Parallel Operation Characteristics of Utility Interactive Photovoltaic System and Revolving Field Type Synchronous Generator (계통연계 태양광발전시스템과 회전계자형 동기발전기의 병렬운전 특성)

  • Ryu, Yeon-Soo;Yoo, Wang-Jin;Lee, Checl-Gyu;Moon, Jong-Beom
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2008.04a
    • /
    • pp.43-48
    • /
    • 2008
  • Through simulations and field experiment on A.C. parallel operation of both Utility Interactive Photovoltaic System and Diesel Engine Revolving Field Type Synchronous Generator, following factors have been found. First, the inverter should be operated in three modes of frequency(mode.1: ${\pm}$0.3Hz, mode.2: ${\pm}$1Hz, mode.3: ${\pm}$2Hz) as default, considering properties of operating Synchronous Generator. Second, as a result of supplying 13.5kW of residual power, it has been found that Synchronous Generator takes the power input only as reactive power, because it was electrically stable with frequency of 60.14Hz and high voltage of 222.3V even when power factor was -0.94. Besides, it was mechanically stable, too, because the quake, noise, and temperature of Synchronous Generator in this case were 7.5mm/s, 97dB, and $6^{\circ}C$ respectively, which were lower than normal load connection of 145.6kW; 11.03mm/s. Thus, load share of Revolving Field Type Synchronous Generator reduces according to the supply of Photovoltaic System to the load power. In this experiment, 200kW of Synchronous Generator and 40kW of Photovoltaic System were operated in parallel. The load share was 20% in maximum. and 11.1lit/hr of fuel was saved.

  • PDF

A Study on the Controlling Method of Hunting Inducing Point during Parallel Running of alternator Equipped with converter (컨버터가 내장된 교류발전기 병렬운전중의 헌팅 억제에 관한 연구)

  • 노창주
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.23 no.3
    • /
    • pp.346-351
    • /
    • 1999
  • This paper is a research for removing the hunting which came about during the parallel running of the alternators which four-pole six-phase have the converter with twelve diodes to rectify all the waves. Druing the parallel running the hunting came about under the period of 0.2-0.3{sec} not when it's load was the resistance but the capacity at the rpm band 1575[rpm] 1690[rpm] This hunting in our judgement was not come about from the general hunting causes which have been already known to but the special example. And so we checked that the hunting came about or not as per the changes of the rpm exciting current load current and converter and converter output voltage and the following facts were revealed. -The hunting occured during the constant voltage charging where r. p. m band is from 1575[rpm] to 1690[rpm] - The hunting did not came about during the constant power charging in which there was the large difference between the converter output voltage and the battery voltage. -The hunting did not came about in the low rpm band. We could see from the above facts that the existence of the hunting inducing point at the con-stant voltage charging band was the direct cause of the hunting. After trying every possible means to remove the hunting inducing point we could know that the modification of the synchronous generator is suitable for he purpos in view of the small engine room.

  • PDF

A Study on the Characteristics of HTS Magnet System with Respect to Winding Method and the Applicable Technology for High Field Magnet (권선형태에 따른 초전도 마그네트 시스템 특성 및 고자장 적용 기술에 관한 연구)

