• Title/Summary/Keyword: 녹색건설

Search Result 233, Processing Time 0.023 seconds

An Estimation of the Minimum Distance Between a Roundabout and Signal Crosswalk Using VISSIM (VISSIM분석을 통한 회전교차로 인접 신호횡단보도의 최소이격거리 산정)

  • KIM, Young Beom;LEE, Dongmin;Jun, Jin Woo;Cho, Hanseon
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.4
    • /
    • pp.337-347
    • /
    • 2015
  • Since the application of roundabouts by 2010 have been started, more than 350 roundabouts were installed in Korea. Recently the types of constructed roundabouts become various, and the intersection conditions for installing roundabouts were also various. However, there were some difficulties to install roundabouts around school zone due to safety problems. In this study, appropriate distance from adjacent signal crosswalks to roundabouts were estimated for securing pedestrian safety and operation efficiency around school zone. With the analyses, the minimum distance standard was suggested to obtain operational effectiveness of roundabout according to traffic volume, traffic flow, pedestrian green time and secures pedestrian safety and convenience. In this paper, average delay of roundabout as various length of distances between an adjacent crosswalk and a roundabout as different pedestrian signal times, traffic volumes, traffic flow rates were analyzed. Through this study, it was found that about four times of delay in a roundabout was generated if there was adjacent signal crosswalk. However if there is enough distance between an adjacent crosswalk and a roundabout, the value of increasing delay on roundabouts with adjacent a signalized crosswalk can be considerably reduced. Critical value of the distance between a roundabout and a signal crosswalk in case of roundabouts within 200-500 vehicle/hour/lane entry traffic flow, 20-40% of left turn traffic, and over 15 seconds pedestrian green time was about 50 meters. In conclusion, if there is minimum 40 meter distance from roundabouts, adjacent signal crosswalks can be installed and operated for students' safety around school zone.

Studies on the Roadside Revegetation and Landscape Reconstruction Measures (도로녹화(道路綠化) 및 도로조경기술개발(道路造景技術開発)에 관(関)한 연구(硏究))

  • Woo, Bo Myeong;Son, Doo Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.48 no.1
    • /
    • pp.1-24
    • /
    • 1980
  • One of the most important basic problems for developing the new techniques in the field of road landscape planting practices in Korea, is to clarify, analyse, and evaluate the existing technical level through actual field survey on the various kinds of planting techniques. This study is, therefore, aimed at the good grasp of detail essences of the existing level of road landscape planting techniques through field investigations of the executed sites. In this study, emphasized efforts are made to the detail analysis and systematic rearrangements of such main subjects as; 1) principles and functions of the road landscape planting techniques; 2) essential elements in planning of it; 3) advanced practices in execution of planting of it; 4) and improved methods in maintenance of plants and lands as an entire system of road landscape planting techniques. The road landscape planting techniques could be explained as the planting and landscaping practices to improve the road function through introduction of plants (green-environment) on and around the roads. The importances of these techniques have been recognized by the landscape architects and road engineers, and they also emphasize not on]y the establishment of road landscape features but also conservation of human's life environment by planting of suitable trees, shrubs, and other vegetations around the roads. It is essentially required to improve the present p]anting practices for establishment of the beautiful road landscape features, specially in planning, design, execution, establishment, and maintenance of plantings of the environmental conservation belts, roadside trees, footpathes, median strips, traffic islands, interchanges, rest areas, and including the adjoining route roads.

  • PDF

Time-Series Analysis and Estimation of Prospect Emissions and Prospected Reduction of Greenhouse Gas Emissions in Chungbuk (온실가스 배출량 시계열 분석과 전망 배출량 및 감축 감재량 추정 - 충북을 중심으로 -)

  • Jung, Okjin;Moon, Yun Seob;Youn, Daeok;Song, Hyunggyu
    • Journal of the Korean earth science society
    • /
    • v.43 no.1
    • /
    • pp.41-59
    • /
    • 2022
  • In accordance with the enactment of 'the Paris Agreement' in 2015 and 'the Framework Act on Carbon Neutrality and Green Growth for Response to the Climate Crisis' in 2021, each local government has set appropriate reduction target of greenhouse gas to achieve the nationally determined contribution (NDC, the reduction target of 40% compared to 2018) of greenhouse gas (GHG) emissions in 2030. In this study, the current distribution of GHG emissions was analyzed in a time series centered on the Chungbuk region for the period from 1990 to 2018, with the aim of reducing GHG emissions in Chungbuk by 2030 based on the 2030 NDC and scenario. In addition, the prospected reduction by 2030 was estimated considering the projected emissions according to Busines As Usual in order to achieve the target reduction of GHG emissions. Our results showed that GHG emissions in Chungbuk and Korea have been increasing since 1990 owing to population and economic growth. GHG emissions in 2018 in Chungbuk were very low (3.9 %) relative to the national value. Moreover, emissions from fuel combustion, such as cement and lime production, manufacturing and construction industries, and transportation industries, were the main sources. Furthermore, the 2030 target of GHG emission reduction in Chungbuk was set at 40.2% relative to the 2018 value, in accordance with the 2030 NDC and 2050 carbon-zero national scenario. Therefore, when projected emissions were considered, the prospected reduction to achieve the target reduction of GHG emissions was estimated to be 46.8% relative to 2018. The above results highlight the importance of meeting the prospected reduction of GHG emissions through reduction means in each sector to achieve the national and local GHG reduction target. In addition, to achieve the 2030 NDC and 2050 carbon zero, the country and each local government, including Chungbuk, need to estimate projected emissions by year, determine reduction targets and prospect reductions every year, and prepare specific means to reduce GHG emissions.