• Title/Summary/Keyword: 다단계 긴장

Search Result 14, Processing Time 0.023 seconds

Optimal Tension Forces of Multi-step Prestressed Composite Girders Using Commercial Rolled Beams (상용압연 형강을 이용한 콘크리트 합성거더의 다단계 긴장력 최적설계)

  • Shin Yung-Seok;Jung Heung-Shi;Kim Young-Woo;Park Jea-Man
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.19 no.2 s.72
    • /
    • pp.115-124
    • /
    • 2006
  • The 1st and 2nd tension forces of the PSSC(Prestressed Steel and Concrete) grider constructed with commercial rolling beams and concrete are optimally designed. The design variables are the 1st and 2nd tension forces due to multi-step prestressing and live load. The objective function is set to the maximum live load. Design conditions are allowable stresses at the top and bottom of slab, beam and infilled concrete due at the several construction stages. A Matlab based optimization program is developed. The results show that the tendon position as well as concrete compression strength have significant influence on the beam strength.

Dynamic Performance Estimation of the Incrementally PSC Girder Railway Bridge by Modal Tests and Moving Load Analysis (다단계 긴장 PSC 거더 철도교량의 동특성 실험 및 주행열차하중 해석에 의한 동적성능 평가)

  • Kim, Sung Il;Kim, Nam Sik;Lee, Hee Up
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4A
    • /
    • pp.707-717
    • /
    • 2006
  • As an alternative to conventional prestressed concrete (PSC) girders, various types of PSC girders are either under development or have already been applied in bridge structures. Incrementally prestressed concrete girder is one of these newly developed girders. According to the design concept, these new types of PSC girders have the advantages of requiring less self-weight while having the capability of longer spans. However, the dynamic interaction between bridge superstructures and passing trains is one of the critical issues concerning these railway bridges designed with more flexibility. Therefore, it is very important to evaluate modal parameters of newly designed bridges before doing dynamic analyses. In the present paper, a 25 meters long full scale PSC girder was fabricated as a test specimen and modal testing was carried out to evaluate modal parameters including natural frequencies and modal damping ratios at every prestressing stage. During the modal testing, a digitally controlled vibration exciter as well as an impact hammer is applied, in order to obtain precise frequency response functions and the modal parameters are evaluated varying with construction stages. Prestressed force effects on changes of modal parameters are analyzed at every incremental prestressing stage. With the application of reliable properties from modal experiments, estimation of dynamic performances of PSC girder railway bridges can be obtained from various parametric studies on dynamic behavior under the passage of moving train. Dynamic displacements, impact factor, acceleration of the slab, end rotation of the girder, and other important dynamic performance parameters are checked with various speeds of the train.

Work-Family Role Strain in Dual-Earner Families : A Theoretical Model for Husbands (맞벌이 부부가족에 있어서의 일과 가정생활의 역할 긴장에 관한 연구: 남편에 대한 이론적 모델의 검증)

  • 김영희
    • Journal of the Korean Home Economics Association
    • /
    • v.30 no.3
    • /
    • pp.271-283
    • /
    • 1992
  • 본 연구의 목적은 가족스트레스 이론과 선행연구를 바탕으로 하여 제안된 이론적 모델의 검증을 통하여 일과 가정생활의 두 역할을 병행하는 데서 기인하는 역할긴장이 매개변수인 가족자원과 대처방안에 의해 어떻게 중재되어 삶의 질에 영향을 미치는가를 규명하는데 있다. 다단계 추출법으로 미국 로스엔젤레스에 거주하는 한인교포 중 맞벌이부부를 연구대상으로 선정하여 질문지를 통해 남편과 아내의 자료를 표집하였지만 본 연구에서는 117명의 남편의 자료만을 결과 분석하였다. 분석방법은 이론적 검증에 유용한 LISREL Ⅶ 프로그램이 사용되었다. 처음에 제안된 이론적 모델의 검증에는 문제를 보였지만 PSI Matrix를 고정하고 가정생활의 역할 stressor와 가족자원의 경로를 첨가하여 수정된 모델은 자료에 의해 충분히 검증되었다. 그러나 남편의 이론적 모델은 가족스트레스 이론을 일반화시키지 못했기 때문에 일과 가정생활의 두 역할을 병행하는 데서 기인하는 남편의 역할긴장을 가족스트레스 이론으로 설명하는데는 문제가 있는 것으로 나타났다. 연구결과를 바탕으로 본 연구에서 제안된 이론적 모델의 의미와 제한점 등을 살펴본 후 미래연구가를 위한 방안이 제시되었다.

