It is generalized to measure the arch settlement and convergence during tunnel construction for monitoring its mechanical stability. The initial convergence rate a day is defined from the first convergence measurement and the final convergence defined as the convergence measured lastly. The initial and the final tunnel arch settlement are defined like the preceding convergence. In the study, the relations between the initial and final displacements of a shallow tunnel are analyzed. The measurements were performed in the tunnel of subway 906 construction site in Seoul. The overburden is 10-20 m and the tunnel goes through weathered soil/rock. The width and height of the tunnel are about 11.5 m, 10m, respectively. So this is a shallow tunnel in weak rock. The length of tunnel is about 1,820 m and the tunnel was constructed in 2 stages, dividing upper and lower half. The numbers of measurement locations of arch settlement and convergence are 184 and 258, respectively. As a result, the initial displacement rate and the final displacement are comparatively larger in the section of weathered soil.
Face mapping and displacement monitoring during tunnel construction are the most influential information for the stability assessment of ground and around structures. Especially, the result of face mapping and displacement analysis is essential to the excavation and support design in NATM which is based on the drilling and blasting. However, there have not been so many studies to put those useful information into practice for decision-making process during construction. The study reviewed the tunnel behaviour based on the RMR rating and displacement monitoring when the geological condition of rock mass varies inevitably. The study analysed the crown settlement using convergence equation in order to compensate the disparity induced by the location and time of measurement and found a distinct relation between the geological condition and the line of influence. As a result of analysing the various parameters related to the tunnel convergence according to the geological condition, the study suggested the basic knowledge about the relation between face mapping and displacement behaviour of tunnel.
Journal of Korean Tunnelling and Underground Space Association
/
v.10
no.3
/
pp.233-243
/
2008
A tunnel behavior predicted in the investigation and design stage is often different from its actual behavior due to mainly the complexity of ground conditions. In a tunnel construction, therefore, it is necessary to ensure the stability of the tunnel by predicting the behaviors of the ground and the supports through observations and measurements, and modifying immediately excavation and reinforcing methods when necessary. To do so, it is important to be able to predict the final tunnel behavior based on the initial tunnel behavior as early as possible. In this study, the correlations were obtained between the initial and the final convergence by analyzing statistically the convergence measurement data, collected from two domestic road tunnels under construction using NATM. In order to estimate the unknown displacements, occurred during the period between the excavation and the first measurement, two methods were used - one is the method by means of regression analysis using a modified exponential function and the other the method by a simple linear regression analysis using the data measured within the distance from tunnel face equal to the tunnel diameter (D). Finally, the relationships were obtained between the initial and final convergence, including the non-measured displacements estimated from the two different methods, by performing linear regression analyses. The regression analysis results showed that there are clear linear relationships between the initial and final convegence and the difference between the two linear regression equations was not that large for when using the exponential function and the simple linear function to estimate the non-measured displacements.
An inverse calculation method to obtain sectional forces, axial force and flexural moment of a tunnel concrete lining was developed by utilizing convergence measurements acquired at the maintenance stage. To monitor the behavior of the lining, DOCS system was applied to a subway tunnel section. The method was proved to be effective, yielding the same results as measured forces of buried instruments. Many effects such as vibration of sensors, vibration due to test train operation, the variation of temperature and high voltage were checked and a new management scheme for tunnel maintenance was proposed.
Predicting and measuring tunnel convergence is very crucial for estimating tunnel stability and economical construction of NATM tunnels. The method to estimate the tunnel convergence that occurs before and after construction is proposed based on literature reviews. The total displacement occurring related to tunnel construction is determined to be about 2.5 times that of measured displacements. The results of displacement measurements at two tunnels constructed with similar rock types are examined for the investigation of factors affecting the tunnel convergence. The average convergence of Gyungju A Tunnel is about 6.7 times bigger than that of Daejeon B Tunnel. The possible causes of the large convergence in Gyungju A Tunnel are suggested. In order to predict the convergence of tunnels, careful investigation of the geological structures in the ground surface and the influence of external conditions as well as careful face mapping of the tunnel face should be conducted.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.22
no.3
/
pp.209-215
/
2004
Together with the requirements of tunnels, its construction methods and technologies have been pretty much developed, but frequent accidents happened under the constructions are just one of important problems which should be improved. To detect the potential hazardous factors in or ahead of time, speedy and accurate observation are absolutely required, but currently surveying method using tapes, level and total station, has been generally taken in measuring of tunnel convergence and crown. The purpose of this study is, as using of industrial photogrammetry system which is supplying more accuracy and speedy in the measure of tunnel convergence and crown. From the result of this study, we have got up to 1/20,000 accuracy and totally 6 minutes, from picturing 5 sections by one person to data edition, has been taken except setting targets.
