Nondestructive Deterioration Diagnosis for the Former Ore Dressing Plant in the Yongwha Mine of Registered Cultural Property No. 255 (등록문화재 제255호 영양 구 용화광산 선광장의 비파괴 훼손도 진단)

  • Chun, Yu Gun;Lee, Chan Hee
    • Journal of Conservation Science
    • /
    • v.28 no.3
    • /
    • pp.235-245
    • /
    • 2012
  • Nondestructive deterioration diagnosis has been carried out for the former ore dressing plant of the Yongwha mine in Yeongyang (Registered Cultural Property No. 255). Deterioration rates about organic contaminant and soil of the upper part (7 to 13 layer) indicate higher than the lower part (1 to 6 layer) of the ore dressing plants. By contrast, deterioration rates such as crack, break out and discoloration of the lower part indicate very higher than the upper part. It is estimated that the plants of the lower part that mechanical and chemical process had been done for flotation were damaged severely by physicochemical weathering with reaction of concrete and chemical solution. As results of ultrasonic velocity measurement, average p-wave velocity of plants were measured 2,462m/s (compressive strength $529kgf/cm^2$). As for the analytical results of surface contaminants and soil compositions using P-XRF, they were identical with major elements (Cu, Zn, Pb, Fe and As) of ore minerals from the Yongwha mine. Therefore, the ore dressing plant should be treated by phytoremediation with conservation because heavy metals could impinged upon plants and natural environment.

A Study on the Development of Rapidly Hardening Grouting Method for the Effective Filling in the Underground Cavity (지하공동의 효율적 충전을 위한 급결 충전 그라우트공법개발에 관한 연구)

  • Kim, Soo-Lo;Kim, Tae-Heok;Shin, Dong-Chun;Kwon, Hyun-Ho
    • Tunnel and Underground Space
    • /
    • v.19 no.6
    • /
    • pp.534-544
    • /
    • 2009
  • The collapse of the underground cavity can cause the abrupt local subsidence of the ground surface. It can be hazardous to the stability of road and building for human activity. Therefore it is necessary to develop reinforcement methods for the filling of the underground cavity. This study was executed to improve the material quality and systems to fill the calcium-aluminate mineral $(C_{12}A_7)$ environmentally, and minimize the loss of filling materials for the steep underground cavity. Filling material which was developed in this study is composed of rapid hardening material and additives. The developed material had rapid hardening and non-separation ability in the water cavity condition, so it made the effective underground dam in the cavity with prevention of material loss when it was poured in the water cavity. Results of heavy metal leaching test for environmental assessment showed that it was environmentally suiTable material for the filling in the mine cavity.

Mine Haulage System Design for Reopening of Yangyang Iron Mine using 3D Modelling (3차원 모델링을 이용한 재개광 양양철광의 운반시스템 설계)

  • Son, Youngjin;Kim, Jaedong
    • Tunnel and Underground Space
    • /
    • v.22 no.6
    • /
    • pp.412-428
    • /
    • 2012
  • To achieve mine development, a large amount of data concerned with the geological structure and the ore body had to be investigated and collected through geological survey, drilling and geophysical explorations. In most previous cases, however, the data were usually analyzed two dimensionally and those results showed some limits because of their 2D presentation. Those 2D maps such as geological plane sections or longitudinal sections cause lots of difficulties in understanding the complex geological structure or the feature of ore body in a spatial way. In this study, research area was set on the abandoned Yangyang iron mine in Korea and the Sugaeng ore body within the mine was selected as the research target to design a mine haulage system for reopening. A 3D mine model of this area was tried to be constructed using a 3D modelling software, GEMS. An accurate 3D model including the ore body, the geological structure, the old underground mine drifts and the new mine drifts was constructed under the purpose of reopening of the abandoned iron mine. Especially, mine design for trackless haulage system was conducted. New inclines and drifts were planned and modelled 3 dimensionally considering the utilization of old drifts and shaft. In addition to the 3D modelling, geostatistical technique was adopted to generate a spatial distribution of the ore grade and the rock physical properties. 3D model would be able to contribute in solving problems such as evaluating ore reserves, planning the mine development and additional explorations and changing the development plans, etc.

