• Title/Summary/Keyword: 노선선정

Search Result 222, Processing Time 0.024 seconds

Derivation of BIM/GIS Platform Application Scenarios and Definition of Specific Functions in Construction Planning and Design (건설 기획 및 설계 단계 BIM/GIS 통합 플랫폼 활용을 위한 시나리오 도출 및 상세기능 정의)

  • Youn, Junhee;Kang, Tae-Wook;Choi, Hyun-Sang;Kim, Changyoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7340-7349
    • /
    • 2014
  • BIM (Building Information Model) and GIS (Geographic Information System) are applied widely to all stages (Planning - Design - Building - Maintenance) of construction. Recently, research for designing an integrated BIM/GIS platform has been conducted to determine the synergy effects. This paper reports the derivation of BIM/GIS platform application scenarios and definition of specific functions in construction planning and design phases. First, BIM/GIS application scenarios and platform functions are derived for each phase based on an analysis of business affairs. Second, SW functions, which compose platform function, are defined. In the construction planning phase, location selection and route location business affairs were analyzed. Preliminary design and detailed design business affairs were analyzed in the construction design phase. The result of this research can be used for BIM/GIS integrated platform design in the future.

A Consideration on Connecting Operations among Freeway Management Companies (고속도로 관리자간 상호 연계체계 수립에 관한 고찰(한국토로공사가 관리하는 노선을 중심으로))

  • Lee, Gi-Yeong;Kim, Dong-Nyeong;Son, Ui-Yeong;Lee, Cheong-Won
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.4 s.90
    • /
    • pp.19-29
    • /
    • 2006
  • As the rapid increase of highway investments from Private sector the organizations of highway operator became diversified, and thus causing various unexpected problems. Highways invested by private capitals have different fare rates and managing systems. It is desirable to reduce drivers' inconvenience using more than two sections of highways spread over different jurisdictions. The main purposes of this research are i) data survey and problem statements ii) prediction of future problems and preparing appropriate countermeasures. This research are divided into two parts. They are management system and fare collection system. Major investigations of this study are as follows, optimum toll operation models depend on charging systems and interchange shapes of two interconnecting expressways. Assuming that the current payment and the new electronic payment system aye used concurrently for a while, some alternatives for the inter-operation to collect tolls ate suggested focusing on the efficiency to tollway corporations as well as convenience to drivers. The advantages and disadvantages of the alternatives, including their characteristics, are compared.

The Time Prediction for Escape from Flood Using GIS - The Case of Chun-chon City - (GIS분석을 통한 홍수시의 대피예보를 위한 시간 예측 - 춘천시를 중심으로 -)

  • 양인태;김욱남;김재철;박재국
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.19 no.3
    • /
    • pp.211-217
    • /
    • 2001
  • Chun-chon city is the area that is estimated to be damaged by breaking of Dam by a flood among several natural disaster. If so, what is the way that minimize the damage\ulcorner There are many ones but it may be best that we take shelter from it before the breaking of Dam. Then when must we do\ulcorner By what instrument can we minimize the damage of people. And how do we compute the time\ulcorner In this study, using buffering, overlap and network, GIS ability based on ARC/INFO. I chose six routesto take shelter outside of Chun-chon city, calculated the traffic volume of each ones, and estimated the time for decentralization of risks.

  • PDF

The Analysis and Integration of Graphic and Attribute Information for Intelligent Transportation Systems (지능형 교통시스템을 위한 도형.속성정보의 통합 분석)

  • 강준묵;이형석;조성호
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.4
    • /
    • pp.335-342
    • /
    • 2000
  • This study is to integrate and to analyzegraphic and attribute data in features which should be preceding for the ITS construction. A 1:5000 scale map as a national basemap was used and was checked for feasibility. For the convenience of position confirmation, the analysis component was developed and was linked to addresses. Also, the attribute information was considered on the shortest route, and optimal route was selected by investigating traffic volumes on main crossroads depending on the time zone. The optimal route could be selected by analyzing user's demands, position and statistical data, and the position information could be provided efficiently by combining the graphic information with the land register information.

  • PDF

Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

A Study on the Route Selection Method for Demand Response Transport (DRT) Replacement for Bus Services in Vulnerable Areas - Focused on Region Vulnerable to Public Transportation of GyeongSangNam-Do in Korea - (벽지노선 대체형 수요응답형교통(DRT) 노선 선정 방안에 관한 연구 - 경상남도 대중교통 열악지역을 대상으로 -)

  • Park, Ki-Jun;Song, Ki-Wook;Jung, Hun-Young
    • Journal of Korea Planning Association
    • /
    • v.54 no.4
    • /
    • pp.71-78
    • /
    • 2019
  • Due to the rapid pace of low fertility and aging of Korea, population decline is rapidly progressing in the outskirts of the province and county. Demand for public transport is decreasing due to suburban population declines, while local government funding for maintenance of the bus system is expected to increase gradually. The government and municipalities are promoting the introduction of Demand Responsive Transport (DRT) in order to reduce the burden of financial support for buses while enhancing mobility of the residents in vulnerable areas. However, most DRTs in Korea have been operated mainly in the areas that are not provided with public transportation services. Although DRT is able to reduce the financial burden of local governments, it is not easy to be introduced because of the objection of the existing bus users. In this study, 11 out of 61 towns with poor public transportation services in Gyeongsangnam-Do were selected for the introduction of DRT to replace bus services by using village characteristics. The results of this study are expected to be used as a basis for decision making to use DRT instead of bus service for the burden of bus financing for local governments.