  • Yang, Seong-Eun;Ko, Tae-Kuk
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1288-1289
    • /
    • 2011
  • 세계가 점차적으로 "전화(電化)"됨에 따라 전기 에너지의 효과적인 분배와 사용이 급격히 중요하게 되었다. 일반 도체를 통한 전류의 흐름은 도체의 저항에 의해 줄열을 발생시켜 전기 에너지의 손실을 일으키고 결국은 에너지와 경제적 자원의 낭비를 초래하게 된다. 초전도체의 저항은 직류 전류에서는 0, 교류 전류에서는 거의 0이기 때문에 초전도체를 이용하면 전력 소자 및 기기의 부피와 무게를 현저히 줄일 수 있는 반면에 모든 전기 시스템의 효율을 향상시킬 수 있고, 에너지 사용의 절감에 따라 환경 문제에 도움을 줄 수 있다. 사고 전류 제한기의 설계에 있어서, 권선형태에 따른 솔레노이드 마그네트와 팬케이크 마그네트를 설계, 제작하여 자장 특성 및 한류 특성을 비교 하였다. 2세대 고온 초전도 선재로 불리는 YBCO 박막형 초전도 선재를 이용하여 동작 전류 증대를 위한 다병렬 솔레노이드 마그네트와 다병렬 팬케이크 마그네트를 제작하였다. 이를 이용하여 440 V/ 630 A급 초전도 사고 전류 제한기와 2 kA 급 대전류 통전 사고 전류 제한 모듈을 설계, 제작하여 단락 특성 시험을 수행하였다. 한편, 자장 응용 기기에 적용 가능한 더블 팬케이크 마그네트를 제 2 세대 초전도선재를 이용하여 설계, 시작하였다. 2세대 선재는 1세대 선재에 비하여 20 T 이상의 외부 자장에 대한 특성이 우수하여 고자장 마그네트 시스템에 더욱 적합하다. 이에 초전도 마그네트 보호를 위한 상전도 영역 전파 실험을 수행하여 CC 선재의 안정도를 측정하였다. 또한 영구전류모드 운전과 플럭스 펌프를 통한 전류 충전에 대한 연구도 병행하였다.

  • PDF

A Study on the Transient Phenomenon Analysis at the instant of Parallel Running for A.C. Generators (교류발전기 병렬운전시 과도현상 해석에 관한 연구)

  • 오세진;김현수;김성환
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.25 no.5
    • /
    • pp.1065-1075
    • /
    • 2001
  • It is common knowledge amongst electrical and marine engineers that short-circuit in electrical system may cause large mechanical torque on generator and prime mover However, it is not so widely known that the faulty synchronizing of generators may cause even higher torques than that of short-circuit. In this study, the transient phenomena related to the parallel running of synchronous generators are analyzed and the exact computer simulation method is proposed. In result, maximum transient torque and current take place in case of $120^{\circ}$ voltage angle difference between Master and Slave and that may develop higher torque than the short-circuit according to a condition of synchronizing. When synchronizing in power system using only two generators higher torque and current occur Master, but using multimachine system those occur to Slave. The short-circuit of marine generator does not happen frequently but faulty synchronizing sometimes takes place, therefore, it is necessary for designers to consider these phenomena.

  • PDF

Development of 100[kW] Decentralized Control-Based Modular ESS for DC distribution system (DC 급전용 100[kW]급 분산 제어기반 모듈형 ESS 개발)

  • Yoon, Yeo-Young;Kim, Hong-Sung;Jeong, Jae-Kee
    • Proceedings of the KIPE Conference
    • /
    • 2011.07a
    • /
    • pp.502-503
    • /
    • 2011
  • 최근 환경 문제 및 화석 에너지의 고갈과 맞물려 신재생 에너지를 사용하는 DC 출력형 분산전원 시스템이 증가 일로에 있으며, 이에 따라 교류 급전시스템보다 에너지 변환 효율이 높은 직류 급전 시스템에 대한 연구개발이 활발히 이뤄지고 있다. 본 논문에서는 유지 보수의 용이성을 확보한 Hot Swap 구조형식의 DC 급전용 100[kW]급 분산 제어기반 모듈형 ESS[Energy Storage System의 개발에 관한 것이다. 실제 33[kW]급 모듈 3대로 구성된 100[kW]급 시스템을 제작하여 전압제어 실험, 병렬운전실험 및 Hot Swap 안정성 실험 등을 수행하였다.

