In this work, the treatment of heavy metals and phenol in the contaminated soil was investigated by applying direct current (DC) and pulse voltage. When the DC was used, the removal efficiencies for Cu, Zn, As, and Pb were 73, 88, 10, and 10%, respectively, and more than 95% for phenol was removed. Furthermore, when a pulse voltage was employed the removal efficiencies for Cu, Zn, As, and Pb were 88, 92, 40, and 40%, respectively, and 87% of phenol was removed. The results indicate that the application of a pulse voltage for the treatment of contaminated soil reduced electro-osmosis, but increased the rate of electric current movement of heavy metals. In addition, the removal efficiencies for As and Pb have been improved due to the enhanced adsorption capacity of clay components in the soil. Therefore, these experimental results could be effectively applied in remediation technology for the treatment of various heavy metals and phenol.
The stabilization using limestone ($CaCO_3$) and steel making slag as the immobilization amendments for Cu and Pb contaminated farmland soils was investigated by batch tests, continuous column experiments and the pilot scale feasibility study with 4 testing grounds at the contaminated site. From the results of batch experiment, the amendment with the mixture of 3% of limestone and 2% of steel making slag reduced more than 85% of Cu and Pb compared with the soil without amendment. The acryl column (1 m in length and 15 cm in diameter) equipped with valves, tubes and a sprinkler was used for the continuous column experiments. Without the amendment, the Pb concentration of the leachate from the column maintained higher than 0.1 mg/L (groundwater tolerance limit). However, the amendment with 3% limestone and 2% steel making slag reduced more than 60% of Pb leaching concentration within 1 year and the Pb concentration of leachate maintained below 0.04 mg/L. For the testing ground without the amendment, the Pb and Cu concentrations of soil water after 60 days incubation were 0.38 mg/L and 0.69 mg/l, respectively, suggesting that the continuous leaching of Cu and Pb may occur from the site. For the testing ground amended with mixture of 3% of limestone + 2% of steel making slag, no water soluble Pb and Cu were detected after 20 days incubation. For all testing grounds, the ratio of Pb and Cu transfer to plant showed as following: root > leaves(including stem) > rice grain. The amendment with limestone and steel making slag reduced more than 75% Pb and Cu transfer to plant comparing with no amendment. The results of this study showed that the amendment with mixture of limestone and steel making slag decreases not only the leaching of heavy metals but also the plant transfer from the soil.
Han Sang-Jae;Kim Byung-Il;Lee Goon-Taek;Kim Soo-Sam
Journal of Soil and Groundwater Environment
/
v.10
no.2
/
pp.1-11
/
2005
This study applied EK method to remediate contaminated soil by lead (Pb), tried increasing efficiency of remediation using adsorbent (apatite and zeolite) as enhanced EK remediation method to overcome the limit of traditional EK remediation method. Adsorption tests on Pb were practiced to extract EK, making different concentration of contaminated soil, voltage condition, operating time etc., transferring Pb-ion into the position of adsorbent, then tried immobilization. On this results, the efficiency of remediation is different on its test conditions. In addition, the efficiency of remediation was not only improved by adding electrode revεrsal and install position of adsorbent but also satisfied TCLP regulation of EPA in USA through the whole sample range. Finally, absorption and immobilization capacity of apatite and zeolite proved on its excellence and confirmed the possibility of application of apatite and zeolite as enhanced EK remediation method.
