• Title/Summary/Keyword: 댐체

Search Result 80, Processing Time 0.033 seconds

Deformation Analysis of Dam Structure using Terrestrial Laser Scanning System (지상 레이저 스케닝 자료를 활용한 댐체의 변형해석)

  • Kim, Young-Kyung;Shon, Ho-Woong;Im, Eun-Sang;Lim, Jeong-Yeol;Kim, Ki Young
    • Journal of the Korean Geophysical Society
    • /
    • v.9 no.4
    • /
    • pp.333-341
    • /
    • 2006
  • Since considerable time passed after completion of dam construction, Methods to judge the safety and/or to manage effectively have extreme limitation and restriction. Behavior analysis based on one point (site) by such as surface settlement gauge is typically performed in order to define deformation characteristic of dam. However, deformation characteristics of entire dam can not be analyzed by this method. This study adopted state-of-the-art terrestrial laser scanning technology, and developed the technology to analyze the entire deformation of dam. The analysis was compare with the outputs of surface settlement gauge to confirm the performance of 3D terrestrial laser scanning technology. As a result, through analyses of laser scanning data and the surface settlement gauge data, the studied dam shows behavior of deformation by own weight of dam. It is possible to confirm that the dam is entering the stage of stabilization presently.

  • PDF

A study on monitoring the inner structure of dam body using high resolution seismic reflection method (고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구)

  • Kim Jungyul;Kim Hyoungsoo;Oh Seokhoon;Kim Yoosung
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.15-20
    • /
    • 2005
  • Defects of dam body which can be induced in seepage or leakage procedure can directly affect dam safety. Therefore, a proper inspection method should be carried out in the first place to find out their positions and sizes, After that, some reinforcement works such as grouting and the corresponding assessment could be taken in a proper way. The dam(center core type earth dam) issued in this study has been in need for intensive diagnosis and reinforcement work, because a lot of slumps similar to cracks, seepage and some boggy area have been observed on the downstream slope. High resolution seismic reflection method was performed on the crest profile twice before and after grouting work(Aug. 2001 and Nov. 2004) aimed at the dam inspection and the assessment of grouting efficiency as well. To enhance the data resolution, P-beam energy radiation technique which can reduce the surface waves and hence to reinforce the reflection events was used. Strong reflection events were recognized in the stack section before grouting work, It seems that the events would be caused by e.g. horizontal cracks with a considerable aperture, Meanwhile such strong reflection events were not observed in the section after grouting. That is, the grouting work was dear able to reinforce the defects of dam body. Hence, the section showed an well arranged picture of dam inner structure. In this sense, seismic reflection method will be a desirable technique for dam inspection and for monitoring dam inner structure as well.

  • PDF

A study on Monitoring the Inner Structure of Dam Body Using High Resolution Seismic Reflection Method (고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구)

  • Kim, Jung-Yul;Kim, Hyoung-Soo;Oh, Seok-Hoon;Kim, Yoo-Sung
    • Journal of the Korean Geophysical Society
    • /
    • v.8 no.1
    • /
    • pp.1-6
    • /
    • 2005
  • Defects of dam body which can be induced in seepage or leakage procedure can directly affect dam safety. Therefore, a proper inspection method should be carried out in the first place to find out their positions and sizes. After that, some reinforcement works such as grouting and the corresponding assessment could be taken in a proper way. The dam(center core type earth dam) issued in this study has been in need for intensive diagnosis and reinforcement work, because a lot of slumps similar to cracks, seepage and some boggy area have been observed on the downstream slope. High resolution seismic reflection method was performed on the crest profile twice before and after grouting work(Aug. 2001 and Nov. 2004) aimed at the dam inspection and the assessment of grouting efficiency as well. To enhance the data resolution, P-beam energy radiation technique which can reduce the surface waves and hence to reinforce the reflection events was used. Strong reflection events were recognized in the stack section before grouting work, It seems that the events would be caused by e.g. horizontal cracks with a considerable aperture. Meanwhile such strong reflection events were not observed in the section after grouting. That is, the grouting work was dear able to reinforce the defects of dam body. Hence, the section showed an well arranged picture of dam inner structure. In this sense, seismic reflection method will be a desirable technique for dam inspection and for monitoring dam inner structure as well.