  • PDF

축대칭 PC탱크의 유한요소 해석

  • 이이환;김동언
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.05b
    • /
    • pp.981-986
    • /
    • 1995
  • 이 논문의 목적은 축대칭 프리스트레스트 콘크리트 탱크의 시간의존성 유한요소해석법을 제안하는 것이다. 오늘날 PC구조물은 교량, 포장판, 해상구조물, 원자로 격납구조물, 대규모 액체저장용 탱크 등 여러 형태의 구조물에서 그 사용 예를 쉽게 찾아볼 수 있다. 특히 본 논문에서 고려하고자 하는 압력창기나 액체 저장용 탱크의 경우 유체압력 등의 내부압력에 의해 발생하는 균열은 프리 스트레스를 도입함으로써 매우 효과적으로 제어할 수 있기 때문에 상당히 유리한 구조형식이 된다. 그러니 이러한 구조물의 해석과 설계에 있어서 균열의 예측과 더불어 콘크리트의 크리이프, 건조수축 및 PC강재의 리락세이션 등과 같은 시간 의존성 변형으로 인한 프리스트래스의 손실, 여러 단계의 긴장력을 도입함으로써 발생하는 순간변형인 탄성단축 및 이로 인한 긴장력 감소 등을 정확히 계산하는 일은 매우 복잡하고 어려운 일이다. 본 논문에서는 크리이프, 건조수축 및 리락세이션 등과 같은 시간의존성 변형과 순차적으로 다단계의 프리스트레스 도입으로 인한 순간변형 및 탄성단축의 영향을 고려한 축대칭 PC 탱크 구조물의 시간에 따른 거동 및 긴장력의 변화를 유한요소법을 적용하여 해석할 수 있는 해법체계를 정리하고 이를 전산 프로그램화하여, 축대칭 PC탱크 구조물의 시간 의존성 거동에 대한 보다 정밀한 해석을 수행하였다.

  • PDF

Dynamic Test and Analysis of Multilevel Post-tensioned PSC Girder with Holed Web (중공부가 있는 다단계 긴장 PSC 거더의 동특성 실험 및 해석)

  • Park, Bong-Sik;Cho, Jae-Yeol;Han, Man-Yeob
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.11-12
    • /
    • 2010
  • PSC girder with holed web have several benefits. Most of all placing tendon anchorage in the holes can make prestressing forces be loaded stepwise. In addition it can reduce the self-weight of the beams and increase the span length of beams. And holed web might minimize the interference of view. In this study, a 50-meter long full scale multilevel post-tensioned PSC girder was fabricated and modal test was carried out. In order to obtain precise frequency response, vibration exciter was placed at the middle of the girder and excited with several frequencies. Natural frequency and damping ratio were evaluated from FFT and PSD using the obtained frequency response and compared with numerical analysis result.

  • PDF

Assessment for Extending Span Ranges of PSC Girder Bridges : II. Application to a Sample Bridge (PSC 거더교의 장경간화 평가 기법 : II. 예제 분석)

  • Jeon, Se Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3A
    • /
    • pp.243-250
    • /
    • 2009
  • The purpose of this study is to investigate several strategies that can be used to extend the span of conventional PSC girder bridge and to propose a systematic procedure to evaluate the effect of each strategy on the span. In the preceding companion paper, fundamental equations were derived which constitute the assessment graphs and a possible domain for the design. Quantitative evaluation for extension of the span follows here by adopting a sample PSC girder bridge. It apparently shows a number of advantages of the proposed scheme in finding out why and how each strategy contributes to the span extension and in suggesting further improvement for a longer span. The results imply that increasing the strength of a girder, the multistage prestressing with the secondary tendons prestressed before composite action with a deck, and Decked PSC girder are very effective among the strategies examined. It is expected that the span of the PSC girder bridge can be well extended up to 50 m to 70 m which corresponds to a span of the conventional box girder bridges.

