고 예측하여 이 치수 구조물 축조에 반영하고 하천 생태계 교란의 영향을 최소화 시키는 것이 하천 환경적 측면에서 매우 중요하다고 할 수 있다. 본 연구에서는 경상북도 안동시 임하면 임하리에 위치한 반변천의 임하 역조정지댐 직하류부터 낙동강 합류점까지 10.92km 지역을 연구대상지역으로 선정하여, 미공병단에서 개발된 하상변동 수치모형인 HEC-6를 이용하여 댐 건설전과 건설 후에 대하여 하상변동을 모의하였다. 그 결과 처음 5년간은 하상이 $0.5{\sim}1.0m$정도 저하되었으나 10년이 지났을 때, 댐 건설전의 경우에는 $-0.4{\sim}2.2m$, 댐 건설 후에는 $-0.2{\sim}1.3m$정도로 하상이 변화되었다. 이는 댐이 없을 경우에는 처음 5년간은 하상이 심하게 저하되었다가 10년이 지나면서 하상 저하율이 감소되면서 평형상태를 이루는데 댐이 있을 경우에는 하상이 저하되는 감소율이 더 적어지면서 댐이 있을 때보다 하상저하가 적게 이루어진 것 때문으로 사료된다.

  • PDF

Water Supply Effects by Water Transfer in Parallel Reservoirs (유역변경에 의한 병렬저수지 시스템의 용수공급효과)

  • Jang, Kwang-Jin;Ko, Jin-Seok;Jee, Hong-Kee;Lee, Soon-Tak
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.2281-2285
    • /
    • 2008
  • 본 연구는 인접한 저수지 간의 연계운영을 통해 용수공급효과를 제고시키기 위한 저수용량 공유기법 개발의 일환으로서 안동댐과 임하댐의 병렬저수지 시스템을 연구대상유역으로 선정하였다. 홍수기 임하댐에서 안동댐으로 전환할 수 있는 유량은 재현기간 T=50년일 때 $106.657{\times}10^6m^3$, T=80년일 때 $69.587{\times}10^6m^3$, T=100년일 때 $50.858{\times}10^6m^3$ 및 T=150년일 때 $14.771{\times}10^6m^3$로 분석되었으며, 그때의 유입용량은 각각 $344.056{\times}10^6m^3$, $376.144{\times}10^6m^3$, $391.214{\times}10^6m^3$$422.029{\times}10^6m^3$으로 나타났다. 홍수기에 안동댐에 저류된 임하댐의 이와 같은 빈도별 유입량은 갈수기에 다시 안동댐에서 임하댐으로 전환시켜 원활한 용수공급이 이루어질 수 것으로 판단된다.

  • PDF

Vegetation Development Mechanism and Flood Drainage Capability Reduction Characteristic at Downstream of Dams (댐하류 하도의 식생 메카니즘과 홍수소통능력 저감특성)

  • Yeo, Woon Ki;Lim, Ki Seok;Lee, Seung Yun;Jee, Hong Kee;Lee, Soontak
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.922-926
    • /
    • 2004
  • 1970년대부터 시작된 산업화와 도시화는 국토 전반에 걸쳐서 개발을 촉진시켰으며, 그 결과로 나타나기 시작한 홍수재해와 용수부족은 보다 많은 저수시설을 요구하게 되었다. 즉, 홍수유출을 저감시키기 위해서 유역의 저류기능을 강화시킬 수 있는 댐 건설은 이수적인 측면에서 안정적인 용수공급을 보장해주는 수단으로 겸용되어 왔으며, 특히 다목적댐이 건설되면서 하도의 첨두홍수유출량을 줄이는데 크게 기여해 왔다. 댐에 의해 홍수가 사실상 사라진 댐 하류에서는 유사이송이 줄어들면서 주수로는 좁아지며, 낮아진다. 홍수가 없어진 주변 홍수터에는 식생이 활착하여 그 폭이 점차 커지고 하상은 높아진다. 과거 댐 건설 전까지 불안정했던 작은 독려 사주에도 홍수가 없어지면서 식생이 뿌리를 내리게 되고 이로 인하여 식생에 의한 난류변화와 와류의 형성으로 주변에 유사의 퇴적이 증가하게 된다. 결과적으로 식생이 활착할 수 있는 면적이 확장되면서 사주는 점차 넓어진다. 특히, 홍수터나 사주의 외딴 관목 식생에 의한 주변 하상의 세굴, 미립토사의 퇴적, 하상재료의 분급효과는 생태 서식 측면에서 귀중한 휴식처나 피난처를 제공하게 된다. 따라서 본 연구에서는 하도의 상류에 댐이 건설되고 난 후에 댐하류의 하도에서 발생하고 있는 식생 메카니즘과 이로 인한 조도증가와 유속저하 및 홍수소통능력의 저감현상을 규명하였다.

  • PDF