Numerical Study on Vertical Stress Estimation for Panel Pillars at Room and Pillar Mines (주방식 광산의 패널 광주 수직응력 추정을 위한 수치해석 연구)

  • Yoon, Dong-Ho;Song, Jae-Joon
    • Tunnel and Underground Space
    • /
    • v.30 no.5
    • /
    • pp.473-483
    • /
    • 2020
  • This paper examines the vertical stress change concentrated on mine pillar which occurs due to the stress disturbance from opening excavation at room and pillar mine by FLAC3D, a finite difference method (FDM) software. The mesh size combination is decided with a careful consideration of relative error and run-time, then its performance is verified. A series of numerical analyses is conducted and the vertical stress at central pillar was observed for the test cases of 1×1 to 11×11 mine pillars, 40 m to 320 m depth with 40 m difference. The results show that the vertical stress of pillar approaches to the similar value with the value estimated by tributary area theory(TAT) when the development area (NP) is increased or the height of overburden (HOB) is decreased, while it is overestimated in the opposite case. Furthermore, it also represents that the vertical stress factor (VSF) converges to a specific value when the depth is increased whille keeping the development area identical.

A Study on the Stability Analysis of Underground Limestone Openings using the Measurement Vibration Waveform (실측진동파형을 이용한 석회석 갱내채광장의 안정성 분석 연구)

  • Kim, Byung-Ryeol;Lee, Seung-Joong;Choi, Sung-Oong
    • Tunnel and Underground Space
    • /
    • v.28 no.5
    • /
    • pp.457-475
    • /
    • 2018
  • For increase of reality in numerical analysis, a blasting vibration waveform obtained from field blast operations has been directly used for input parameters of dynamic analysis in the form of vibration velocity. A numerical model was built considering the geological characteristics of underground limestone opening as well as the mining stages in this opening, and the effect of blast operations on stability of underground limestone opening was investigated by dynamic numerical analysis. The adequacy of applying the real vibration waveform to dynamic analysis has been approved from the preliminary analysis, and the dynamic numerical analysis results show that the continuous mining operation can cause the collapse of roof in openings and the active yield zone around openings. Therefore, the additional reinforcements should be applied for ensuring the stability of underground limestone openings.

Failure Prediction for Weak Rock Slopes in a Large Open-pit Mine by GPS Measurements and Assessment of Landslide Susceptibility (대규모 노천광 연약암반 사면에서의 GPS 계측과 위험도평가에 의한 파괴예측)

  • SunWoo, Choon;Jung, Yong-Bok;Choi, Yo-Soon;Park, Hyeong-Dong
    • The Journal of Engineering Geology
    • /
    • v.20 no.3
    • /
    • pp.243-255
    • /
    • 2010
  • The slope design of an open-pit mine must consider economical efficiency and stability. Thus, the overall slope angle is the principal factor because of limited support or reinforcement options available in such a setting. In this study, slope displacement, as monitored by a GPS system, was analyzed for a coal mine at Pasir, Indonesia. Predictions of failure time by inverse velocity analysis showed good agreement with field observations. Therefore, the failure time of an unstable slope can be roughly estimated prior to failure. A GIS model that combines fuzzy theory and the analytical hierarchy process (AHP) was developed to assess slope instability in open-pit coal mines. This model simultaneously considers seven factors that influence the instability of open-pit slopes (i.e., overall slope gradient, slope height, surface flows, excavation plan, tension cracks, faults, and water body). Application of the proposed method to an open-pit coal mine revealed an enhanced prediction accuracy of failure time and failure site compared with existing methods.