Flexural Performance of Multistage Prestressed and Self-weight Preflex Girder (다단계 자중 프리플렉스 및 프리스트레싱 합성거더의 시공단계에 따른 휨성능 평가)

  • Choi, Byung Ho;Kim, Tae Bong;Park, Sung Kyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.29 no.4
    • /
    • pp.311-321
    • /
    • 2017
  • This paper deals with the flexural performance of a composite girder system designed to readily form a composite section without a formwork and to easily realize multistage preflexing and prestressing. After a 3-Dimensional finite element modeling for construction stage analysis, the parametric numerical analysis was performed to analyse the stress distribution on the composite girder sections and the prestressing effects along with concrete pouring method and strand tensioning method. Based on the stress distribution analysis, a favorable construction stage model has been rationally chosen and then the ultimate flexural strengths were evaluated to conduct a comparative study, which exceed the nominal flexural strength suggested by the current design specification(ASD). It can be concluded that the proposed composite girder and fabrication procedure should have a sufficient structural performance.

Assessment for Extending Span Ranges of PSC Girder Bridges : I. Proposed Strategy to Estimate the Spans (PSC 거더교의 장경간화 평가 기법 : I. 경간 평가 기법의 제안)

  • Jeon, Se Jin;Choi, Myoung Sung;Kim, Young Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3A
    • /
    • pp.235-241
    • /
    • 2009
  • PSC girder bridge is known to be more economical than other types of bridges and has been usually applied to a span range of 25 m to 35 m according to the standard shapes for highway bridges in Korea. The spans of the recently developed new types of PSC girders are also limited to 50 m at most. In this study, therefore, feasibility of the long-span PSC girder that reaches more than 50 m is investigated by applying several strategies from the perspectives of materials, design and construction. A systematic procedure is proposed that can be used to assess the effect of each strategy on the span. The proposed scheme adopts a graphical approach that represents a relationship between the number of prestressing tendons and the span, and is derived on a basis of safety assessment equations of the girder in each stage of fabrication and in service. In the companion paper, the amount of span extension is quantitatively evaluated by applying the proposed scheme into a sample PSC girder bridge.

Monitoring of Long-Term Behavior of The Continuous IPC Girder Bridge (IPC거더 연속교의 장기거동 모니터링)

  • Lee, Hong-Woo;Ahn, Jeong-Seang;Kim, Kyoung-Won;Yu, Sang-Hui
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.349-352
    • /
    • 2008
  • IPC girder is more prestressed and has smaller sectional area than the conventional PSC-I type girder due to incremental prestressing along the construction process. The continuous IPC girder bridge may have problems in serviceability and stresses at internal supports because it is very flexible. In this paper, The long-term behavior of the continuous IPC girder bridge is studied through long-term structural analysis and monitoring the deflections. The long-term behavior is monitored right before the introduction of 2nd prestressing that is the construction process different from the conventional PSC-I type girder bridge. The total station of high-precision was used in measuring the deflections. According to the monitoring result so far, the continuous IPC girder bridges does not show remarkable long-term behavior like severe camber or deflection and the measured deflections are very similar to the results of long-term structural analysis.

  • PDF

Optimal Tension Forces of Multi-step Prestressed Composite Girders Using Commercial Rolled Beams (상용압연 형강과 콘크리트 합성거더의 다단계 긴장력 최적설계)

  • 정홍시;김영우;박재만;신영석
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.04a
    • /
    • pp.95-102
    • /
    • 2004
  • The 1st and 2nd tension forces of the PSSC(Prestressed Steel and Concrete) girder constructed with commercial rolling beams and concrete are optimally designed. The design variables are the 1st and 2nd tension forces due to multi-step prestressing and live load. The objective function is set to the maximum live load. Design conditions are allowable stress at the top and bottom of slab, beam and infilled concrete due to a construction step. An Optimization of Matlab based program Is developed. The results show that the tendon position and concrete compression strength etc are important.

  • PDF