The purpose of this study is to present an analysis method for the prediction of the change of ground conditions. To this end, three-dimensional convergence displacements is analyzed in several ways to estimate the trend of displacement change. Three-dimensional arching effect is occurred around the unsupported excavation surface including tunnel face when a tunnel is excavated in a stable rock mass. If the ground condition ahead of tunnel face changes or a weak fracture zone exists a specific trend of displacement change is known to be occurred from the results of the existing researches. The existence of a discontinuity, whose change in front of the tunnel face, can be predicted from the ratio of L/C (longitudinal displacement at crown divided by settlement at crown) etc. Therefore, the change of ground condition and the existence of a fracture zone ahead of tunnel face can be predicted by monitoring three-dimensional absolute displacements during excavation, and applying the methodology presented in this study.
Kim, Kwang-Yeom;Kim, Chang-Yong;Lee, Seung-Do;Seo, Yong-Seok;Lee, Chung-In
The Journal of Engineering Geology
/
v.17
no.4
/
pp.567-576
/
2007
In order to assess the on-site applicability of 3D absolute displacement monitoring of tunnel using digital photogrammetry, the displacement of the optical target placed at the measurement section was investigated, as planned in the OO tunnel construction site. The targets on 3 measurement lines only were considered for each point of measurement for the reconstruction of 3D cubic model for the digital vision monitoring. For each 3D model, 3 or more images have to be obtained at each point. On the last 2 measurement lines, 6 targets (crown, left and right walls) were continuously overlapped to construct 3D models so that 6 or more apices can be shared by 2 3D models. In order to compare the measurement methods of 3D absolute displacements in tunnel excavation, i. e, total station and digital image measurement, both the digital image measurement and optical measurement were conducted for 10 times in the same work section. The time and measurement results of both methods were compared.
Measurement of convergence was/is carried out manually throughout the world for tunnels under construction. However, manual method has certain limitations in terms of applicability for the tunnels in operation. This paper describes state of the art of convergence monitoring systems which are available for measuring displacement of existing tunnels. These technologies are analyzed as follows: 1 The Sofo system using the fiber optic sensors has been applied to the stress measurement of the tunnel lining. It has not yet been used for the monitoring of tunnel convergence because of its cost and reliability 2. A TPMS(Tunnel Profile Monitoring System) using tilt sensors and displacement sensors is used for the convergence monitoring of highway tunnels, subway tunnels and underground ducts. 3. A BCS(Bassett Convergence System) using a pair of tilt sensors can be used for the convergence monitoring of tunnels, however the accuracy of the measurement has to be improved because it uses AC input voltage during data acquisition. The system has to be validated before it can be applied to the tunnels in operation. Convergence monitoring systems using TPMS and/or BCS are recommended to be evaluated and improved by a series or tests in tunnels under construction in order to be applied to the main measuring section and the tunnels in operation.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.15
no.6
/
pp.20-26
/
2001
In this paper, we design tunnel inner section displacement measurement system which is composed of potentiometer-type displacement sensors, microcontroller-based intelligent sensing head and host computer for the management system and acquisition data. Multiple node communication bus connects the intelligent sensing heads with the host computer. For safe and re1iab1e network operation we use daisy-chain configuration, termination resistor, fail-safe biasing circuit. For tole enhancement of system utilization, we use modbus protocol. The acquisition data are transmitted to host computer and managed by database. Several data request conditions and sorting conditions are provided by management software. The utilization of designed system is confirmed by experiment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.