  • PDF

Deformation Behavior of Existing Concrete-Faced Rockfill Dam due to Raising (증고에 따른 기존 CFRD 댐체의 변형거동)

  • Shin, Donghoon;Cho, Sungeun;Jeon, Jesung;Lee, Jongwook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.6
    • /
    • pp.77-83
    • /
    • 2007
  • In this study, deformation behavior of existing concrete face rockfill dam, which is raised to a certain height to enhance storage capacity or to improve hydraulic and hydrologic stability, is examined using numerical analysis method. The results obtained from FEM analysis show a possibility that additional fill at downstram slope of existing CFRD dam body may lead undesirable deformations and stresses in existing dam body, especially in face concrete, such as settlements in upper part and bulging in lower part, excessive bending moments, and eventualy tensile cracks. Therefore, in designing multi-staged raising construction of CFRD, it is essential to consider deformations and stresses to be developed within and between exisiting dam body and added parts due to additional fill, and to prepare a proper measure to prevent abnormal deformations and stresses in the dam body including added parts.

  • PDF

The Study on micro-hydropower used surplus water resources on the dam (댐체 관개용수를 활용한 초소수력발전에 관한 연구)

  • Lee, Dong-Hee;Yang, Hyun-Sik;Hong, Young-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1342-1343
    • /
    • 2011
  • 댐체를 통해 하류 관개용수로 무효방류되는 수자원을 활용한 초소수력 발전가능성에 관한 고찰을 통해 개발 가능한 신재생 에너지 발굴 및 경제성과 타당성에 대하여 검증해 보고자 한다.

  • PDF

Estimation of Dynamic Material Properties for Fill Dam : I. In-situ Shearwave Velocity Profiles (필댐 제체 재료의 동적 물성치 평가 : I. 현장 전단파 속도 주상도)

  • Kim, Jong-Tae;Kim, Dong-Soo;Park, Heon-Joon;Kwon, Hyek-Kee
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.12
    • /
    • pp.69-85
    • /
    • 2009
  • It is very important to measure reliable dynamic properties of each zone in dam for seismic design. However, the Vs values of core and rock-fill zone are seldom determined by field test. Consequently, seismic design in dam is performed using Vs values assumed or empirically determined. So, it is required that reliable Vs has to be evaluated by in-situ test. In this study, surface wave method, which is nondestructive, was applied to dam to evaluate Vs profiles of core and rock-fill zone in dam. In 6 dams, using SASW and HWAW methods, Vs profiles were evaluated reliably. D/B of Vs profiles of each zone with depth and relationship between confining pressure and Vs profiles of rock-fill zone were constructed including existing results of other dams. The evaluated D/B and proposed relationship were compared with the frequently used empirical method by Sawada and Takahashi.

Deformation Characteristics of Earth Dam Raised by Non-Homogeneous Fill Materials (비균질 재료로 숭상(嵩上)한 흙 댐의 변형 특성)

  • 장옥성;이종규
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.8
    • /
    • pp.167-180
    • /
    • 2004
  • In this study finite element analysis using hyperbolic model was performed to predict the characteristics of stress-strain behaviour on concrete face earth dam (CFED : a tentative name) raised with coarse-grained materials corresponding to the face slab bedding zone of concrete face rockfill dam (CFRD). The results of finite element analysis were compared with field monitoring data, and the comparison showed a good agreement. And, the analysis results including locus of maximum displacement, maximum stress, stress concentration, and irregular load transfer would be used to devise rational field monitoring schemes for construction management and quality control during construction of CFED.

인공구조물의 밀도분포 파악을 위한 고정밀중력탐사

  • Im, Hyeong-Rae;Park, Yeong-Su;Im, Mu-Taek;Gu, Seong-Bon;Gwon, Byeong-Du;O, Seok-Hun
    • 한국지구과학회:학술대회논문집
    • /
    • 2005.02a
    • /
    • pp.147-152
    • /
    • 2005
  • 인공구조물인 댐체의 밀도 분포를 밝히기 위하여 사력댐에서 고정밀중력탐사를 수행하였다. 얻어지는 중력이상값이 매우 작은 양이므로 정밀한 지형보정을 위하여 삼각요소법을 도입하였다. 역산을 위해서도 댐체의 모양을 그대로 반영할 수 있도록 임의 다면체로 구성하였고, 글로벌 역산인 ASA를 이용하여 해석하였다. 해석결과는 댐의 코어 부분과 모래와 암석으로 채워진 부분이 명확히 구분되었고, 댐의 중앙부에 상대적인 저밀도가 존재하는 수평적인 밀도 변화도 확인할 수 있었다.

  • PDF