• Title/Summary/Keyword: 교각 두부

Search Result 6, Processing Time 0.016 seconds

Application and Verification of Coupled Analysis of Piled Piers (교량 말뚝기초 해석기법의 적용성 분석)

  • Won Jin-Oh;Jeong Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.4
    • /
    • pp.123-134
    • /
    • 2005
  • A coupled three-dimensional pile group analysis method (YSGroup) was developed considering nonlinear pile head stiffness matrices and compared with other analytical methods (elastic displacement method, Group 6.0 and FBPier 3.0). In this method, a pile cap was modelled by four-node flat shell element, a pier was modelled using 3 dimensional beam element, and individual piles were modelled as beam-column elements. Through the comparative studies on a piled pie. subjected to lateral loads in linear soil, it was found that present method (YSGroup), elastic displacement method and Group 6.0 gave similar results of lateral pile head displacement, but FBPier 3.0 was estimated to show somewhat larger displacements than those from the three methods. Displacements of superstructure (pier), including nonlinear soil behavior, could be estimated by present method (YSGroup) and FBPier 3.0 because these two methods modelled the superstructure directly by finite element techniques. It was found that pile groups in pinned pile head condition had a tendency to cause excessive rotation of the pile cap.

A Study on Strengthening of Reinforced Concrete Pier Caps Using Prestressed Near Surface Mounted CFRP (프리스트레스가 도입된 표면매립 CFRP를 이용한 교각 두부 보강에 관한 연구)

  • Hong, Sung-Nam;Kim, Tae-Wan;Park, Sun-Kyu;Park, Jong-Sup;Park, Young-Hwan
    • Journal of the Korea Concrete Institute
    • /
    • v.19 no.5
    • /
    • pp.595-602
    • /
    • 2007
  • Recently, concrete structures with carbon fiber reinforced polymer (CFRP) reinforcements have been commonly used for the bridge and building construction. In this paper, pier caps were strengthened by prestressed near surface mounted CFRP. To verify the effectiveness of the strengthening method, 7 pier cap specimens were fabricated. One specimen was designed for control, two for external prestressing steel strands, two for CFRP plates, and two for CFRP bars. Experimental variables consist of type of reinforcement materials and prestressing levels. The results of laboratory have shown that the ultimate load capacities of prestressed near surface mounted CFRP specimens were about $20{\sim}33%$ greater than that of a control specimen. Also, ultimate load capacities of prestressed near surface mounted CFRP specimens were similar to those of external prestressing specimens with steel strands.

The Inclination Characteristics of PSC BOX in FCM Bridge Construction Method (FCM 교량 가설 공법에서 주두부의 기울음 특성)

  • Hyun-Euk Kang;Wan-Shin Park;Young-Il Jang;Sun-Woo Kim;Hyun-Do Yun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.12-20
    • /
    • 2023
  • This study presents basic data on how to secure stability by analyzing the change in tensile force of steel rod and the inclination characteristics of PSC BOX in the "Temporary fixation system using internal prestressing tendon", which is mainly applied to construction of superstructures by FCM. To date, it has been difficult to confirm the changes in tension force of the steel rod and the inclination of the PSC BOX because the steel rod was installed vertically inside the pier and the PSC BOX. Therefore, measurement of the change in length of the steel rod and the displacement of PSC BOX were performed using a micro-measured FBG sensor. Comparisons of the calculated tensile force and the residual tensile force of the steel rod revealed that the safety factor decreased in all bridges. The cause was mainly identified to be the loss of tensile force in fixation~1segment, and countermeasures are suggested. The analysis of the inclination characteristics showed that the inclination increased with the segment progresses even in bridges with sufficient safety factor, and the difference before and after the segment was confirmed. In addition, the increase in inclination was related to the loss of tension force in the steel rod, and the stress on the opposite sides of the inclination was further reduced. It is believed that upward tensile force is generated in the steel rod on the opposite side of the inclined side due to the unbalanced moment, causing the difference in stress of the steel rod between the two sides.

