• Title/Summary/Keyword: 균열정지대

Search Result 5, Processing Time 0.025 seconds

Crack Growth Analysis and Crack Arrest Design of Stiffened Panels(III) - Experimental Evaluation of Crack Arrest Design Chart (보강판의 균열거동해석과 Crack Arrest 설계(III) - Crack Arrest Design 차트의 실험평가)

  • Rhee, Eui-Jong;Rhee, Hwan-Woo
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.5 no.2
    • /
    • pp.42-48
    • /
    • 2006
  • In order to assess the validity of fatigue crack arrest design charts obtained from our previous numerical approach to fatigue crack arrest condition, an extensive fatigue crack growth/arrest test was performed using CT-type integrally stiffened panels. The results are presented as fatigue crack growth rate and non-dimensional crack length relationship, and these are compared with numerically simulated crack growth rates. The measured values of da/dN at the moment of fatigue crack arrest occurred in stiffened panels are good agreement with those numerically simulated crack growth rates.

  • PDF

Concrete-Panel Retaining Wall anti-crack sleeve inserted (균열방지 슬리브가 매설된 패널식 옹벽)

  • Jang, Sung-Ho;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.345-349
    • /
    • 2019
  • In Korea, the mountainous area occupies more than 70% of the whole country, cutting of earth slope that cuts a part of the ground surface is widely used when building infrastructures such as road, railroad, and industrial complex construction. In recent years, regulations on environmental damage have become more strict, and various methods have been developed and applied. Among them, Concrete-Panel Retaining Wall technique is actively applied. Concrete-Panel Retaining Wall is a method to resist horizontal earth pressure by forming a wall by attaching a precast retaining wall to the front of the support material and increasing the shear strength of the disk through reinforcement of the support material. Soil nailing, earth bolt, and ground anchor are used as support material. Among them, ground anchor is a more aggressive reinforcement type that introduces tensile load in advance to the steel wire, and a large concentrated load acts on the front panel. This concentrated load is a factor that creates cracks in the concrete panel and reduces the durability of the retaining wall itself. In this study, steel pipe sleeves and reinforcements were purchased at the anchorage of the panel to prevent cracks, and by applying bumpy shear keys to the end of the panel, the weakness of the individual behavior of the existing grout anchors was improved. The problem of degraded landscape by exposure to front concrete of retaining wall and protrusion of anchorage was solved by the production of natural stone patterns and the construction of sections that do not protrude the anchorage. In order to verify the effectiveness of anti-crack sleeves and reinforcements used in the null, indoor testing and three-dimensional numerical analysis have been performed, and the use of steel pipe sleeves and reinforcements has demonstrated the overall strength increase and crack suppression effect of panels.

A Study on Dynamic Characteristics of Hybrid Pedestrian Cable Stayed Bridge by Impact Hammer Test (충격해머실험에 의한 하이브리드 보도사장교의 동특성에 관한 연구)

  • Chin, Won Jong;Kim, Young Jin;Choi, Eun Suk;Lee, Jungwhee
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.166-166
    • /
    • 2011
  • 한국건설기술연구원내에 세계 최초로 UHPC(초고성능 콘크리트)를 활용한 보도사장교를 설계 및 시공하여 공용중이다. 초고성능 콘크리트(UHPC, Ultra High Performance Concrete)는 기존의 콘크리트의 단점을 극복하기 위하여 강섬유 및 혼화재료를 사용하여 고강도화와 더불어 인장강도, 휨강도, 균열에 대한 저항성, 전단강도 및 내충격성을 대폭 개선시켜서 구조부재의 연성 및 강도를 확보하기 위해 개발된 것으로서 한국건설기술연구원이 독자적 연구를 바탕으로 UHPC를 개발하였고, KICT-UHPC의 특성을 충분히 반영한 보도사장교를 한국건설기술원내에 실구조물로 시공하였다. 한국건설기술연구원내 본관 1, 2동 연결 보도사장교(SUPER BRIDGE 1)의 진동실험을 통해 UHPC 보도사장교의 동특성(고유진동수 및 모드형상)을 평가하였다. 대상교량에는 보도사장교의 캔틸레버 구조 특성에 의해 발생하는 진동을 제어하기 위한 질량 264kg의 난간형 수직진동제어장치(TMD) 4대가 설치되어 있으며, 부가질량의 운동을 기계적으로 구속하거나 구속을 해제하여 TMD의 작동을 켜거나 끌 수 있도록 되어있다. TMD의 가동 및 정지시 동특성을 비교하는 정밀한 검증 실험을 통하여 TMD 설치에 의한 동특성의 변화도 평가하였다. 가진망치에 의한 충격실험으로부터 획득한 가속도 시간이력 데이터와 가진망치의 가진력 시간이력 데이터를 사용하여 주파수응답함수(FRF, frequency response function)를 계산하고, 이로부터 Super Bridge I의 동적모드형상과 고유진동수를 추출하였다. 1차 모드의 고유진동수는 TMD 정지시 2.2949 Hz, TMD 작동시 2.0996 Hz로서 8%정도 감소하였다. 충격해머에 의한 가진 실험을 통해 세계 최초로 시공한 UHPC 보도사장교의 진동특성과 관련한 신뢰성 있는 자료를 확보할 수 있었다.

