• Title/Summary/Keyword: 균열 조도

Search Result 252, Processing Time 0.028 seconds

An Experiment on Redundancy in Simple Span Two-Girder Bridge - Effects of Lateral Bracing (단경간 2-거더교의 여유도 평가 실험-수평브레이싱의 효과)

  • Park, Yong Myung;Joe, Woon Do Ji;Hwang, Min Oh;Lee, Dae Yong;Yoon, Tae Yang
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.3
    • /
    • pp.271-280
    • /
    • 2007
  • This paper presents the results of an experimental study to evaluate the redundancy in two plate-girder bridges, which are generally classified as non-redundant load path structures. The study was performed at a time when one of the two girders was damaged. The bottom lateral bracing was considered the experimental variable, and two 1/5-scale bridge specimens of simple span with and without a lateral bracing system were fabricated. Loading tests were first performed on the intact specimens without a cracked girder, within an elastic range. Thereafter, the ultimate loading tests were conducted on the damaged specimens with an induced crack at the center of a girder. The test results showed that the cross beams and the concrete deck redistributed some of the load to the uncracked girder, but the lateral bracing system played an important role in improving the redundancy during the damage and was also effective for load redistribution even when the bridge was intact.

Behaviors of Joints with Perfobond Rib Shear Connectors in Steel-PSC Hybrid System (Perfobond Rib을 적용한 강-PSC 혼합구조 연결부의 거동 평가)

  • Kim, Sang Hyo;Lee, Chan Goo;Yoon, Ji Hyun;Won, Jeong Hun
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.6
    • /
    • pp.647-657
    • /
    • 2009
  • This paper studies the behavior of joints in steel-PSC (prestressed concrete) hybrid beams, which is necessary for the application of hybrid beams to spliced girder bridges, and proposes a new type of joint with improved construction convenience and structural behavior. In the proposed joint, perfobond rib shear connectors are attached to the upper and lower plates, which are expanded from the steel girders and located between the steel girder and the PSC girder. The experimental tests were performed on hybrid beams with the suggested joint. The results showed that all the beams had similar ultimate strengths and failure modes, due to the failure of their PSC parts. The composite action of the perfobond ribs was verified by examining the initial stiffness and cracks of the test beams. In addition, the test beams showed a higher degree of ultimate strength than the beams with stud shear connectors in the joints that had been previously studied. Thus, the proposed joint is effective for the steel-PSC hybrid beam.

Fatigue Strength of In-plane Welded Attachments (면내 거셋 용접연결부의 피로강도)

  • Bae, Doobyong
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.6 s.67
    • /
    • pp.629-637
    • /
    • 2003
  • This s paper presented the results of the three phases of fatigue tests to determine the fatigue strength of in-plane welded gusset joints, which are the most common details inevitably existing in the region of high stress range. A total of 57 fatigue specimens with varying thickness and strengths were made and tensile fatigue tests performed. One full-scale beam fatigue test was also performed. The validity of the fatigue strength of those details in the specification was confirmed, with the effects of thickness of flanges and welded attachments, length of attachments, and strength of applied steel examined. The characteristics of crack initiation and propagation were also observed. The test result was evaluated by comparing it with other test data and fatigue criteria of other countries. To determine the degree of stress concentration in the weld toe depending on geometric configuration such as attachment length and transition radius, analyses were performed. Compared to the present specification, analytical results indicate the need to revise and subdivide the detail categories.

A Study on the Safety of Lifting Cable for Construction of Coastal Structures (항만건설을 위한 케이슨 들고리의 안전성에 관한 연구)

  • Kwak, Kae Hwan;Jang, Ki Woong;Kim, Jong Hyo
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.1 s.34
    • /
    • pp.85-99
    • /
    • 1998
  • This paper describes an experimental study to examine collapse causes of the lifting cable due to brittle failure of an fitting anchor under the lifting works. Also, in this study an collapse mechanism that was obtained from stress analysis was compared with an actual collapse procedure. Fractographical analysis as well as chemical component test, tension test and Charpy V-Notch impact test for the fractured steel members were carried out. And then, its results were compared with that of normal steel members. Circumferential surface flaws were developed at internal facets of the fitting anchor before tensile stress occurred. Hence, a higher stress than nominal stress was occurred at flaws by stress concentration at the crack tip. Also, stress intensity factor of members increased by crack size of the potential flaws. Because the stress intensity factor at the crack tip was greater than critical values(fracture toughness), brittle fracture occurred under the lifting works. It is judged that the main collapse of the lifting cable is due to brittle fracture of the fitting anchor.

