• Title/Summary/Keyword: 교량 관리 시스템

Search Result 280, Processing Time 0.026 seconds

Identifying Considerations for Developing SLAM-based Mobile Scan Backpack System for Rapid Building Scanning (신속한 건축물 스캔을 위한 SLAM기반 이동형 스캔백팩 시스템 개발 고려사항 도출)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.312-320
    • /
    • 2020
  • 3D scanning began in the field of manufacturing. In the construction field, a BIM (Building Information Modeling)-based 3D modeling environment was developed and used for the overall construction, such as factory prefabrication, structure construction inspection, plant facility, bridge, tunnel structure inspection using 3D scanning technology. LiDARs have higher accuracy and density than mobile scanners but require longer registration times and data processing. On the other hand, in interior building space management, relatively high accuracy is not needed, and the user can conveniently move with a mobile scan system. This study derives considerations for the development of Simultaneous Localization and Mapping (SLAM)-based Scan Backpack systems that move freely and support real-time point cloud registration. This paper proposes the mobile scan system, framework, and component structure to derive the considerations and improve scan productivity. Prototype development was carried out in two stages, SLAM and ScanBackpack, to derive the considerations and analyze the results.

Analysis of Geothermal Melting System Conductivity for Improving Road Safety (도로주행 안정성 향상을 위한 지열 융설시스템 열전도 분석)

  • Lee, Seok-Jin;Kim, Bong-Chan;Lee, Seung-Ha;Seo, Un-Jong;Kim, Jin-Han;Lee, Joo-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.1
    • /
    • pp.43-50
    • /
    • 2010
  • Sliding accidents on the road have a high percentage by road freezing, especially, they often have appeared at bridges and Tunnel of freezing areas. Thus, the stability of road operations is enhanced by preventing partial freezing phenomenon. According to the geothermal snow melting system analysis, a pattern of thermal conductivity is found out; pavement materials of concrete and asphalt where the system is buried. The heat transfer simulation is essential when the geothermal snow melting system is applied according to heating exchanger pipe placed in the lower pavements. The model tests are conducted on low temperature in freezer using the manufactured test model which is equal to pavement materials. Many variables are discovered from numerical analyses under the same conditions with model test.

  • PDF

Development of Water Velocity Data Preprocessing Method for PAVOs (PAVOs 활용을 위한 유속데이터 전처리 기법 개발)

  • Soyeon Lim;Youngmoo Yu;Sinjae Lee;Yeongil Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.85-85
    • /
    • 2023
  • 유량 측정을 위해 도섭법, 횡측선법 등의 인력에 의한 방법이 적용되고 있으나, 이는 야간 및 휴일 측정, 인력 부족 등 여러 제약으로 인해 고수위 홍수를 측정하는 데에 한계가 있다. 이를 해결하기 위해 시공간적 제약이 없는 도플러 방식 초음파유속계(Acousitc Doppler Velocity Meter, ADVM)와 자동유속관측시스템(Portable Automatic Velocity Observation System; PAVOs)이 제안되었다. 이 방법들은 교량에 설치된 장치를 통해 실시간으로 유속이 계측되어 시공간적 제약이 없으며 홍수 관리에 유용하게 사용될 수 있다. 실시간으로 계측된 유속 데이터는 오·결측 값이 발생하며 ADVM의 경우 수위-유량관계식을 활용하는 등 전처리 방법이 활용되고 있지만 전자파표면유속계를 활용한 PAVOs 데이터의 전처리 방법에 대한 연구는 부족하다. 따라서 본 연구에서는 PAVOs에서 실시간으로 계측된 유속 데이터의 전 처리 과정(Pre-processing)을 개발하였다. PAVOs를 통해 측정된 데이터는 5분 단위로 10개의 유속이 한번에 측정되며 비정상성(Non-stationary)인 특징을 가진다. 이 데이터의 전처리 과정으로 오·결측값에 대한 처리 및 보간법 적용 이후 10개 값 중 실제 유속을 판단하고 잡음제거(Denoising)를 수행하였다. 이를 강원도 홍천강에 위치한 홍천교에서 계측된 유속 데이터에 적용하였다. 그 결과 데이터의 상승부와 하강부에서 일정한 경향성을 파악할 수 있다. 이 데이터를 통해 산정한 유량과 실측 기반의 평균유속과 관계를 통해 계산한 유량을 비교해 보았을 때 낮은 편차율을 가지는 것을 확인하였다. 전 처리 된 실시간 유속 데이터를 활용한다면 최고수위가 발생하였을 경우 홍수량을 산정할 수 있을 것이다. 또한, 강우 또는 하천 공사에 의해 변동하는 수위-유량관계곡선식을 실시간으로 개발할 수 있을 것이며 이는 효과적인 홍수관리에 큰 역할을 할 수 있을 것이다.