A Model of Location Decisions of Natural Gas Filling Station Considering Spatial Coverage and Travel Cost (공간적 접근성 및 통행비용을 고려한 천연가스 충전소 최적 입지선정 모형)

  • Yu, Jeong-Whon;Lee, Mu-Young;Oh, Sei-Chang
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.3
    • /
    • pp.145-153
    • /
    • 2008
  • This study proposes a facility location model in consideration of spatial coverage and travel cost as an effort to make objective and effective decisions of natural gas filling stations. The proposed model is developed for fixed stations and consists of two stages. The first stage employs a heuristic algorithm to find a set of locations which satisfy the spatial coverage constraints determined by the maximum travel distance between the filling stations and bus depots. In the second stage, the optimal location of filling stations is determined based on the minimum travel cost estimated by using a modified transportation problem as well as the construction and maintenance costs of the filling stations. The applicability of the model is analyzed through finding the optimal location of filling stations for the city of Anyang, a typical medium-sized city in metropolitan Seoul, based on the demand of natural gas buses. This study is expected to help promote the spread of natural gas buses by providing a starting point of a objective and reasonable methodological perspective to address the filling station location problem.

Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction (부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구)

  • Lee, Hyobum;Koh, Sung-Yil;Jun, Jonghun;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.59-76
    • /
    • 2020
  • As a continuous increase in demand for the transportation infrastructure in the metropolitan area, the renovation of existing metropolitan and urban railway lines for the rapid transport system requires the construction of sidetrack that can operate local and express trains simultaneously. However, the construction of sidetrack after stopping the operation of the existing subway line causes a lot of economic losses, therefore it is essential to study the tunnel enlargement scheme during the operation of the existing subway tunnel. Accordingly, in this paper, basic research on the enlargement plan of the existing subway tunnel was carried out for the renovation of the existing subway line. In order to investigate the method for the sidetrack construction, the Government Complex Gwacheon station on the Gwacheon line of subway line 4 was selected as a virtual research station. Subsequently, four construction plans including tunnel cross-sectional plan for each section were reviewed and constructability and economic feasibility were compared. Finally, the stability assessment was conducted for the selected construction plan which was considered to be relatively unstable by 3-D full numerical analysis considering the sidetrack construction process.

A case study on optimal location modeling of battery swapping & charging facility for the electric bus system (전기버스를 위한 배터리 자동 교환-충전인프라 배치 최적화 모형개발 및 적용 사례 분석)

  • Kim, Seung-Ji;Kim, Wonkyu;Kim, Byung Jong;Im, Hyun Seop
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.12 no.1
    • /
    • pp.121-135
    • /
    • 2013
  • This paper propose an efficient algorithm for selecting electric bus charging facility location. In nature, the optimal charging facility location problem is similar to Set Covering Problem. Set Covering Problem is the problem of covering all the rows of an $m{\times}n$ matrix of ones and zeros by a subset of columns with a minimal cost. It has many practical applications of modeling of real world problems. The Set Covering Problem has been proven to be NP-Complete. In order to overcome the computational complexity involved in seeking optimal solutions, this paper present an enhanced greedy algorithm and simulated annealing algorithm. In this paper, we apply the developed algorithm to Seoul's public bus system.

Environment-Friendly Optimum Route Selecting With Geo-spatial Information Analysis (지형공간정보분석에 따른 환경친화적 최적 도로노선 선정)

  • Kim, Sang-Seok;Jang, Yong-Gu;Choi, Su-Geun;Kang, In-Joon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.3 s.33
    • /
    • pp.69-77
    • /
    • 2005
  • Most of the evaluations of environmental effect of construction of road do not run parallel with the evaluation of the propriety of the business, but it just reviews how to reduce contamination before the beginning of the construction work. This reveals the limitation of the induction of environment friendly development from the fundamental. In this study, a function of GIS spatial analysis for 9 elements of pre-evaluation of environmental effect has been introduced, and a GIS decision making system for environmental effect of a road has been established for an integrated evaluation by using individual evaluation result. By using GIS decision making system for pre-evaluation of environmental effect that has been developed in this study and the GIS data that has been collected, it would be possible to decrease time and money for evaluation as well as fulfill the requirement of objectivity. Therefore, it would be possible to apply for pre-evaluation of environmental effect when deciding on the route of the road at the beginning stage of the construction work. Also, through the system developed in this study, the construction body could easily induce a mutual agreement with the residents by the visual evaluation material, which might result in an evaluation of environmental effect while decreasing time and money at the beginning stage of the construction.

  • PDF