• Title/Summary/Keyword: 관리 한계

Search Result 2,935, Processing Time 0.035 seconds

Outcomes and Limitations of the Library Management Research in Korea (한국 도서관경영 연구의 성과와 한계)

  • Yoon, Hee-Yoon
    • Journal of Korean Library and Information Science Society
    • /
    • v.42 no.3
    • /
    • pp.25-44
    • /
    • 2011
  • The purpose of this study is to analyze academic research trends of the library management in Korea and to suggest its outcomes and limitations. For this purpose, the study analyzed a total of 2,567 papers from 2001 to 2010 at the five authorized journals of the National Research Foundation of Korea. As a result, library management papers were occupied by about 21.8%(560 papers) of the total paper. The sub categories showed a high performance in library management research were general management, policy and system, human resource management, measurement and evaluation. However, the organization and budget management, building and facility, marketing and PR were very weak in the research performance.

Correlation between Groundwater Level and the Moving Average of Precipitation Considering Infiltration Rate in Gyeongsang-Do Region (침투율을 고려한 경상도 지역의 지하수위와 강우이동평균의 상관관계)

  • Kim, Nam-Ki;Yang, Jeong-Seok;Kang, Boo-Sik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1991-1995
    • /
    • 2010
  • 도시화로 인한 토지 피복 상태의 변화로 인한 불투수면적의 증가와 강우강도가 증가함에 따라 지하수로 침투하지 못하고, 바다로 유출되는 강우량이 점차 증가하고 있다. 또한, 인구의 증가와 산업발달에 따른 무분별한 지하수의 사용은 심각한 지하수위의 하강으로 이어지고 있다. 지하수위와 강우량간의 상관관계를 분석하여 지하수의 체계적인 관리 및 운용을 하고자 본 연구를 진행하였다. 본 연구에서는 경상도 지역의 지하수위 관측소와 강우 관측소간의 거리가 10km 이내인 지점을 선정하여, 관측 자료와 분석결과를 토대로 13개 지점을 선정하였다. 침투현상이 침루과정을 거쳐 지하수에 유입되는 과정을 고려하면 강우가 발생한 시점보다 시간이 경과 한 후에 이 지점의 하루에 내린 강우량이 이틀에 걸쳐 지하수위에 영향을 준다고 가정하였고, 1일째의 강우를 실제 강우량의 최대 100%에서 50%까지로 설정하고 2일째에 나머지 강우가 내렸다고 가정하여 각각의 강우이동평균값과 지하수위간의 상관관계를 분석하였다. 또한, 한계침투량을 고려하여 강우이동평균값과 지하수위간의 상관관계를 분석하였다. 그 결과 한계침투량 고려시 상관계수가 0.5 이상인 지점들 중 약 70%가 강우량을 강우사상이 발생한 당일과 명일로 나누었을 때, 상관계수가 높게 나타났다. 그러므로 기존 강우와 지하수위 관측자료만 이용하여 강우이동평균과 지하수위의 상관관계를 분석하는 것 보다 침투율을 고려한 강우이동평균과 지하수위의 상관관계 분석으로 인해 지하수의 체계적인 관리와 분석이 가능할 것으로 사료된다.

  • PDF

Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

차등세율(差等稅率)이 선도이자율(先渡利子率)과 기간(期間)프리미엄에 미치는 영향

  • Kim, Seok-Jin
    • The Korean Journal of Financial Studies
    • /
    • v.3 no.2
    • /
    • pp.67-95
    • /
    • 1996
  • 본 연구는 단기소득과 장기소득에 대한 차등세제(差等稅制)(differential taxation)가 선도이자율, 기간프리미엄, 이자율의 기간구조 등에 미치는 영향을 이론적으로 분석하고 있다. 분석결과, 세금이 있을 경우 선도이자율(先渡利子率)은 미래이자율(未來利子率)의 추정치로써 하향편의(下向偏倚)(downward bias)를 가지며, 이러한 세금편의(稅金偏倚)(tax bias)의 크기는 장기소득세율(長期所得稅率)이 낮을수록 한계체감적으로 증가하고 미래이자율(未來利子率)이 상향 또는 평평한 구조를 가질 경우 잔존만기가 길수록 증가하며, 세금편의의 크기의 한계변화는 미래이자율(未來利子率)이 상향(上向)하고 있지 않는 한 장기소득세율(長期所得稅率)이 낮을수록 한계체감적으로 증가하는 것으로 나타났다. 따라서, 만기(滿期)가 길 경우 기간프리미엄이 음(陰)으로 나타나고 기간구조가 1년이 지나서는 모양이 다양하게 나타나고 있다는 Fama(1984)의 연구결과는 기존의 이자율의 기간구조(期間構造)에 관한 제이론(諸理論)들로써는 설명될 수 없으나, 본 연구가 분석한 음(陰)의 세금효과(稅金效果)에 의해서 설명될 수 있었다. 또한, 선도이자율이 우하향구조(右下向構造)를 가질 경우에는 장기현물이자율(長期現物利子率)이 보다 나은 미래이자율(未來利子率)의 추정치이며, 선도이자율이 우상향구조(右上向構造)를 가지는 경우에는 선도이자율(先渡利子率)이 현물이자율보다 우수한 미래이자율의 추정치인 것으로 분석되었다.

