• Title/Summary/Keyword: 기계식 슬리브 철근이음

Search Result 2, Processing Time 0.023 seconds

Evaluation on Stiffness of Mechanical Sleeve Bar Splice Filling High-strength Mortar Under Monotonic Loading (고강도 모르타르를 충전한 기계적 슬리브 철근이음에 대한 단조가력 하에서의 강성 평가)

  • Kim, Hyong Kee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.4
    • /
    • pp.79-88
    • /
    • 2012
  • The purpose of this study is to evaluate the stiffness of the mechanical sleeve reinforcement splices filling high-strength mortar under monotonic loading. For this objective, we analyzed and compared the previous test data of 189 actual-sized mortar-filled sleeve bar splices specimens, including the reinforcing bar splices prepared and tested by the author. The paper results indicated that the minimum values of compressive strength of mortar($f_g$) multiplied by the ratio of reinforcement development length to bar diameter(L/d) were suggested for holding the stiffness of the mortar-filled sleeve reinforcement splices required in AIJ code.

Development of Non-Shrink Mortar Grouting Type Splice Sleeve (무수축 모르타르 충진형 슬리브 개발)

  • Lee, Young-Ho;Song, Jae-Joon;Cho, Jae-Young;Kim, Do-Hak
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.2
    • /
    • pp.67-73
    • /
    • 2011
  • This study aims to develop an economical precast hollow concrete column with high constructability which consists of only splice sleeve and general reinforcing bar without using PC tendons in order to reduce the construction period and cost. With this purpose, this study performed the finite element analysis and tension test by using some variables such as length of sleeve, diameter of rebar and curing method for suggesting a grouting type splice sleeve which is a new type joint rebar and developing an optimized splice sleeve. As a result, the analysis on the tension performance of splice sleeve did not show any destruction caused by pull-out in reinforcing bar but it only occurred destruction of tension bar or bolt shear rupture from the mechanical defect of sleeve. Therefore, the experiment showed high performance in tension of the suggested splice sleeve and verified the application of precast hollow concrete column.