• Title/Summary/Keyword: 급속교량시공

Search Result 32, Processing Time 0.022 seconds

Accelerated Construction Method of Long-span PSC Girder Bridge for the Recovery of Flood Damaged Road (수해도로 복구를 위한 장경간 프리캐스트 바닥판 PSC거더교 교량 급속 시공)

  • Oh, Hyun Chui;Ma, Hyang Wook;Kim, In Gyu;Kim, Young Jin
    • Journal of Korean Society of societal Security
    • /
    • v.1 no.4
    • /
    • pp.51-56
    • /
    • 2008
  • Because of our country's climate that has the 50% of the annual precipitation in summer, annually a lot of bridges on the roads are broken in this season. So, we need an accelerated bridge construction method that complete to repair the roads. This paper introduces the Hangae 2 bridge, prefabricated bridge using full depth precast deck panels and new types of PSC girders. The Hangae 2 bridge located in lnje-gun, kangwon-do. This is a good example of the accelerated bridge construction method for recovery of flood damaged road. The PSC girder bridge system introduced in this paper is a rapid construction method for bridge that can reduce the term of works over 50%.

  • PDF

Proposal of Domestic Road Bridge Deck Deterioration Models and Forecast of Replacement Demand (국내 도로교량 바닥판 열화모델 제안 및 교체 수요 예측)

  • Kim, Jin-Kwang;Jang, Il-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.4
    • /
    • pp.61-68
    • /
    • 2017
  • Bridge decks are members that rapidly deteriorated due to various environmental factors such as heavy vehicle and deicing salt, etc. As the lifespan of bridges built in Korea increases, it is expected that the demand for replacing the deteriorated bridge decks will increase. In other countries, Accelerated Bridge Construction technology using precast decks is already actively being used as a countermeasure for replacement demand of deteriorated bridge decks. In this study, bridge decks deterioration models are proposed by collecting and analysing the condition index data of domestic bridge decks. Also, the future replacement demands of deteriorated bridge decks in terms of replacement time and replacement scale are predicted.

Track-Structure Interaction Analysis of Fast Hardening Track on Railway Bridge Considering Effect of Anchor and Friction (앵커와 마찰의 영향을 고려한 교량상 급속경화궤도의 궤도-교량 상호작용해석)

  • Cho, Sang-Hyeon;Lee, Il-Wha;Chung, Won-Seok;Lee, Hee-Young;Lee, Kyoung-Chan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.31 no.1
    • /
    • pp.53-61
    • /
    • 2018
  • Ballast track requires constant maintenance work due to progress of track irregularity. Fast Hardening Track(FHT) has been developed to reduce the maintenance effort done by injecting fast hardening mortar in aged ballast to convert slab track. For the application of FHT to a railway bridge, post-installed anchors should be placed at center of the track segment to fix it on bridge. This paper presents track-bridge interaction analysis results with FHT considering stiffness and strength of post-installed anchor, age of FHT concrete and friction between FHT and bridge deck surface. Based on the analysis results, this study suggests when is good to install the anchors and allow normal operation of passing train.

Evaluation on Flexural Performance of Precast Bridge Decks with Ribbed Connection (요철형 이음단면을 갖는 프리캐스트 교량 바닥판의 휨성능 평가)

  • Shin, Dong-Ho;Park, Se-Jin;Oh, Hyun-Chul;Kim, In-Gyu;Kim, Young-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.3
    • /
    • pp.1-9
    • /
    • 2015
  • Due to the increasing number of deteriorated bridges worldwide, the importance of maintenance and replacement of existing bridges are being emphasized. Cast-in-place concrete deck which is mainly applied to deck replacement of existing bridges have problems such as deterioration concerns by initial crack, labor cost increase, difficulties of maintenance and replacement, construction time increase, and indirect cost increase by traffic congestion. On the contrary, a precast concrete deck is considered as an effective alternative because of its quality assurance and accelerated construction. The connection method ensuring the required strength and durability is especially important, because the connection part of the precast concrete deck is vulnerable to cracks and leakage. Therefore, this study proposes precast bridge decks with ribbed connection which are more improved than existing bridge deck joints, and flexural performance is verified through various parameter tests.

Seismic Performance of Prefabricated Composite Column for Accelerated Bridge Construction (급속시공을 위한 조립식 합성교각의 내진성능 평가)

  • Lee, Jung-Woo;Chin, Won-Jong;Joh, Chang-Bin;Kwark, Jong-Won
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.4
    • /
    • pp.425-430
    • /
    • 2010
  • This paper investigates the seismic behavior of a prefabricated composite column which is made by onsite connection of precast composite column segments to accelerate bridge construction. Quasi-static cyclic loading tests were performed on three prefabricated composite columns with different connection details to find their seismic capacity. Test results show that the onsite connections remains in elastic range and no slip is observed as designed in spite of plastic hinge formation at the column. The test results also indicate that the prefabricated composite column has better overall seismic capacity compared to a conventional reinforced concrete column with seismic details.

A Study on the Flowability Properties of the High Flowing Self-Compacting Concrete for Members of Bridge Precast (프리캐스트 교량부재용 초유동 자기충전 콘크리트의 유동 특성에 관한 연구)

  • Choi, Yun Wang;Kim, Yong Jic;Kang, Hyun Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1A
    • /
    • pp.155-163
    • /
    • 2008
  • On the construction site with trends of large scale, high rise and specialization, testing construction of high performance concrete, superior to conventional concrete, is continued to increase. For bridge construction, application of full staging method is gradually decreasing due to noise, dust, and prolonged construction period. Recently, precast construction, which is optimized to urban environment and shorter work period, gains popularity significantly. In bridge structure, overcrowding arrangement of bar is used to ensure its safety. For the manufacturing of overcrowding arrangement of bar, High flowing self-compacting concrete, which is superior to conventional concrete in flowability and compacting property, should be implemented. In this study, the application of blast-furnace slag and fly ash to binary and ternary blended system on the High flowing self-compacting concrete for bridge structure with overcrowding arrangement of bar is evaluated by flowability in accordance with the first class regulations of Japan Society of Civil Engineering (JSCE).