• Title/Summary/Keyword: 관리프로세스 비효율

Search Result 152, Processing Time 0.035 seconds

Development of the Program Management System for Mega Project in Urban Regeneration (도시재생사업의 메가프로젝트 건설관리시스템 개발)

  • Hyun, Chang-Teak;Kim, Ju-Hyung;Park, Il-Soo;Yu, Jung-Ho;Son, Bo-Sik;Hong, Tae-Hoon;Seo, Yong-Chil;Lee, Sang-Bum;Kim, Hyoung-Kwan;Kim, Chang-Wan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.176-183
    • /
    • 2008
  • Recently, several large-scale Mega-Projects are being conducted. For these urban revitalization projects which requires many complex functions, the existing project management system based on single project level is limited in application. Therefore, our main objectives of this research are two 1) Develop a brand-new program management system(Prototype Ver 1.0) for mega-projects where various facilities are combined both horizontally and vertically. 2) Develop management strategies(Prototype Ver 1.0) based on the program level that enable the comprehensive management of a multiple various projects. The subtitles of this Research are i-PMIS(Program Management Information System) Development, Standardization & Optimization of Construction Life-Cycle Process, Comprehensive Project Cost & Process Management Technology, Effective and Optimized Integrated Performance Management Technology, and, we suggest to optimize the whole life cycle process, predict and respond to various risks, predict and control the process, the cost and the schedule, achieve maximum return on investment to the participating parties, and provide a brand-new Program-MIS including the visual-based web-portal platform to respond the changing business environments and decision making.

  • PDF

Smart Glasses and Mobile Application Development for Automation of Construction Safety Management (건설 안전관리 업무의 자동화를 위한 애플리케이션 및 스마트 글래스 개발)

  • Choi, Hye-Rin;Kang, Hyun-Ku;Kim, Seong-Min;Lee, Min-Young;Choi, Tae-Hoon
    • Annual Conference of KIPS
    • /
    • 2022.11a
    • /
    • pp.830-832
    • /
    • 2022
  • 최근 산업 재해 중 업종별 사고 사망자 수가 1 위인 건설 산업에서 안전관리자는 실질적인 현장관리와 사고 예방의 핵심 인력으로 그 수요가 증가하고 있다. 안전 관리 활동 수준과 재해율은 높은 상관관계에 있음에도 불구하고 적은 인력 및 과도한 서류 작업으로 인해 직무 스트레스 및 생산성 저하에 큰 영향을 미치며 이는 현장 업무 효율성 저하 원인으로 꼽힌다. 특히 중소규모 건설사는 대형 건설사에 비해 안전 관리 활동 수준 차이 조사 항목에서 대부분의 항목에서 열악하며 통합관리시스템 또한 보유하지 않는 경우가 많아 문제가 대두되고 있다. 본 논문에서는 건설사 규모와 관계없이 이용 가능한 스마트글래스(SmartGlasses)와 애플리케이션(Application)으로 현장업무의 프로세스 자동화 구현 및 통합안전 관리 시스템을 제안하여 서류작업의 간소화, 직무 스트레스 감소, 건설 안전 관리자의 생산성 및 안전성의 혁신적 향상에 공헌한다.

Development & Operation of Integrated Technical Information System (통합기술정보시스템(ITIS)의 개발 및 운용)

  • Chung, Joon-Young;Lee, Joon-Woo;Kim, Cheon-Young;Lee, Sang-Bum
    • Annual Conference of KIPS
    • /
    • 2003.05b
    • /
    • pp.859-862
    • /
    • 2003
  • 지금까지의 기술자료관리는 수작업의 비효율성과 복잡한 절차로 인해 업무의 시간 손실을 발생시켜 왔다. 대용량 저장장치, 그래픽 디스플레이 및 네트워킹 같은 정보기술 진보는 효과적인 전자문서 처리를 가능하게 했다. 본 논문에서 기술하고자하는 XKO-1의 통합기술 정보시스템 모델은 방대한 문서 데이터베이스를 개발하고 XKO-1 항공기의 도면, 기술문서 및 비행시험 자료의 관리와 처리를 지원하기 위한 기술을 보여주기 위한 것이다. 또한 ITIS 프로그램은 워크플로우를 이용한 문서저장기능과 스캐너를 사용해서 문서를 디지탈화, 전자화, 색인화 및 압축화하여 데이터베이스에 저장할 뿐만 아니라, 프로세스에 따라 검색 및 분배된다.

