• Title/Summary/Keyword: 내진보강방안

Search Result 58, Processing Time 0.022 seconds

Seismic Performance Improvement of Concrete Gravity Dam by Post-tensioned Anchors (앵커공법을 적용한 기존 콘크리트 중력식 댐의 내진성능 보강방안)

  • Kim, Yongon;Kim, Se-Il;Ok, Seung-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.5
    • /
    • pp.49-53
    • /
    • 2013
  • This paper describes the assessment of seismic performance of the concrete gravity dam seismically reinforced by post-tensioned anchors. In order to evaluate the seismic performance, the response spectrum analyses have been carried out for 7 different configurations of the post-tensioned anchors, and then their performance improvement in the maximum tensile and compressive stresses is compared to each other. The comparative results demonstrate that the layout of the post-tensioned anchors strongly influences the seismic performance of the concrete gravity dam. In this study, the slightly-inclined vertical anchorage system shows the largest improvement on the overall performance of the seismically-excited concrete gravity dam.

Enhancing Seismic Performance of Exterior R.C. Beam-Column Connections Using Headed Bars (헤디드 바를 사용한 외부 철근콘크리트 보-기둥 접합부의 내진성능 향상)

  • Shin, Hyun Oh;Yang, Jun Mo;Yoon, Young Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.3
    • /
    • pp.186-194
    • /
    • 2011
  • The reinforced concrete beam-column connections are in lack of constructability and are likely to show anchorage failure because of the complex details of joint regions. Under seismic loads, a destruction of the column or the beam-column joint leads to collapse of the whole structures. For this reason, the safety of structures has to be guaranteed by following procedures which are based on the strong column-weak beam design concept: 1) failure of beam by generating plastic hinge in the beam maintained a certain distance from the surface of column, 2) failure of column or beam-column joint. In this study, headed bars were used as longitudinal reinforcements of beam and joint reinforcements in order to improve the strength and constructability of joint and to relocate plastic hinge. The finite element analyses (FEAs) were performed to the reinforced concrete beam-column joints utilizing headed bar reinforcements. To verify the availability of the analysis models, the FEAs for experimental tests performed by previous researchers were conducted and compared with the experimental results. Additional variables are also considered to confirm the excellence of headed bars. Analysis results indicate that the constructability of beam-column connections can be improved by using headed bars for the full anchorage of longitudinal reinforcements of beam under similar structural performance. In addition, the plastic hinge was relocated to the intended place by using headed bars as joint reinforcements. Under cyclic displacement loading, the energy dissipation capacity and ultimate stress were increased and the decrease in stiffness was minimized.

Experimental Study on Seismic Retrofitting Methods for School Building using Aramid Strip (아라미드 스트립을 이용한 학교건축물의 내진성능 보강방안에 관한 실험적 연구)

  • Kim, Hye-Jin;Park, Tae-Won;Cho, Seung-Ho;Lee, Kyung-Koo;Roh, Young-Sook;Chung, Lan
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.3
    • /
    • pp.100-106
    • /
    • 2010
  • Most of the school buildings were built before the seismic code was established. To consider the sunlight and ventilation to the partition walls are built about 1m height beside columns at typical school buildings. For the reason, columns which is consisted school building occur brittle failure shape by the reduced effective depth. In this study, experimental test for retrofitting effect by Aramid Fiber Reinforced Polymers(AFRP) strips on masonry infilled reinforced concrete(RC) frames is performed. The test results were to ensured enough time to evacuate due to the enhancement of ductility and strength of school buildings to withstand earthquakes using AFRP strips.

Comparison analyzation of Calculation Equations for Shear strength of Steel Plate Coupling Beam (철골 플레이트 커플링보의 전단강도에 대한 기준식의 비교.분석)

  • Lee, Kyung-Hwun;Song, Han-Beom;Park, Jin-Young;Yi, Waon-Ho;Tae, Kyung-Hoon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.129-132
    • /
    • 2008
  • Coupled shear wall system is the primary seismic load resisting system of buildings. The coupling beam of these buildings must exhibit excellent ductility and energy dissipation capacity. To achieve better ductility and energy dissipation, the steel coupling beam embedded in the reinforced concrete walls is proposed. Performance of the steel coupling beam is mainly effected by embedment length. ACI equation and BS equation were examined with 23 previous test results. The statistical study uses the values of mean value, standard deviation, correlation coefficient, normal distribution curve, and error analysis. Through the analytical program, the evaluation of the 2 equations was established.

