• Title/Summary/Keyword: 궤도틀림

Search Result 109, Processing Time 0.029 seconds

Performance Test of Wall to Wall Modular Structure Joint for Near-surface Transit (저심도 모듈식 구조체의 벽체간 연결 조인트 성능검증 실험)

  • Lee, Jong Soon;Kim, Hee Sung;Lee, Sung Hyung;Lee, Jun Kyoung
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.3
    • /
    • pp.261-269
    • /
    • 2015
  • To overcome the weaknesses of viaduct bridges and the non-economic efficiency of underground LRT, the study of near-surface railway systems is in progress. To apply a box structure to the low depth transit, a connection joint to precast modules are very important when applying precast modular structures to replace temporary structures. In this study, wall to wall connections were applied in diverse cases such as rebar connections, guiding structures that were used to fit the verticality of precast walls during construction, and non-reinforcement structures used only for waterstop. Experimental performance verification was carried out for the bending, shear and splitting of the wall to wall connection. Precision of construction joints between wall to wall was identified as a factor that influenced the structural performance of the precast wall. A structure that can serve as a guide during the vertical insertion of a wall is confirmed for the most suitable case, but it will be necessary to modify this structure for detailed cases.

An Estimate of Ballast Track Condition on Dynamic Behavior of Railway Bridge (철도교량의 동적거동 특성을 고려한 자갈도상궤도의 상태추정에 관한 연구)

  • Kweon, Oh-Soon;Choi, Jung-Youl;Kang, Myoung-Seok;Lee, Hee-Up;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.480-493
    • /
    • 2007
  • Many railway-advanced countries are using the various types of track to reduce the track maintenance and repair cost according to the improvement of velocity. It spends on much maintenance and repair cost for ballast track due to abrasion of ballast, track irregularity and unisotropical ballast-support stiffness. The ballast track on railway bridge is accelerating the deterioration of ballast according to interaction of railway bridge and track. As continuing the deterioration, it is caused dynamic loads. Due to these effects, it increases negative loads of track and bridge. However, when designing the railway bridge, the effect of ballast track was applicate only dead load, so elastic behavior effect of ballast track is not influenced. Therefore, this paper presumes the stiffness of ballast track on railway bridge considering dynamic behavior of railway bridge, it was evaluated that effect on dynamic behaviors of railway bridge according to ballast track stiffness.

  • PDF

A Study on the Dynamic Behavior of the High Speed Railway Tracks (고속철도(高速鐵道)의 궤도(軌道)에 대한 동특성(動特性) 연구(研究))

  • Moon, Je Kil;Kang, Kee Dong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.1
    • /
    • pp.97-105
    • /
    • 1992
  • The purpose of this study is to provide the cause and countermeasure for track problems in the high speed railways due to the irregularly increasing dynamic wheel loads running over the speed range of 300 km/h. It has long been recognised that the track problems encountered on high speed railways are associated mainly with vertical dynamic loads which are related to the unsprung mass of vehicles and track irregularities. In addition to these parameters for the estimation of the dynamic wheel load variation, however, the dynamic characteristics of track structures are discussed in this paper with reference to mathematical modelling of the tracks and vehicle. From the results of the more detailed analyses, the effects of track stiffness and damping characteristics are considered to be significant for reducing the dynamic wheel loads. To make this point clear and appraise the overall performance of the track components, the theoretical analysis on the dynamic behavior of the tracks and wheel set impact tests on several track structures are performed. The experimental results from different track components are compared with each other. The track stiffness and damping characteristics are also presented quantatively.

