• Title/Summary/Keyword: 교통법규

Search Result 132, Processing Time 0.02 seconds

Problems Analysis and Revitalization Plan of Urban Development Projects by the Land Readjustment Method (환지방식에 의한 도시개발사업의 문제분석 및 활성화대책)

  • Kim, Hyoung-Soo;Lee, Young-Dai;Lee, Jun-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.37-46
    • /
    • 2009
  • This research will focus on the public agencies, designers, supervisors, building cooperation, and contractor who involved in urban development plan. By understanding the complexity and the priorities in urban development process, all problems of the urban development projects can be solved or improved. These priorities are specified using AHP (Analytic Hierarchy Process). A questionnaire survey is employed to identify the problems of urban development process and the methods of revitalizing urban in this research. Through the survey, 35 issues are drawn out. Factor analysis technique is applied to extract the underlying interrelationships possibly existing. Using latent root criterion and varimax rotation method, 9 factors are extracted(by using 34 issues after deleting 1 issue less than 0.4 of factor loading) These 9 factors named as PIF (Problem Improvement Factor) consist of integration estimation (PIF1), cooperation operation capability (PIF2), contractor corporation capability (PIF3), capital for infrastructure investment (PIF4), misunderstanding of effective land use (PIF5), financial capability (PIF6), obscure goal of project (PIF7), shortage of cooperation expertise (PIFS), administrative procedures (PIF9). PIF 6 is the most important factor and PIF 1 is the most widely effective factor to succeed urban land development projects. It is recognized that administrative office is most responsible for PIF1 cooperation is most responsible for PIF2, 7, 8 and 9; contractors is most responsible for PIF3 and PIF6; administrative agencies is most responsible for PIF4; cooperation and consultants are responsible for PIF5. From findings in this study, some suggestions are proposed for the revitalization methods of urban development projects through the land readjustment method.

Evolution of Aviation Safety Regulations to cope with the concept of data-driven rulemaking - Safety Management System & Fatigue Risk Management System

  • Lee, Gun-Young
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.33 no.2
    • /
    • pp.345-366
    • /
    • 2018
  • Article 37 of the International Convention on Civil Aviation requires that rules should be adopted to keep in compliance with international standards and recommended practices established by ICAO. As SARPs are revised annually, each ICAO Member State needs to reflect the new content in its national aviation Acts in a timely manner. In recent years, data-driven international standards have been developed because of the important roles of aviation safety data and information-based legislation in accident prevention based on human factors. The Safety Management System and crew Fatigue Risk Management Systems were reviewed as examples of the result of data-driven rulemaking. The safety management system was adopted in 2013 with the introduction of Annex 19 and Chapter 5 of the relevant manual describes safety data collection and analysis systems. Through analysis of safety data and information, decision makers can make informed data-driven decisions. The Republic of Korea introduced Safety Management System in accordance with Article 58 of the Aviation Safety Act for all airlines, maintenance companies, and airport corporations. To support the SMS, both mandatory reporting and voluntary safety reporting systems need to be in place. Up until now, the standard of administrative penal dispensation for violations of the safety management system has been very weak. Various regulations have been developed and implemented in the United States and Europe for the proper legislation of the safety management system. In the wake of the crash of the Colgan aircraft, the US Aviation Safety Committee recommended the US Federal Aviation Administration to establish a system that can identify and manage pilot fatigue hazards. In 2010, a notice of proposed rulemaking was issued by the Federal Aviation Administration and in 2011, the final rule was passed. The legislation was applied to help differentiate risk based on flight according to factors such as the pilot's duty starting time, the availability of the auxiliary crew, and the class of the rest facility. Numerous amounts data and information were analyzed during the rulemaking process, and reflected in the resultant regulations. A cost-benefit analysis, based on the data of the previous 10 year period, was conducted before the final legislation was reached and it was concluded that the cost benefits are positive. The Republic of Korea also currently has a clause on aviation safety legislation related to crew fatigue risk, where an airline can choose either to conform to the traditional flight time limitation standard or fatigue risk management system. In the United States, specifically for the purpose of data-driven rulemaking, the Airline Rulemaking Committee was formed, and operates in this capacity. Considering the advantageous results of the ARC in the US, and the D4S in Europe, this is a system that should definitely be introduced in Korea as well. A cost-benefit analysis is necessary, and can serve to strengthen the resulting legislation. In order to improve the effectiveness of data-based legislation, it is necessary to have reinforcement of experts and through them prepare a more detailed checklist of relevant variables.