  • PDF

A Study on the installation time and method of soundproofing facilities according to a Tunnel blasting work. (터널발파작업에 따른 방음시설의 설치시기와 방법에 대한 고찰.)

  • Won, Yeon-Ho;Son, Young-Bok;Jeong, Jai-Hyung
    • Proceedings of the KSEE Conference
    • /
    • 2006.10a
    • /
    • pp.119-140
    • /
    • 2006
  • The rock excavation work by doing blasting breaks the rock by using a shock pressure and gas pressure produced when explosive explodes and the shock wave by shock pressure propagated three-dimensionally from the exploding center is on the decrease notably to the distance, however, $0.5{\sim}20%$ of energy produced by blasting propagates into the ground outside a crack zone by the shape of an elastic wave, on the ground it appears as a ground vibration with a seismic amplitude and a seismic cycle, it is called a blasting vibration. on the other side, what propagated in the air is called a blasting sound. The blasting sound of both means the things which the shock sound within the range the audible frequency($20{\sim}20000Hz$) of the elastic wave in the air influences the response system of a human body, it doesn't harm physically to any structures but influences unreasonably a work accomplishment, such as a work discontinuance due to the outbreak of a public complaint by a mental pain, reduction of a blasting scale, etc.. So, this study is examined at about 20 sites on the installation time and method of soundproofing facilities for reduction of the sound accompanied with a tunnel blasting work.

  • PDF

A Study on Efficient Deconstruction of Supporters with Response Ratio (응답비를 고려한 효율적인 버팀보 해체방안에 관한연구)

  • Choi, Jung-Youl;Park, Sang-Wook;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.5
    • /
    • pp.469-475
    • /
    • 2022
  • As the recent structure construction is constructed as a large-scale and deep underground excavation in close proximity to the building, the installation of retaining wall and supporters (Struts) has become complicated, and the number of supporters to avoid interference of the structural slab has increased. This construction process becomes a factor that causes an increase in construction joints of a structure, leakage and an increase in wall cracks. In addition, this reduced the durability and workability of the structure and led to an increase in the construction period. This study planned to dismantle the two struts simultaneously as a plan to reduce the construction joints, and corrected the earth pressure by assuming the reaction force value by the initial earth pressure and the measured data as the response ratio. After recalculating the corrected earth pressure through the iterative trial method, it was verified by numerical analysis that simultaneous disassembly of the two struts was possible. As a result of numerical analysis applying the final corrected earth pressure, the measured value for the design reaction force was found to be up to 197%. It was analyzed that this was due to the effect of grouting on the ground and some underestimation of the ground characteristics during design. Based on the result of calculating the corrected earth pressure in consideration of the response ratio performed in this study, it was proved analytically that the improvement of the brace dismantling process is possible. In addition, it was considered that the overall construction period could be shortened by reducing cracks due to leakage and improving workability by reducing construction joints. However, to apply the proposed method of this study, it is judged that sufficient estimations are necessary as there are differences in ground conditions, temporary facilities, and reinforcement methods for each site.