  • PDF

A Study on the Structural Behavior of LB-DECK Panel Considering Rebar-Arrangement in Site (현장 배근이 LB-DECK 패널의 구조거동에 미치는 영향)

  • Lho, Byeong-Cheol;Cho, Gyu-Dae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.3
    • /
    • pp.167-174
    • /
    • 2008
  • The objective of this study is to verify whether the composite action is sufficiently strong to withstand at the interface and the structural behavior of LB-DECK panel with field concrete slab strengthened with main reinforcing bars. Static and fatigue tests are performed for LB-DECK panels with varied shapes and amounts of rebars, and the results are compared with those of field concrete panel(FCP). The test results indicate that the LB-DECK panel with 1.5 times of more rebars inside significantly increase the overall stiffness. LB-DECK penel usually shows on average 52.1 percent of improved stiffness compared with the FCP. The fatigue test results also show that the LB-DECK panel can withstand two-million cycles of repeated loads without any damage.

Comparative Analysis on Productivity Data and Cost Estimate System of Road Bridge Construction in Korea and China (한국 및 중국 도로교량공사의 생산성자료 및 예정가격 산정시스템 비교분석)

  • Chang, Cheng;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.39-47
    • /
    • 2020
  • There are two kinds of cost estimate system in construction in china. Quota valuation model is a traditional cost estimate system under the unity of quantity and price, which is easier and has been used for decades. But the Quota valuation model becomes increasingly unsuited to the needs of society with the development of market economy. To meet the needs of China's market economy development and construction works in the field of international cooperation, the Bill of Quantities valuation model was introduced in 2003. However, there are still many shortcomings and deficiencies in the course of implementation of Bill of Quantities valuation model. In addition, interest in the Chinese construction market continues to increase in Korea due to the recent new North Korean policy and China's the Belt and Road policy. This paper aims to examine the cost estimate system of public construction works in China, and to provide basic data for deriving future improvement plans by comparing and analyzing it with standard cost estimate system in Korea.

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

Vision-based Method for Estimating Cable Tension Using the Stay Cable Shape (사장재 케이블 형태를 이용하여 케이블 장력을 추정하는 영상기반 방법)

  • Jin-Soo Kim;Jae-Bong Park;Deok-Keun Lee;Dong-Uk Park;Sung-Wan Kim
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.1
    • /
    • pp.98-106
    • /
    • 2024
  • Due to advancements in construction technology and analytical tools, an increasing number of cable-stayed bridges have been designed and constructed in recent years. A cable is a structural element that primarily transmits the main load of a cable-stayed bridge and plays the most crucial role in reflecting the overall condition of the entire bridge system. In this study, a vision-based method was applied to estimate the tension of the stay cables located at a long distance. To measure the response of a cable using a vision-based method, it is necessary to install feature points or targets on the cable. However, depending on the location of the point to be measured, there may be no feature points in the cable, and there may also be limitations in installing the target on the cable. Hence, it is necessary to find a way to measure cable response that overcomes the limitations of existing vision-based methods. This study proposes a method for measuring cable responses by utilizing the characteristics of cable shape. The proposed method involved extracting the cable shape from the acquired image and determining the center of the extracted cable shape to measure the cable response. The extracted natural frequencies of the vibration mode were obtained using the measured responses, and the tension was estimated by applying them to the vibration method. To verify the reliability of the vision-based method, cable images were obtained from the Hwatae Bridge in service under ambient vibration conditions. The reliability of the method proposed in this study was confirmed by applying it to the vibration method using a vision-based approach, resulting in estimated tensions with an error of less than 1% compared to tensions estimated using an accelerometer.