  • PDF

Applicability Estimation of Ballast Non-exchange-type Quick-hardening Track Using a Layer Separation Pouring Method (층 분리주입을 이용한 도상자갈 무교환방식 급속경화궤도의 적용성 평가)

  • Lee, Il Wha;Jung, Young Ho;Lee, Min Soo
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.6
    • /
    • pp.543-551
    • /
    • 2015
  • Quick-hardening track (QHT) is a construction method which is used to change from old ballast track to concrete track. Sufficient time for construction is important, as the construction should be done during operational breaks at night. Most of the time is spent on exchanging the ballast layer. If it is possible to apply the ballast non-exchange type of quick-hardening track, it would be more effective to reduce the construction time and costs. In this paper, pouring materials with high permeability are suggested and a construction method involving a layer separation pouring process considering the void condition is introduced in order to develop ballast non-exchange type of QHT. The separate pouring method can secure the required strength because optimized materials are poured into the upper layer and the lower layer for each void ratio condition. To ensure this process, a rheology analysis was conducted on the design of the pouring materials according to aggregate size, the aggregate distribution, the void ratio, the void size, the tortuosity and the permeability. A polymer series was used as the pouring material of the lower layer to secure the void filling capacity and for adhesion to the fine-grained layer. In addition, magnesium-phosphate ceramic (MPC) was used as the pouring material of the upper layer to secure the void-filling capacity and for adhesion of the coarse-grained layer. As a result of a mechanics test of the materials, satisfactory performance corresponding to existing quick-hardening track was noted.

Application of Recursive Least Squares Method to Estimate Rail Irregularities from an Inertial Measurement Unit on a Bogie (대차 관성측정 장치에서 궤도틀림 추정을 위한 반복 최소자승법의 적용)

  • Lee, Jun-Seok;Choi, Sung-Hoon;Kim, Sang-Soo;Park, Choon-Soo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.427-434
    • /
    • 2011
  • This paper is focused on application of recursive least squares method to estimate rail irregularities from the acceleration measurement on an axle-box or a bogie for the rail condition monitoring with in-service high-speed trains. Generally, the rail condition was monitored by a special railway inspection vehicle but the monitoring method needs an expensive measurement system. A monitoring method using accelerometers on an axle-box or a bogie was already proposed in the previous study, and the displacement was successfully estimated from the acceleration data by using Kalman and frequency selective band-pass filters. However, it was found that the displacement included not only the rail irregularities but also phase delay of the applied filters, and effect of suspension of the bogie and conicity of the wheel. To identify the rail irregularities from the estimated displacement, a compensation filter method is proposed. The compensation filters are derived by using recursive least squares method with the estimated displacement as input and the measured rail irregularity as output. The estimated rail irregularities are compared with the true rail irregularity data from the rail inspection system. From the comparison, the proposed method is a useful tool for the measurement of lateral and vertical rail irregularity.

  • PDF

Development of models for measuring track irregularities using accelerometers (가속도계를 이용한 궤도틀림 측정용 모델의 개발)

  • Lee, Jun-Seok;Choi, Sung-Hoon;Kim, Sang-Soo;Kim, Seog-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.303-310
    • /
    • 2011
  • This paper is focused on development of models for measuring lateral and vertical track irregularities from corresponding accelerometers of an in-service high-speed train. Generally, the track irregularity was measured by a special railway inspection vehicle or system with contact or non-contact sensors. However, the sensors are very expensive and vulnerable to a harsh environment. Displacement estimation from an inertial measurement unit and its wave-band filtering was already developed in the previous study, and it was found that their results included not only the track irregularities but also other information such as phase delay of the applied filters, and suspension and conicity of the wheel. To identify the track irregularities from those results, a compensation filtering method was proposed. Each directional compensation filter was derived by using a system identification method with the estimated directional displacement as input and the corresponding track irregularities as output. In this paper, they are integrated into a model for each direction and applied to the measured lateral and vertical acceleration data from the axle-box and bogie of an in-service high-speed train. Their results are compared with the data from the track geometry measurement system. From the comparison, the proposed models are a useful tool for the measurement of the track irregularities using accelerometers of in-service high-speed trains.