Lee Jong-Yeol;Kim Yong-Soo;Kwon Young-Ho;Kong Sung-Ho;Park Shin-Young;Lee Chang-Hwan;Sung Hae-Ryun
Journal of Soil and Groundwater Environment
/
v.9
no.4
/
pp.1-7
/
2004
To choose a organic acid and in-organic acid composite which is the most effective in soil-flushing process cleaning lead-contaminated sites, lead removal rates were investigated in the experiments with some organic acids; 0.01M of EDTA showed the highest lead-extraction rate ($69.4\%$) compared to the other organic acids. Furthermore, the lead removal rates were measured with 0.01M of EDIA and 0.1M of in-organic acid ; a EDTA and boric acid composite showed the highest lead-extraction rate ($68.8\%$) at pH5 compared to the other composites. As the concentration of boric acid was increased from 0.1M to 0.4M in a 0.01M of EDTA and boric acid composite, lead removal rate was decreased from $68\%\;to\;45\%$. But as the concentration of EDTA was increased from 0.01M to 0.04M in a EDTA and 0.1M of boric acid composite, permeability was decreased from $6.98{\times}10^{-4}cm/sec$ (0.01M of EDTA) to $5.99{\times}10^{-4}cm/sec$ (0.04M of EDTA). However, permeability was increased from $4.41{\times}10^{-4}cm/sec$ (0.03M of EDTA) to $6.26{\times}10^{-4}cm/sec$ (0.03M of EDTA and 0.1M of boric acid composite). indicating EDTA could increase lead dissolution/extraction rate and decrease permeability. In this system, lead remediation rate is the function of lead dissolution rate from soils and permeability of the composite into soils, and the optimized [EDTA]/[Boric acid] ratio is [0.01M]/[0.1M].
Retention ponds have been dug along some of the motorways in France to minimize environmental pollution by preventing pollutants from spreading over the surrounding area. A series of studies have been conducted to determine the physicochemical characteristics of the particles settling down in such a pond to evaluate the effectiveness of the pond as a trap for heavy metals such as Pb, Zn and Cd. The highly contaminated roadside soil and the uncontaminated background soil were also studied for comparison. The settling particles exhibited heavy metal concentrations of 2 to 8 times as much as the background Sologne soil, depending on the metal species. However, the heavy metal concentrations in the roadside soil were 7 to 26 times higher than those in the· settling particles. Sequential extraction experiments illustrated that the highly contaminated roadside soil consisted mainly of the readily soluble fractions (FII, FIII and FIV) for all three heavy metals, but little W which is hardly soluble. The proportion of W considerably increased up to one third of the total in the settling particles for Pb and Zn. This result as well as the large concentration differences between the roadside soil and the settling particles indicates that most of the heavy metals were lost to the surroundings even before reaching the retention pond. Cd exhibited somewhat different behavior in that the most soluble FI, which is negligible for Pb and Zn, occupied as much as one fourth of the total in the roadside soil. In addition, FV for Cd did not increase in the settling particles.
Retention ponds have been dug along some of the motorways to control water flow during rainstorms and to minmize environmental pollution. A retention pond located at Les Ardilleres about 20km South of Orleans along the A-71 motorway has been selected to evaluate the effectiveness of such a pond as a trap for heavy metals. Based on the "index of geoaccumulation" and the "enrichment factor" normalized to Fe introduced by Muller in 1979 and by Helz in 1976, respectively, the degree of contamination by heavy metals for the roadside soil and the settling particles was evaluated. As expected, the contamination was very severe in the roadside soil, while it was not so great in the settling particles. Using these methods, cadmium anomaly was traced in the settling particles of the retention pond, their occurrence being attributed partly to natural and partly to anthropogenic pollution. The estimated input of heavy metals associated with settling particles to the pond was 0.9 g/day Pb, 2.1 g/day Zn and 6mg/day Cd. A tentative mass balance of Pb and Zn originated by motor vehicles suggested that only 5 to l1% of heavy metals deposited on the surface of the motorway is carried to the retention pond by runoff water ; suggestions are made to improve their efficiency.ve their efficiency.