Study of the Effect of the Point-to-Point Speed Enforcement System Using a Comparison-Group Method (비교그룹방법을 이용한 무인구간속도위반단속시스템 설치 효과 분석)

  • Yun, Il-Soo;Park, Sung-Ho;Oh, Bong-Sik;Oh, Young-Tae
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.177-185
    • /
    • 2011
  • In order to reduce traffic accidents at long road sections involving high risks of traffic accidents, including tunnels, bridges or curves, the National Police Agency have decided a tentative installation and operation of an automated point-to-point speed enforcement system based on cameras at January, 2007. The first system was established at the direction to Kangreung of Dunnae Tunnel at December, 2007. Currently, the automated point-to-point speed enforcement system operates at 11 sections including eight sections on expressways and three sections on national highways. However, there have been few researches on the effects of the system upon the reduction of traffic accidents in a scientific way. To this end, this research effort was initiated to evaluate the effect of the automated point-to-point speed enforcement system on traffic safety by comparing the number of traffic accidents before and after the installation of the system using a comparison-group(C-G) method. Three-year-long traffic accident data for the expressways were collected in order to evaluate the system. As a result, the installation of the system was found to reduce traffic accidents by 49.97% in average.

Risk Assessment Improvement Method of Small Stream When Small Sized Hazard Infrastructures Survey (소규모 공공시설 조사시 세천의 위험도 평가 방안)

  • Jungsoo Rho;Kyewon Jun;Jaesung Shin
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.1
    • /
    • pp.23-35
    • /
    • 2023
  • Recently, the damage caused by natural disasters such as typhoons and localized torrential rains has been increasing rapidly. The Ministry of the Interior and Safety enacted a 「law on safety management of small sized infrastructures」 and local governments have to register small sized infrastructures with the National Disaster and Safety Management System (NDMS) until March 31st every year. Recently, each local government has ordered Safety inspections of small sized infrastructures and maintenance plans and six types of facilities, including small streams, small bridges, farm roads, access roads to village, inlet weirs, and drop structures are being surveyed and digitized into a database. Each facility is being evaluated for risk, and for those deemed hazardous, maintenance plans are being developed. However, since the risk assessment method of small sized infrastructures is not clear so that is conducted through visual investigation by field investigators, risk assessment is conducted in a subjective and ambiguous form. Therefore, this study presented a reasonable and quantitative risk assessment method by providing a quantitative evaluation indicator for small stream, which has the highest disaster risk among other small sized infrastructures, so that small sized hazard infrastructures can be selected to secure transparent evidence for improvement plans and action plans.

Application of Total Station for Structure and Terrain Displacement Monitoring (구조물 및 지형변위 모니터링을 위한 토털스테이션의 활용)

  • Park, Joon-Kyu;Um, Dae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.582-587
    • /
    • 2020
  • Recently, disasters caused by extreme weather and the damage caused by them are increasing worldwide. The interest in disasters, such as earthquakes, typhoons, and ground subsidence, is increasing in Korea. Korea has enacted a special law based on disaster management, and has built monitoring systems for individual facility units by building precision sensors and related systems to measure the displacement status of long bridges and high-rise composite buildings. On the other hand, the application of a real-time monitoring system is insufficient for slopes, open-pit mines, small and medium structures due to weather, measurement methods, cost, and constant monitoring difficulties. In this study, the displacement monitoring method using the total station was studied and the applicability was suggested through the experiment. Through the research, the concept and operation flow of a monitoring system that can measure the displacement of the terrain or the structure using the total station was presented. The monitoring system allows the user to select the location and operation method of the equipment so that the equipment can be installed according to the site situation, and set the number of observations, the period, and the observation range of the object. Using the experiment on the monitoring system, the station was monitored with precision within 5mm, and it was suggested that the displacement of the object can be monitored using the total station. Further research will be needed to assess the applicability of monitoring to real slopes and structures.