  • PDF

Effective Corporate Electronic Record Management with KM Governance (KM 거버넌스 기반의 기업 전자기록물 관리 최적화 전략 연구)

  • Jeong, Ki-Ae;Nam, Young-Joon
    • Journal of Information Management
    • /
    • v.38 no.3
    • /
    • pp.161-181
    • /
    • 2007
  • Since 1990s, major corporations and public organizations have actively implemented their own knowledge management, by which they develop new businesses and enhance organizational efficiencies. However, their knowledge management processes are sometimes isolated or mismatched with their record management systems and reveal many problems to operate and maintain them effectively. This paper analyzes the current status and problems of corporate knowledge management. Next, it proposes the necessity and the methods to integrate knowledge management and records management in order to transform corporate records as useful knowledge resources. Aligning corporate record management strategies with knowledge management policies enables to improve the management of corporate electronic records. Especially, the implementation of record retention schedule based on the life cycle management of records is emphasized as a KM governance strategy and method to manage corporate records effectively.

Researching the planning and implementation of an IT service desk automation system with a focus on customers. (고객관점의 IT 서비스데스크 자동화 시스템의 설계와 구현에 관한 연구)

  • Park, Sung-Jin
    • Annual Conference of KIPS
    • /
    • 2007.11a
    • /
    • pp.395-398
    • /
    • 2007
  • 오늘날 기업에서의 IT 는 급격한 비즈니스 환경의 변화와 다양한 비즈니스 모델의 출현으로 인해 점점 더 복잡해지고 있고, 비즈니스의 IT 의존도 또한 지속적으로 증가하고 있다. 이러한 상황에서 기업의 정보시스템을 운영하는 IT 운영조직은 사용자에게 IT 서비스의 품질향상과 비즈니스의 연속성을 보장할 수 있는 지원체계를 필요로 하고 있다. 1990년대 후반에 들어서 ITIL 을 기반으로 한 ITSM 개념이 국내에 도입 되면서 기존의 콜센터와 헬프데스크를 통한 IT 서비스지원 방식을 서비스데스크로 통합하게 되었고, 서비스데스크 자동화 시스템의 도입을 통해 기업의 모든 비즈니스 조직의 IT 와 관련된 요구사항을 관리하고 있다. 하지만 이러한 서비스데스크 자동화 시스템은 IT 서비스 제공자 관점에서 구축되었고 운영방향 또한 어플리케이션, 서버, 네트워크 등 기술적인 구성요소의 성능 향상에만 초점을 두었기 때문에 현업 사용자들이 만족 할 수 있는 실질적인 수준의 서비스 개선은 이루어지지 못하고 있다. 이에 본 연구에서는 고객관점에서의 요구사항 분석을 통해, 운영조직의 IT 서비스 요청에 대한 처리활동을 단순처리와 일반처리로 분류하고 이를 자동화 시스템에 반영 하였고, 실제 A 사(社)의 IT 운영조직에 적용하여, 비효율적인 저부가가치 활동과 고부가 가치의 활동이 시스템을 통해 분류가 가능함을 보였다. 아울러 IT 운영조직의 활동을 정량적으로 관리 할 수 있도록 관리지표를 발굴하고 자동화 시스템의 서비스요청관리 프로세스에 적용하여 IT 서비스를 제공받는 회사의 관리조직과 경영층이 IT 운영조직의 활동을 정량적으로 관리하고 측정할 수 있는 IT 서비스데스크 자동화 시스템의 개선모델을 제시 하였다.

Integration of 3D Laser Scanner and BIM Process for Visualization of Building Defective Condition (3D 레이저 스캐닝과 BIM 연동을 통한 건축물 노후 상태 정보 시각화 프로세스)

  • Choi, Moonyoung;Kim, Sangyong;Kim, Seungho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.171-182
    • /
    • 2022
  • The regular assessment of a building is important to understand structural safety and latent risk in the early stages of building life cycle. However, methods of traditional assessment are subjective, atypical, labor-intensive, and time-consuming and as such the reliability of these results has been questioned. This study proposed a method to bring accurate results using a 3D laser scanner and integrate them in Building Information Modeling (BIM) to visualize defective condition. The specific process for this study was as follows: (1) semi-automated data acquisition using 3D laser scanner and python script, (2) scan-to-BIM process, (3) integrating and visualizing defective conditions data using dynamo. The method proposed in this study improved efficiency and productivity in a building assessment through omitting the additional process of measurement and documentation. The visualized 3D model allows building facility managers to make more effective decisions. Ultimately, this is expected to improve the efficiency of building maintenance works.