Inspection of A Deteriorated Bridge Pier Cap Using Common Nondestructive and Destructive Test (파괴 및 비파괴 검사를 이용한 노후 교량의 교각 두부 조사)

  • Kim, Tae Wan;Hong, Sung Nam;Han, Kyoung Bong;Park, Sun Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.2
    • /
    • pp.91-102
    • /
    • 2008
  • Nondestructive testing techniques have been historically and commonly used to evaluate the quality of existing concrete structures. The techniques utilized included visual inspection, hammer sounding, Schmidt hammer rebounding, and ultrasonic pulse velocity testing including tomographic imaging. Results of the nondestructive tests were used to determine areas to be tested with local destructive tests. These tests included concrete compressive strengths, chloride testing, and petrographic testing. The overall results indicate that inside core of each of the pier caps are healthy. On all of the pier caps, extensive exterior concrete layer rehabilitation needs to be completed. This paper shows the application and interpretation of common nondestructive testing techniques and the consequent repair, rehabilitation, maintenance decisions and safety assesment.

Nonlinear Three-dimensional Analysis of Piled Piers Considering Coupled Cap Rigidities (교량 말뚝기초의 캡강성을 고려한 비선형 3차원 해석)

  • Won Jin-Oh;Jeong Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.6
    • /
    • pp.19-30
    • /
    • 2005
  • A coupled three-dimensional pile group analysis method was developed by considering complex behavior of sub-structures (pile-soil-cap) which included soil nonlinearity and the behavior of super-structure (pier). As an intermediate analysis method between FBPier 3.0 and Group 0.0, it took advantages of each method. Among the components of a pile group, individual piles were modeled with stiffness matrices of pile heads and soils with nonlinear load-transfer curves (t-z, q-z and p-y curves). A pile cap was modeled with modified four-node flat shell elements and a pier with three-dimensional beam element, so that a unified analysis could be possible. A nonlinear analysis method was proposed in this study with a mixed incremental and iteration techniques. The proposed method for a pile group subjected to axial and lateral loads was compared with othe. analytical methods (i.e., Group 6.0 and FBPier 3.0). It was found that the proposed method could predict the complex behavior of a pile group well, even though piles were modelled simply in this study by using pile head stiffness matrices which were different from the method introduced in FBPier 3.0.

Stress Variation Characteristics of Temporary Fixed Steel Rod in FCM Bridge Construction Method (FCM 교량 가설 공법에서 임시 고정 강봉의 응력 변화 특성 )

  • Hyun-Euk Kang;Wan-Shin Park;Young-Il Jang;Sun-Woo Kim;Hyun-Do Yun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.21-29
    • /
    • 2023
  • In this study, the stress characteristics of temporary fixed steel rods were analyzed in the "temporary fixing system using internal prestressing tension", which is mainly applied to the construction of superstructures by FCM. It was difficult to confirm the changes in initial tensile force in this system because the steel rod was internally connected to the pier and the PSC BOX. Therefore, measurement was performed before and after the completion of each segment using an FBG sensor to measure the change in the micro length of the steel rod. The results of the analysis showed that 75% to 90% of the maximum vertical contraction of the steel rod that occurred until the completion of the cantilever segment occurred in the fixing ~ 1segment, and the maximum loss of initial prestressing force was 39%. Such excessive loss of tension force to 1 segment means that tension is needed to improve the precision of construction during the fixation, and re-tension is needed to secure stability for conduction of cantilever segments after the completion of 1segment. In the 2 ~ last segment, the stress of the steel rod decreased gradually, and in the summer, the decrease in stress tended to partially recover due to the increase in the length of the steel rod corresponding to the increase in the vertical volume of PSC BOX. The dominant factor in the stress change in 2~ last segment in this phenomenon is judged to be the change in the length of the steel rod according to the temperature. Unlike the change in length, the relaxation was 1.2-2.7%, which was mostly offset by the opposite stress corresponding to the temperature stress. Therefore, a plan was proposed to improve the internal stress, such as adjusting the fixation time.