A Study on the Ventilation Schemes for Gas Leakage and Dispersion Controlling at the Backfilled Working Face in Large-Opening Underground Mine (대단면 지하광산 갱도내 뒷채움 작업장 가스유출 및 확산제어 통기방안 연구)

  • Nguyen, Vanduc;Lee, Changwoo
    • Tunnel and Underground Space
    • /
    • v.28 no.4
    • /
    • pp.372-386
    • /
    • 2018
  • The air quality near the backfilled site area is significantly deteriorated during and even after the curing period of the backfill materials. Hazardous gases such as NH3 and CO2 may leak out prolongedly from the mined-out sites backfilled with the composite carbonate-based material; leakage can be observed at the underground working sites as well as on the surface. At operating mines, underground gas leakage will severely aggravate the workplace environment. The ventilation schemes should supply sufficient air to dilute the contaminated air, and control the toxic gas leakage and dispersion. This study shows the applicability of pressurization ventilation system to control gas leakage and dispersion at the backfilled underground mine site.

A Study on the Improvement of Surface Blasting Method in Pasir Coal Mine (파시르 탄광에서의 채탄발파공법에 대한 문제점 분석 및 개선방안 연구)

  • Choi Byung-Hee;Ryu Dong-Woo;SunWoo Choon
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.57-62
    • /
    • 2006
  • The typical blasting method adopted in Pasir Coal Mine is a surface blasting technique with a single free face. It means that there is only one free face, which is usually the ground surface. This kind of blasting method is easy to use but inevitably causes enormous ground vibrations, which, in turn, can affect the stability of the slopes comprising the various boundaries of the open pit mine. In addition, the method also has the problem of lowering the blast efficiency compared to other methods such as bench blasting methods or ones with more than two free faces. In this respect, a project was launched to develop a new blasting method that is suitable for controling the ground vibration and enhancing the blast efficiency. As a part of the project, authors investigated the current blasting method as well as the overall pit developing process in the mine, and established some important guidelines that should be observed during the whole development process. This paper presents the details of the typical blasting pattern and the pit developing method in the mine, and suggests the guidelines determined from the results of the observations.

Microseismic Data Analysis Program for Monitoring Ground Subsidence in Mining Area (광산지역 지반침하 모니터링을 위한 미소진동 분석프로그램 개발 현황)

  • Park, Juhyun;Park, Jayhyun;Yang, Injae;Kim, Jungyul;Kim, Yoosung;Kwon, Sungil;Kwon, Hyongil
    • Geophysics and Geophysical Exploration
    • /
    • v.21 no.4
    • /
    • pp.262-272
    • /
    • 2018
  • A system for microseismic monitoring due to underground displacements is being operated in several mining areas in order to analyze ground subsidence. Microseismic monitoring system mainly consist of three components; 3-component geophone, data logger and analysis program. The previous analysis program had found the location of microseismic source by analysing only first arrivals of P-waves, but the upgraded analysis program has improved accuracy of the location by analysing both P- and S-waves. This analysis program also has upgraded the function to calculate the microseismic magnitude by using regional specific coefficient and microseismic amplitude. Also the program has upgraded the function to confirm visual location of microseismic source by superimposing field aerial photographs and the results.

Pilot Test of Grid-Type Underground Space Considering Underground Complex Plant Operation (지하 복합플랜트 운영 중 확장을 고려한 격자형 지하공간 파일럿 테스트)

  • Chulho Lee
    • Tunnel and Underground Space
    • /
    • v.33 no.6
    • /
    • pp.472-482
    • /
    • 2023
  • The grid-type or room-and-pillar method is applied for the purpose of mining horizontally buried minerals. In this study, design and pilot test were performed to apply the room-and-pillar method which uses natural rock as a rock pillar to the construction of underground space. The area where the pilot test was conducted was in stone mine and had good rock conditions with an appropriate depth (about 30 m) to apply the pilot test. The pilot test site was selected by reviewing accessibility and ground conditions and then site construction was performed through detailed ground investigation and design. The pilot test was designed with a column shape of 8×8 m and a cross-section of 8×12 m. The blasting pattern was determined through test blasting at the site, and blasting of 3 m excavation with 89 holes was performed. Through field observations, the average width of 12.5 m and the average height of 8.3 m were measured. Therefore, it is possible to proceed similar to the cross-sectional shape considered in the design.