Track-Structure Interaction Analysis of Fast Hardening Track on Railway Bridge Considering Effect of Anchor and Friction (앵커와 마찰의 영향을 고려한 교량상 급속경화궤도의 궤도-교량 상호작용해석)

  • Cho, Sang-Hyeon;Lee, Il-Wha;Chung, Won-Seok;Lee, Hee-Young;Lee, Kyoung-Chan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.31 no.1
    • /
    • pp.53-61
    • /
    • 2018
  • Ballast track requires constant maintenance work due to progress of track irregularity. Fast Hardening Track(FHT) has been developed to reduce the maintenance effort done by injecting fast hardening mortar in aged ballast to convert slab track. For the application of FHT to a railway bridge, post-installed anchors should be placed at center of the track segment to fix it on bridge. This paper presents track-bridge interaction analysis results with FHT considering stiffness and strength of post-installed anchor, age of FHT concrete and friction between FHT and bridge deck surface. Based on the analysis results, this study suggests when is good to install the anchors and allow normal operation of passing train.

Applicability Estimation of Ballast Non-exchange-type Quick-hardening Track Using a Layer Separation Pouring Method (층 분리주입을 이용한 도상자갈 무교환방식 급속경화궤도의 적용성 평가)

  • Lee, Il Wha;Jung, Young Ho;Lee, Min Soo
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.6
    • /
    • pp.543-551
    • /
    • 2015
  • Quick-hardening track (QHT) is a construction method which is used to change from old ballast track to concrete track. Sufficient time for construction is important, as the construction should be done during operational breaks at night. Most of the time is spent on exchanging the ballast layer. If it is possible to apply the ballast non-exchange type of quick-hardening track, it would be more effective to reduce the construction time and costs. In this paper, pouring materials with high permeability are suggested and a construction method involving a layer separation pouring process considering the void condition is introduced in order to develop ballast non-exchange type of QHT. The separate pouring method can secure the required strength because optimized materials are poured into the upper layer and the lower layer for each void ratio condition. To ensure this process, a rheology analysis was conducted on the design of the pouring materials according to aggregate size, the aggregate distribution, the void ratio, the void size, the tortuosity and the permeability. A polymer series was used as the pouring material of the lower layer to secure the void filling capacity and for adhesion to the fine-grained layer. In addition, magnesium-phosphate ceramic (MPC) was used as the pouring material of the upper layer to secure the void-filling capacity and for adhesion of the coarse-grained layer. As a result of a mechanics test of the materials, satisfactory performance corresponding to existing quick-hardening track was noted.

Evaluation of Flexural Strength of Wide Sleepers with Reinforcing Bars for Quick-Hardened Concrete Track (보강철근이 적용된 급속경화궤도용 광폭침목의 보유 휨 내력 평가)

  • Bae, Young-Hoon;Lee, Il-Wha
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.2
    • /
    • pp.702-709
    • /
    • 2018
  • A quick-hardened concrete track was developed to improve the aged ballasted track to a concrete track, and applied to earthworks and tunnels of main and urban railways. Rebars for reinforcement are not generally applied to prestressed concrete sleepers. On the other hand, many cracked sleepers have been observed in railroad sites. A wide sleeper, which is one of the main components of quick-hardened concrete track, should be structurally safe and crack-resistant in a ballasted and concrete track to avoid this problem. In particular, a wide sleeper manufactured by a post-tension method must have reinforcing bars applied to the rail-seat section. In this paper, static tests, dynamic tests, and fatigue tests were carried out to compare the flexural strength and crack resistance performance of a wide sleeper with and without reinforcing bars for a quick-hardened concrete track. As a result of the test, if some reinforcing bars are applied appropriately to the rail-seat section of a wide sleeper, it will be possible to prevent the occurrence of cracks, delay the expansion of the crack width, and the flexural fracture.