  • PDF

Numerical Simulation for Evaluation the Feasibility of Using Sand and Gravel Contaminated by Heavy Metals for Dam Embankment Materials (중금속으로 오염된 사력재의 댐축조 재료 활용 가능성 평가를 위한 수치 모델링)

  • Suk, Hee-Jun;Seo, Min-Woo;Kim, Hyoung-Soo;Lee, Jeong-Min
    • Economic and Environmental Geology
    • /
    • v.40 no.2 s.183
    • /
    • pp.209-221
    • /
    • 2007
  • Numerical analysis was performed to investigate the effect of heavy metal contamination on neighboring environment in case a dam is constructed by using rockfill materials contaminated by heavy metals. The numerical simulation carried out in this research includes both subsurface flow and contaminant transport in the inside of the CFRD(Concrete Faced Rockfill Dam), using two commercial programs, SEEP2D and FEMWATER. The three representative cases of scenarios were chosen to consider a variety of cases occurring in a dam site; (1) Scenario 1 : no crack in the concrete face slab, (2) Scenario 2 : a crack In the upper part of face slab, and (3) Scenario 3 : a crack between plinth and face slab in the lower part of face slab. As a result of seepage analysis, the amount of seepage in scenario 2 was calculated as $14.31\sim14.924m^3/day$ per unit width, corresponding to the 1,000 times higher value than that in other scenarios. Also, in the simulation of contaminant transport by using FEMWATER, specified contaminant concentration of 13 ppb in main rockfill zone was set to consider continuous leakage from the rock materials. Through the analysis of contaminant transport, we found that elapsed times to take for the contaminant concentration of about 2 ppb to arrive at the end of a dam are as follows. Scenario 1 has the elapsed time of 55,000 years. In Scenario 2. it is 50 years. Finally, scenario 3 has 27,000 years. The rapid transport of the contaminant in scenario 2 was attributed to greater seepage flow by 500 times than other scenarios. Although, in case of upper crack in the face slab, it was identified that the contaminant might transport to the end of a dam within 100 years with about 2 ppb concentration, however, it happened that the contaminant was hardly transported out of the dam in other scenarios, which correspond to either no crack or a crack between plinth and face slab. In conclusion, the numerical analysis showed that the alternative usage of the contaminated sand and gravel as the dam embankment material can be one of the feasible methods with the assumption that the cracks in a face slab could be controlled adequately.

Comparative Performance Evaluation of Binarization Methods for Vehicle License Plate (자동차 번호판 이진화 방법에 대한 성능 비교)

  • Kim, Min-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.8
    • /
    • pp.9-17
    • /
    • 2009
  • License plate recognition is an active research area. but few comparative studies on license plate binarization have been conducted. Many related researchers have experienced similar trial and error for finding an effective binarization method. To reduce this trial and error, this study implemented some binarization methods and quantitatively compared the performance of the methods. The performance evaluation consists of a low level measure and a high level measure, so it can evaluate not only the quality of binarized image itself but also the usefulness of the result. The performance evaluation was separately performed with three groups of images so as to understand the properties of the binarization methods. Experimental results show that the quality of binarization is more dependent on the evenness of illumination than the intensity of illumination. The Otsu's method has acquired the most effective performance in the group of even illumination images and the Niblack's method with parameter correction has shown the best quality in the group of uneven illumination images.