  • PDF

A Study on Double Converter for Urban Transit Power Supply (도시철도 전력공급용 더블컨버터에 관한 연구)

  • Jang, Choon-Seok;Kim, Sung-An;Kim, Hwan-Jin;Han, Gap-Jin;Cho, Yun-Hyun
    • Proceedings of the KIPE Conference
    • /
    • 2015.11a
    • /
    • pp.223-224
    • /
    • 2015
  • 도시철도에서 사용하는 전력공급 장치는 대부분 다이오드를 이용하여 전차선(DC)에 공급하고 있으며, 다이오드 특성상 단방향 전력공급이 가능하기 때문에 전동차의 회생제동으로 발생하는 회생 전력을 재사용 할 수 없는 단점을 가지고 있다. 따라서 본 논문에서는 전동차에서 발생하는 회생전력을 교류 모선으로 환원시켜주기 위하여 사이리스터를 이용한 양방향 더블컨버터를 제안한다. 더블컨버터의 제어 목적은 전차선의 부하에 따라 전압을 일정하게 유지시키면서 부하 조건에 따라 안정적인 모드 전환을 하는 것이다. 이를 위하여 더블컨버터의 병렬로 운전을 통하여 순차적인 모드 전환을 위한 알고리즘을 더블컨버터 시뮬레이션을 적용하여 검증하였다.

  • PDF

A Study on the Removing Method of Hunting by Equalizing Line during Parallel Running of alternator Equipped with converter (컨버터가 내장된 교류발전기 병렬운전중의 헌팅을 균압선을 이용해 제거하는 방법에 관한 연구)

  • 노창주
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.23 no.3
    • /
    • pp.352-359
    • /
    • 1999
  • This paper is a research for removing the alternators hunting which came about during the par-allel running. The four-pole six-phase alternator is equipped with the converter made out of twelve diodes to rectify all the waves. The hunting came about during the battery charging due to the hunting inducing point existed in r. p. m band 1575[rpm-1690[rpm] To remove the hunting inducing point We modified the four-pole six-phase alternator into the four-pole twevel-phase and increased the short-circuit ratio by decreasing the field coil pitch and increasing the field coil turns. But this method has two defects the first the alternator structure becomes complicating and the second the second the alternator equipped with the converter used in general purpose lately such as the car alternator can not be run in parallel wlthout modifying. To remove the defects the equalizing line was connected between the same phase of the alterna-tor to flow the synchronizing current which syncronize the phases of generator electromotive forces by which the alternator can be run in parallel without reference to the hunting inducing point and without modifying.

  • PDF

A-team Based Approach for Reactive Power/Voltage Control Considering Steady State Security Assessment (정태 안전성 평가를 고려한 무효전력 전압제어를 위한 A-team기반 접근법)

  • Kim, Doo-Hyun
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.2
    • /
    • pp.150-159
    • /
    • 1996
  • In this paper, an A-team(Asynchronous Team ) based approach for Reactive power and volage control considering static security assessment in a power system with infrastructural deficiencies is proposed. Reactive power and voltage control problem is the one of optimally establishing voltage level given several constraints such as reactive generation, voltage magnitude, line flow, and other switchable reactive power sources. It can be formulated as a mixed-integer linear programming(MILP) problem without deteriorating of solution accuracy to a certain extent. The security assessment is to estimate the relative robustness of the system in Its present state through the evaluation of data provided by security monitoring. Deterministic approach based on AC load flow calculations is adopted to assess the system security, especially voltage security. A security metric, as a standard of measurement for power system security, producting a set of discrete values rather than binary values, is employed. In order to analyze the above two problems, reactive power/voltage control problem and static security assessment problem, in an integrated fashion for real-time operations, a new organizational structure, called an A-team, is adopted. An A-team is an organization for agents which ale all autonomeus, work in parallel and communicate asynchronously, which is well-suited to the development of computer-based, multi-agent systems for operations. This A-team based approach, although it is still in the beginning stage, also has potential for handling other difficult power system problems.

  • PDF