  • PDF

Analysis of Water Level Change using D-InSAR Technique (D-InSAR 기법을 활용한 하천 수위 변화 분석)

  • Young Jun Bang;MinJi Seo;Hyock Jin Lim;Chi Young Kim
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.409-409
    • /
    • 2023
  • 하천 수위는 합리적인 수자원의 이용 및 관리를 위해 반드시 필요한 수문 자료이다. 우리나라에서는 수위 측정을 위해 유역 내에 관측소를 설치하여 장비 또는 인력을 통해 수위를 측정하고 있다. 하지만, 많은 관측소를 운영하고 관리하기에는 예산과 인력이 소모되는 한계가 있다. 위성 영상을 통한 시계열 분석은 전지구적 모니터링과 관측 분야에 중요한 역할을 수행할 것으로 기대되고 있으며, 특히 위성 영상자료를 활용한 수자원 분야 연구가 활발히 진행되고 있다. 위성 영상을 활용하여 수면적을 감지하고 수위와 유량을 판별하는 많은 연구가 진행되었지만, 하천 하상의 경사와 단면 형태에 따라 수면적이 변하여 정량적인 수위 추정에는 한계가 존재한다. 본 연구에서는 Sentinel-1의 SAR 영상과 InSAR 기법을 통해 낙동강 유역의 홍수 전후의 하천 수위 변화를 분석하였다. Sentinel-1 IW 모드의 Single Look Complex(SLC) 영상 12장과 ESA 영상 처리 툴인 SNAP을 활용하여 VV(Vertical-Vertical) 데이터의 간섭을 통해 센티미터(cm) 단위지표 변화에 따른 수위 변위를 분석하였다. 위성 영상을 통해 추출한 수위 변위와 계측 수위 및 단면 자료의 정합성을 비교한 결과, 제방과 수체 경계면 식생과 하상 세굴로 인한 오차로 정량적이 수위의 정합성에는 한계가 존재하였지만, 수위의 정량적인 변동성을 확인할 수 있었으며, 수위 변화의 반응속도를 판별할 수 있었다.

  • PDF

A Novel Network Management Approach using Active Network Technology (액티브 네트워크 기술을 이용한 새로운 망관리 기법)

  • Lee, Byeong-Gi;Jo, Guk-Hyeon
    • Journal of KIISE:Information Networking
    • /
    • v.28 no.1
    • /
    • pp.102-116
    • /
    • 2001
  • 전통적인 망 관리 접근 방법은 중앙의 관리시스템이 예외적인 상황을 찾고자 관리되는 노드들을 반복적으로 폴링하면서 달성된다. 이러한 중앙집중적인 관리 패러다임은 관리되는 노드들의 수와 복잡도가 증가함에 따라 한계에 부딪히고 있다. 관리 시스템은 관리대상 정보들이 이전과 똑같은 상태를 유지함에 따라 많은 양의 중복된 정보로 폭주하게 된다. 이러하 수동적인 망 관리 방법은 확장이 불가능하고 트랙픽증가로 인해 많은 비용이 들기 때문에 더욱 신속한 접근 및 확장 능력을 가진 기술을 적용하는 것이 필수적이다. 액티브 네트워크 사용자에 의해 커스터마이즈된 응용이나 프로토콜들을 망 노드들에 동적으로 삽입할 수 있도록 함으로서 노드들이 새로운 사용자 요구나 서비스에 신속하게 대응할 수 있도록한다. 본논문에서는 이러한 액티브 네트워크 기술을 망 관리에 적용함으로서 관리 노드들이 관리 시스템으로부터의 수동적인 영역에서 벗어나 능동적으로 자신의 문제에 대처할 수 있고 또한 새로운 관리 요구사항들에 신속하게 대응할 수 있도록 하는 새로운 망 관리 접근 방법에 대해 기술한다.