  • PDF

The Effect of the ZLR and Tied Sleeper to Reduce the Track Irregularity in the Bridge Expansion Joint Zone (교량신축부에서의 궤도틀림 저감을 위한 활동체결구 및 침목결속 효과)

  • Kang, Tae-Ku;Min, Kyung-Ju;Lim, Nam-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2405-2408
    • /
    • 2011
  • In recent time, the cause analysis and the reduction of the track irregularity have become the most important issue in the ballasted track on the high-speed railway bridge. This is because that the frequency of the maintenance work at the bridge expansion joint zone is on the rise. The track irregularity on the railway bridge starts at the end of the bridge-deck and spreads along the bridge. Due to the dynamic vibration and the thermal expansion of the bridge, the compaction of the ballast gravel on the bridge expansion joint zone become loose and then the progress of the track irregularity result from the train-induced dynamic impact is accelerating further. Among the several options for reducing the track irregularity on the bridge expansion joint zone, the application and efficiency of the zero longitudinal restraint(ZLR) and tied sleeper are investigated in this paper. Field test construction has been conducted, then the progress of the track irregularity and the frequency of the maintenance work are analyzed before and after the filed test construction. Of the two methods, it is shown that the installation of the ZLR seems to be better than the tied sleeper.

  • PDF

A Study on Identification of Track Irregularity of High Speed Railway Track Using an SVM (SVM을 이용한 고속철도 궤도틀림 식별에 관한 연구)

  • Kim, Ki-Dong;Hwang, Soon-Hyun
    • Journal of Industrial Technology
    • /
    • v.33 no.A
    • /
    • pp.31-39
    • /
    • 2013
  • There are two methods to make a distinction of deterioration of high-speed railway track. One is that an administrator checks for each attribute value of track induction data represented in graph and determines whether maintenance is needed or not. The other is that an administrator checks for monthly trend of attribute value of the corresponding section and determines whether maintenance is needed or not. But these methods have a weak point that it takes longer times to make decisions as the amount of track induction data increases. As a field of artificial intelligence, the method that a computer makes a distinction of deterioration of high-speed railway track automatically is based on machine learning. Types of machine learning algorism are classified into four type: supervised learning, unsupervised learning, semi-supervised learning, and reinforcement learning. This research uses supervised learning that analogizes a separating function form training data. The method suggested in this research uses SVM classifier which is a main type of supervised learning and shows higher efficiency binary classification problem. and it grasps the difference between two groups of data and makes a distinction of deterioration of high-speed railway track.

  • PDF

Development of Permanent Deformation Prediction Model for Trackbed Foundation Materials based on Shear Strength Parameters (강화노반 쇄석재료의 전단강도특성을 고려한 영구변형예측모델 개발)

  • Lim, Yujin;Hwang, Jungkyu;Cho, Hojin
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.623-630
    • /
    • 2012
  • Formation used as trackbed foundation for providing vertical bearing capacity onto rail foundation are composed of crushed stones usually with certain type of grain size distribution. Permanent deformation in trackbed foundation can be generated by increasing number of load repetition due to train traffic increases, causing track irregularity. In this study, a specially prepared trackbed foundation materials (M-40) used in Korea has been tested using a large repetitive triaxial compression apparatus in order to understand resilient and permanent deformation characteristics of the material. From these test results, resilient and permanent deformation characteristic are analyzed so that a permanent deformation model is developed which can consider number of load repetition N, confining stress (${\sigma}_3$), shear stress ratio(${\tau}/{\tau}_f$) and stiffness of the material.

A Correlation Analysis on Earth Pressure and Subgrade Stiffness in Bridge Abutment Transition Zone (철도 교량접속부의 토압과 노반강도와의 상관관계)

  • Kim, Jin-Hwan;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.647-655
    • /
    • 2016
  • The construction of high speed railways and improvement projects of for conventional railways require straight railway lines of railway, which leads to an increase of bridge and tunnel construction. Transition zones in railways means that the track support stiffness is variedvaries in over short ranges. Sspecial attention is required in theose transition zones since because instability of train running in train and irregularities of track irregularities are can frequently occurred. Typical transition zones are between bridges and earthworks and between tunnels and earthworks. On In a transition zone, a bridge abutment transition zone has many problems in with various causes. In this paper, fundamental problems of bridge abutment transition zones is are analyzed to enhance the understanding about of bridge abutment transition zones. Suggestions for improving problems in the transition zones are proposed.