• Title/Summary/Keyword: 관리업무체계

Search Result 1,433, Processing Time 0.032 seconds

Comprehensive Crisis Management System of Operational Continuity Management (운영연속성관리(OCM)관점에서 위기관리통합시스템 구축)

  • Kang, Heau-Jo
    • Journal of Advanced Navigation Technology
    • /
    • v.14 no.1
    • /
    • pp.127-133
    • /
    • 2010
  • The process for establishment of Operational Continuity Management Plan is organized repeatedly of Business Risk Assessment, Crisis Analysis, Business Impact Analysis, Establishing Business Recovery Strategies, Detailed Planning, Plan Execution, Test and Maintenance(Including Monitoring). Therefore, in this paper in response to global environmental change and the construction and operation of social security systems to maximize operational continuity management, crisis management and crisis management systems, building integrated systems for building technology in general and operational continuity management within an organization to understand developed to provide a framework for implementing operational continuity management in terms of crisis management has proposed to build an integrated system.

A Study on the Telecommunications Management Network for Power Utility (전력통신망 통합 관리방안 연구)

  • Park, Myung-Hye;Yoon, Jun-Cheol;Hyun, Duck-Hwa;Kim, Won-Tae
    • Proceedings of the KIEE Conference
    • /
    • 2004.07d
    • /
    • pp.2571-2573
    • /
    • 2004
  • 기존 망관리구조와 달리 차세대 망관리에서 요구되는 새로운 개념으로는 QoS관리, 망관리 분산화가 고려된다. 이에 핵심적 차세대 망관리구조의 핵심요소는 SLM(Service Level Management), TMN(Telecommunication Management Network)이다. 선진국을 중심으로 TMN 관리표준 업무처리 절차를 수립하여 이를 시스템화하여 솔루션으로 공급하고 있으나, 국내실정에 적합하지 않으며, 특히 전력분야에 적합한 전력통신망 통합관리를 위한 체계적인 표준 업무처리전차에 대한 개발이 필요한 실정이다. 전력 산업분야의 전력통신망 통합관리를 위한 표준절차의 부재로 기존 투자된 시스템의 효율성을 향상함에 있어 어려움을 가지고 있을 뿐 아니라 향후에 확장 도입되는 Management 솔루션에 있어서 불필요한 중복투자 가능성이 상존하고 있으므로 체계적이며 표준화돤 관리체계의 개발이 필요하다. 본 논문에서는 전력통신 설비별로 운용중인 다수의 NMS 통합 및 유지관리용 전산설비와의 유기적인 결합을 통한 최적의 전력통신 망 종합관리체계 구축방안을 제시하기 위해 전력연구원에서 수행하고 있는 연구과제와 관련하여 차세대 전력통신망 관리방안에 대해 기술하였다.

  • PDF

Procedural Model of XML Schema Framework for Digitalizing Disaster Information Management for Construction Facility (시설물 재해정보관리 전자화를 위한 XML스키마 구축 방법의 절차적 모형 구성)

  • Kang, Leen-Seok;Park, Seo-Young;Moon, Hyoun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.56-64
    • /
    • 2006
  • The current disaster management manual is being utilized as a book or document-based type. It causes a low applicability and interoperability in practical business because each information has a different document format and it is difficult to recycle those information as common disaster information. The information reading by text type without electronic data and visual object also has a limitations in guaranteeing a quickness of disaster management business. Accordingly, the electronic document management system with visual information is necessary and the system needs to tie framed by XML schema because the electronic document standard will be changed from DTD to XML schema. This study attempts to develop a procedural methodology of an electronic document management system based on XML for disaster management. The applicability of the proposed results is verified by the simulated scenario.