  • PDF

Quantitative Damage Index of RC Columns with Non-seismic Details (비내진상세를 가지는 철근콘크리트 기둥의 정량적 손상도 평가 기준)

  • Kim, Kyung-Min;Oh, Sang-Hoon;Choi, Kwang-Yong;Lee, Jung-Han;Park, Byung-Cheol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.6
    • /
    • pp.11-20
    • /
    • 2013
  • In this paper, the quantitative damage index for reinforced concrete (RC) columns with non-seismic details were presented. They are necessary to carry out the postearthquake safety evaluation of RC buildings under 5 stories without seismic details. The static cyclic test of the RC frame sub-assemblage that was an one span and actual-sized was first conducted. The specimen collapsed by the shear failure after flexural yielding of a column, lots of cracks on the surfaces of columns and beam-column joints and the cover concrete splitting at the bottom of columns occurred. The damage levels of these kinds of columns with non-seismic details were classified to five based on the load-displacement relationship by the test result. The residual story drift ratios and crack widths were then adapted as the quantitative index to evaluate the damage limit states because those values were comparatively easy to measure right after earthquakes. The highest one among the residual story drift ratios under the similar maximum story drift ratio decided on the residual story drift ratio of each damage limit state. On the other hand, the lowest and average ones among the respective residual shear and flexural widths under the similar maximum story drift ratio decided on the residual shear and flexural widths of each damage limit state, respectively. These values for each damage limit state resulted in being smaller than those by the international damage evaluation guidelines that are for seismically designed members under the same deformations.

Hazard Analysis, Determination of Critical Control Points, and Establishment of Critical Limits for Seasoned Laver (조미김의 제조공정별 위해요소분석, 중요관리점 결정 및 한계기준 개발)

  • Kang, Min Jeong;Lee, Hak Tae;Kim, Jung Yun
    • Culinary science and hospitality research
    • /
    • v.21 no.2
    • /
    • pp.1-10
    • /
    • 2015
  • The purpose of this study was to establish the critical limit of CCP (Critical Control Point) of a HACCP (Hazard Analysis Critical Control Point) system used in the production of seasoned laver products. The hazard analysis examined microbial evaluations and developed a HACCP management plan for the heating process. The results were determined to be capable of reducing the biological element of CCP via the secondary roasting process. This study examined general bacteria and pathogenic microorganisms such as Escherichia coli, Staphylococcus aureus, Salmonella spp., Listeria monocytogenes, Vibrio parahaemolyticus, and Bacillus cereus at temperatures ranging from $170^{\circ}C$ to $230^{\circ}C$ and for 3.0 to 5.5 seconds at a time. Before the secondary roasting process, pathogenic microorganisms were all negative, although the presence of general bacteria was still detected. General bacteria was reduced to $1.0{\times}10CFU/g$ after the temperature was set at $230^{\circ}C$ for a period of 5.5 seconds. In conclusion, it suggested that a HACCP plan was necessary for management standard and systematic approach in the establishment of critical limit, problem resolution, verification method, education, and records management through a secondary roasting process.

Design and Construction of SCADA System using Ajax (Ajax를 이용한 감시제어시스템 설계구축)

  • Lee, Jong-Gu
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2007.05a
    • /
    • pp.1502-1505
    • /
    • 2007
  • 인터넷 및 네트워크 환경의 비약적인 발전으로 기업체의 모든 기반 Application은 사용의 편리함과 시스템 및 데이터관리의 용이성 때문에 웹 기반모델로 변경되어 사용되고 있다. 그러나, 산업현장설비를 실시간 원격제어 감시하는 시스템인 SCADA(Supervisory Control and Data Acquisition)는 웹의 여러 한계성 때문에 아직까지 기존 Client-Server 모델로 대부분 활용되고 있다. 본 논문에서는 이러한 웹의 한계성 중 Client 시스템의 실시간 통신 방식 및 속도, 부하 등을 기존 Client-Server 방식과 동일한 성능을 갖도록 설계 구현하여 적용하고 성능을 평가 하였다.

  • PDF

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.