Journal of Korean Society of Environmental Engineers
/
v.32
no.2
/
pp.185-192
/
2010
The objective of this study was to investigate the effectiveness of stabilization for army firing range soil highly contaminated with Pb (total Pb: 29,000 mg/kg) using calcined waste oyster shells. The calcination was conducted to activate quicklime from calcite. In order to evaluate the effectiveness of calcination, both natural oyster shells (NOS) and calcined oyster shells (COS) were applied to the Pb contaminated soil. Stabilization was conducted by mixing the contaminated soil with oyster shell media at 5-20 wt% and cured for 28 days. Following 28 days of curing, Pb leachability was measured based on the Korean Standard Test method (0.1 N HCl extraction). The treatment results showed that the COS treatment outperformed the NOS treatment. All of the NOS treatments failed to meet the Korean warning standard of 100 mg/kg. However, the Pb concentrations were significantly reduced to 47 mg/kg and 3 mg/kg upon 15 wt% and 20 wt% COS treatments, respectively which passed the Korean warning standard. Moreover, -#20 mesh materials were more effective than the -#10 mesh materials in effectively reducing Pb leachability. The scanning electron microscopy (SEM)-energy dispersive X-ray spectroscopy (EDX) results indicated that Pb immobilization was strongly linked to Al and Si.
Kim, Sung-Hyun;Hong, Sun-Hwa;Kang, Ho-Jeong;Ryu, Hee-Wook;Lee, Sang-Don;Cho, Kyung-Suk;Lee, In-Sook
Journal of Ecology and Environment
/
v.29
no.6
/
pp.559-563
/
2006
This work was investigated the effects of the elevated $CO_2$ and Pb contamination on the growth of Pinus densiflora. Two-years pine trees were planted in Pb-contaminated soils (500 mg/kg-soil) and uncontaminated soils, and cultivated for 3 months in the growth chamber where $CO_2$ concentration was controlled at 380 or 760 ppmv. The growth of P. densiflora were comparatively analyzed in 4 kinds of soil samples (CA : $CO_2$ 380 ppmv + Pb 0 mg/kg, CB : $CO_2$ 380 ppmv + Pb 500 mg/kg, EA : $CO_2$ 760 PPmv + Pb 0 mg/kg, EB : $CO_2$ 760 ppmv + Pb 500 mg/kg). It was measured the growth changes of the p. densiflora caused by $CO_2$ concentration and Pb contamination. The growth of P. densiflora was remarkably inhibited in the Pb-contaminated soil, although the biomass and the root elongations were not significantly affected by the elevated $CO_2$. These results suggested that the growth of p. densiflora was sensitively influenced by Pb contamination rather than $CO_2$ concentration. Compared to the initial soil, total Pb concentration in the soil samples was decreased at 760 ppmv $CO_2$ as well as at 380 ppmv $CO_2$ after 3 months. The accumulation of Pb in the roots at 760 ppmv $CO_2$ was two-fold of that at 380 ppmv $CO_2$, indicating that Pb bioavailability in the root of p. densiflora might be affected by the elevated $CO_2$.
The variety and density of entomopathogenic nematodes from the polluted soils of heavy metals were examined. In order to investigate the pollution of heavy metals in soil, 300 sites in kyungsangbuk-do were collected from March to October in 2001. We measured the contents of seven heavy metal elements (Cd, Cu, As, Hg, Pb, Cr^{6+}$, CN) and than cheesed soil of 25 sites with high concentration of heavy metals. The seven strains of nematodes were isolated from seven samples by silkworm host (Bombyx mori mori) and white trap. Isolated nematodes are composed of two families, one order. The members of Rhabditida were isolated in the soil with mean Cd content of 0.870 ppm. And they were isolated in the soil samples with As content less than 0.745 ppm. However they were isolated regardless of concentration of Cu and Pb. The members of Cylindrocorpidae were isolated in the soil samples with Cr^{6+}$ content less than 0.05 ppm. Any entomopathogenic nematode was not detected in the CN polluted soil. Isolated nematodes successfully cultured on the silkworm host and were confirmed the pathogenicity, multiplicity, and tolerance against various condition of preservation. Which proved its potential usefulness as biological agent.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.