A Design and Implementation of Mobile Logistics Information System (모바일 물류정보시스템 설계 및 구현)

  • Lee, Won-Joo;Lee, Sang-Jun;Lim, Heon-Yong;Kim, Chang-Hyeon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.7
    • /
    • pp.139-146
    • /
    • 2012
  • In this paper, we implement an m-LIS(Mobile-Logistics Information System) for an effective logistics management in consideration of logistics process and work environment. The m-LIS could perform the entire business process every minute and promote the work efficiency by tying up with ERP and POS system. Moreover, this system could enhance the management level of service and supply chain. Due to the reason that the existing logistics business was not computerized and automated, most of operation was accomplished by means of workers experience and convention. This problem brought about both the ineffective management and logistics quality deterioration by weakening the control power of the logistics site. In order to solve this problem, we put focus on providing the real-time operation monitoring environment on the spot, the satisfaction of the efficiency on the spot, and the optimized system by building up the logistics information system. Furthermore, we attest that the new logistics system could properly cope with the increase of the quantity of goods transported owing to stable logistics information support and the market expansion and growth caused by the firm interface between the new ERP and its related system.

Analysis of the Importance from Detailed Work (Role) of the Construction Manager for G-SEED Certification in the Design Phase (녹색건축인증을 위한 설계단계 건설사업관리자의 세부 업무(역할)별 중요도 분석)

  • Lee, Duhwan;Kang, Seongmi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.103-112
    • /
    • 2020
  • In this study, based on actual project implementation cases, task management plans for construction management related green building certification were derived in major stages. Accordingly, the importance from details of construction management tasks for the operation and management process of the schematic design phase, design development phase, and construction document phase, focusing on G-SEED certification, was analyzed. In addition, major items were derived based on the weight of additional construction costs and acquisition scores through previous research cases on the analysis of construction costs for G-SEED certification, and the importance from details of construction management tasks on the major items of G-SEED certification was analyzed. As a result, the review and confirmation of the elements of reflection related to G-SEED in the schematic design phase, the adequacy of design documents and the connectivity of design phase in the design development phase were important. And the review and confirmation of the items directly related to the construction phase in the construction document phase were important.

A Study of Risk Analysis on Apartment Reconstruction Projects (공동주택 재건축사업의 리스크 분석에 관한 연구)

  • Lee Lo-Na;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.232-235
    • /
    • 2004
  • The apartment reconstruction project is making some problems, such as delay of lack specialty, conflict between project owners and cost increasing etc. The enforcement process of project are very complicated, the term of project is long and too many project owners are participating. For this reasons. it is always in the face of uncertainty. To promote the reconstructing project successfully. we need to make risk management process to get rid of uncertain factors which occur in forwarding the reconstructing project This study has for its objects. First, suggest the best way of risk analysis to manage risk factors systematically and efficiently recognized in The Apartment reconstruction protect. Second, furnish basic data to build the risk managing system of The apartment reconstructing project.

  • PDF

Visualizing Construction Process Linking Process Simulation (프로세스 시뮬레이션을 연계한 건설공정 시각화)

  • Kim, Yeong-Hwan;Jung, Pyung-Ki;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.73-79
    • /
    • 2006
  • Even though graphical simulation is very useful for construction planning, the application of graphical simulation has a limitation in dealing with objects without fixed form like earthmoving process. In this case, the mathematical/statistical simulation about the productivity of the whole processes based on the numerical data of working time, waiting time and working capacity of using equipment becomes effective. The mathematical/statistical simulation is not fully utilized in the field of construction due to the difficulties of creating process models and securing trust the numerically expressed results of simulation. In this research, the output of discrete-event simulation programs which are the most common mathematical/statistical simulation tool for construction processes were analyzed for the purpose of earthmoving process visualization. The purpose of this research is to develop a graphical simulation system that can help the construction planner select most suitable equipment and construction methods through the visualize the numerical simulation results of the working time, the queuing time as well as the amount resources etc.