  • PDF

Evaluation on Structural Safety for Bearing seat according to Replacement of Bridge Bearing (교량받침 교체에 따른 보자리 구조 안전성 평가)

  • Choi, Jung-Youl;Lee, Hee-Kwang;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.4
    • /
    • pp.753-760
    • /
    • 2020
  • In this study, the structural safety of the bearing support was analysed by applying the vertical load (bearing design load) and horizontal load (horizontal force generated during an earthquake) using a precise three-dimensional numerical model. The results of stress and displacement of newly-poured concrete and welded rebars were confirmed numerically. Numerical results show that the increase in the horizontal force and the height of the beam causes the concrete cracking and the stress increase of the rebar connections due to the increase of the stress at the new concrete interface. Therefore, it was analyzed that the increase in the height of bearing support is directly related to the horizontal force and it is necessary to apply the bearing support height appropriate for the bearing support capacity. It was proposed that a method of setting the height of the bearing support suitable for the bearing capacity and determining the reinforcement by presenting the guideline with the correlation between the horizontal force acting on the bearing support and its height.

A Study on the Evaluation of the Effect of the Ground Improvement of Reclaimed Land Based on Dynamic Compaction Method (동다짐 공법이 적용된 준설매립지반의 개량효과 평가에 관한 연구)

  • Kim Jong-Kook;Chae Young-Su
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.5
    • /
    • pp.13-26
    • /
    • 2006
  • The purpose of this study is to examine the method of liquifaction potential occuring at the reclaimed land in Incheon district and to compare the result obtained by the method based on the earthquake of 6.5 magnitude. In addition, the effects of ground improvement and liquifaction potential were evaluated on the basis of SPT and CPT, which have been performed before and after the compaction pilot test. As a result, we realized that the bigger the energy of dynamic compaction test was, the better effect we got. After the dynamic compaction test, as the strength of ground increased, the safe factor also increased. It was evaluated that the method of dynamic compaction improved the seismic performance. Accordingly, the method of the quality control of reclaimed land based on dynamic compaction method was presented.

Initial Stiffness of Beam Column Joints of PCS Structural Systems (PCS 구조 시스템 접합부의 초기 강성에 대한 연구)

  • Park, Soon-Kyu;Kim, Moo-Kyung
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.3
    • /
    • pp.271-282
    • /
    • 2008
  • Specific joint devices composed of end-plates and through bolts are under development to assemble steel beams to PC columns efficiently by dry construction method for the PCS structural system, of which major structural components are precast concrete columns and steel beams. Seismic performance of the joint devices had been evaluated by experimental tests in the previous studies and it was showed that all the performance requirements regarding to strength deterioration, stiffness degradation and energy dissipation capacity were satisfied to the criteria of ACI requirements, but the initial stiffness was not. In order to find out possible causes of the insufficient rigidity of the joint devices and provide the proper measures to improve the performance of the joint accordingly, numerical analyses were carried out by using ABAQUS. Parameters, such as thickness of neoprene pad, conditions of surface between PC column and end-plate, magnitude of pretension forces of through bolts, stiffness of end-plate were taken into consideration. As the result, it was found that the rigidity of the PCS system was negatively affected by the magnitude of initial gaps between PC columns and end-plates, and insufficient stiffness of neoprene fillers and end plates. In order to improve the initial stiffness performance of the joints, measures such as increase of the magnitude of pretension forces on through bolts and increase of the stiffness of end-plate by reducing the bolt pitch and providing adequate stiffeners are recommended.

Evaluation of the Actual Conditions for the Construction of a Firefighting Safety Management System in Domestic Power Plants (국내발전소 소방안전경영시스템구축을 위한 실태평가에 관한 연구)

  • Kang, Gil-Soo;Choi, Jae-wook
    • Fire Science and Engineering
    • /
    • v.32 no.1
    • /
    • pp.89-98
    • /
    • 2018
  • Fire accidents in foreign countries, like the accident in a thermal power plant in Beijing, the accidents in domestic power plants, including Boryeong Power Plant in 2012 and Taean Power Plant in 2016, a disaster in a nuclear power plant in Fukushima in 2011 or the large-scale power failure in California in 2001 are safety accidents related to electric power, which caused losses in the people's stable lives and the countries. Electricity has an absolute impact on the people's life and the economy, so we can easily expect the serious situation affecting economic growth as well as direct damage to the protection of the people's lives and the losses of properties, if there are fire or explosion accidents or radioactive leak because of negligence in safety management, or problems because of natural disasters like an earthquake in power plants that generate electricity. In this study, it was drawn the improvement of the organizations exclusively in charge of firefighting, the operation of a program for the improvement of professional competency, the development of a customized firefighting management system for plants for systematic firefighting safety management and the improvement of the earthquake-proof correspondence system, which has recently become an issue, as measures for improvements through a survey of the actual conditions concerning the necessity of the construction of a firefighting safety management system for power plants with five power generation companies, including Korea Southern Power Co., Ltd., and the persons in charge of firefighting safety Korea Hydro & Nuclear Power Co., Ltd.