An Analysis on the Structural Deterioration Properties of Timeworn Masonry Buildings in Metropolitan Area (대도시 지역의 노후 조적조 건축물의 구조 성능 열화 특성 분석)

  • Kwon, Ki-Hyuk;Lee, Kyoung-Yong;Yang, Hee-Suk
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.4
    • /
    • pp.181-189
    • /
    • 2003
  • Because of the gravitation of population toward large cities, a number of masonry buildings have been constructed since 1960. They have been rapidly deteriorated as time passed by. Therefore the purpose of this paper is to present basic data on timeworn masonry buildings which have been managed by metropolitan government and to analyse their deterioration factors. And then, the results of this paper can be used to establish the policy of managing timeworn masonry buildings. According to this study, the crack of masonry wall is the most effective deterioration factor and timeworn masonry buildings have a problem with foundation. The structure grade have an interrelation with occupancy type more than building age. Also, the longer building age becomes, the sooner deterioration speeds. A timeworn masonry building is in urgent need of reinforcement on a thirty-year period of building age.

Petrographic Characteristics and Deterioration Evaluation of the Rock-carved Seated Buddha at Bugmireugam Hermitage in Daeheungsa Temple of Haenam, Korea (해남 대흥사 북미륵암 마애여래좌상의 암석기재적 특성과 손상도 평가)

  • Cho, Ji Hyun;Lee, Chan Hee
    • Economic and Environmental Geology
    • /
    • v.52 no.6
    • /
    • pp.617-626
    • /
    • 2019
  • In this study, we investigated the petrographic characteristics and physical property of the Rock-carved Seated Buddha at Bugmireugam hermitage of Daeheungsa temple in Haenam. The Buddha Statue was carved on micrographic granite, and the rock was composed of the fine quartz encircled by orthoclase. The results of diagnosis for deterioration evaluation have shown a highly damage rate of black contaminants (8.4%) and crack index (6.6). The ultrasonic velocity have detected SW (slightly weathered) grade of weathering coefficient (mean 0.18). Various weathering factor on the surface of the Buddha Statue was affected by precious shelter, and physical property with ultrasonic was directly influenced by the structural characteristics and fissure of host rock.

A Study on a Relationship Between the Surface Roughness of Fracture CT Specimen Broken by Fatigue Crack Growth and the Moments (피로균열성장에 의해 파단된 CT시험편의 표면조도와 모멘트의 관계에 관한 연구)

  • Kim, Kyun-Suk;Jung, Hyun-Chul;Kim, Kyung-Su;Park, Chan-Joo;Jang, Hos-Seob
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.19 no.4
    • /
    • pp.462-468
    • /
    • 2010
  • Fatigue crack growth caused by surface defects is one of the most important subjects for the evaluation and the assurance of safety in pressure vessels, piping systems, LPG/LNG fuel tank and other various structures. So, this paper aims to investigate the relationship between the surface roughness of fracture CT specimens and the moments on the specimen when doing fatigue test for the evaluation and the assurance of safety of structures from fatigue crack deconstruction. In this experiment, the CT specimens were loaded by a fatigue testing machine with changing loads until they are broken. The surface roughness of the fracture CT specimens was measured using 3D precise shape measuring equipment and digital holography. As a result of this study, It was identified that the average roughnesses are similar at the positions that has a same moments by comparing the results with the moments on the specimen according to the position.

A Study on Notch Bit System for Controlling Blast Vibration and Over-break in Rock Mass (발파공해 해소 및 여굴 최소화를 위한 선균열 암굴착 노치장비 개발에 관한 연구)

  • Jeong, Dong-Ho;Moon, Sang-Jo;An, Dae-Jin;Jeong, Won-Joon;Kim, Eun-Kwan;Kim, Dong-Gyou
    • Tunnel and Underground Space
    • /
    • v.17 no.3 s.68
    • /
    • pp.216-224
    • /
    • 2007
  • Blasting, using shock and dynamic energy of explosive, is very effective tunnel excavation method. But it had serious problem which is the blast vibration and over-break. In recent study, pre-cracked excavation method using notch hole reduced blast vibration and over-break in tunnel, so we performed study about developing notch bit system for making notch hole. In order to make notch hole effectively we had perform drilling experiments changing length and height of notch and in order to improve speed and precision of drilling we had developed notch bit system which consists of drilling bit, notch bit, adapter and notch guide.