The study on the functions for design and development of Public institutions Disaster mitigation management and support system (공공기관 재해경감활동관리체계 구축 지원프로그램 설계 및 개발을 위한 필요기능 연구)

  • Kim, Minji;Kim, Doyeon;Lee, Miseon
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.32-39
    • /
    • 2016
  • We analyze BCM, COOP and other exotic advanced cases for making supporting programs relates with Disaster mitigation management in Public area. The outcome from this study explains what are requirements for proper activating the programs and what we need. In conclusion, we could understand importances of BIA, RA, Disaster mitigation activities, Contingency plan, Training, Correspond to disaster, Management of document except for system managing functions. It will be helpful to build supporting programs by meeting most of requirements of BCM at the same time.

The Development of Business Information System based on BPS for Urban Regeneration Projects (BPS기반의 도시재생사업 업무정보 시스템 구축)

  • Kim, Il-Woo;Seo, Jae-Pil;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.3-13
    • /
    • 2012
  • Urban area has caused decline of commercial function and infrastructure because of unorganized urban development, and urban regeneration projects have appeared since 2000s in order to solve urban problems. Because urban regeneration projects have a complexation of various use, the complicated business process and unsystematic conduction work, project stakeholders are suffering from problem in conducting project. Therefore, this study suggested the necessity of business system for urban regeneration projects with analyzing situations and stakeholders. Also, this study classified business information through development of BPS in order to make information system of business process in the urban regeneration project and evaluated it after realization for information system based on BPS of urban regeneration projects. Project stakeholders will be systematically provided information about urban regeneration projects through this system and it is expected to accomplish urban regeneration projects effectively.

A Study on the Use of Parcel Identification Number in Developing the Korean Land Information System (한국형 토지정보체계 구축에 있어서 지번의 효과적 관한 연구)

  • 이규석;황국웅
    • Spatial Information Research
    • /
    • v.2 no.1
    • /
    • pp.85-92
    • /
    • 1994
  • This study examines the unique characteristics of the parcel identification number especially in developing the Korean land information system(KLIS). There are several limitations in establishing KLIS in terms of the location identification. Therefore, it is necessary to develop the appropriate parcel identification number system in Korea including the road identification systym and the three dimensional parcel identification system. The exact parcel bounary also needs accurate surveying and registration.

  • PDF

Development of Performance Evaluation System for Plant Management Appling BSC Concept (BSC를 이용한 설비관리 업무의 성과평가시스템 개발)

  • Kim, Kwang-Man
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.2
    • /
    • pp.231-239
    • /
    • 2012
  • A company's reliance on plants is growing in the area of production and service. Therefore, the importance of the work on plants in order to manage them efficiently is growing. Effective plant management increases the durability and efficiency of the plant. An organized BSC also increases the workers' will to work harder which is to bring the higher quality of plant management. In this way, however, it has studied with variety ways to assess plant management task for performance evaluation, there is a little deficiency that the study of methodical performance evaluation that based on the some strategies. The BSC, the very way, and it has been utilized in balanced and methodical performance evaluation means in widespread fields with strategy as the center to get visions. In this study, I have developed the performance evaluation system for plant management, appling BSC concept.

A study of a plan for better construction process of pre-construction phase in general contractor (종합건설회사내 Pre-construction 단계에서의 업무흐름개선에 관한연구)

  • Park Jang-Seob;Song Jong-Seok;Shin Soo-Am;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.481-484
    • /
    • 2003
  • Recently, the importance of Pre-construction is gradually increasing in construction business. In addition to increasing greatness, Pre-construction affect to success or failure of projects. However, current domestic construction business doesn't constitute exact concepts and systems, and there are a lot of problems such as disorganize management of construction because most of Pre-construction depends on supervisors' experiences. Therefore, according as doing this study, We are going to analyze the tendency of Pre-construction step and bring up designed operation systems between departments in construction company. So we can expect to develop efficiency by excluding unnecessary operation and formulating more improved operation process.

  • PDF

인천국제공항철도 건설사업관리 수행체계

  • Yoon Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.13-18
    • /
    • 2003
  • 국내 건설프로젝트의 대부분은 설계, 시공, 운영이 별도의 체계로 운영이 되이온 경향이 많은 바, 이를 개선하기 위해선, 기획단계에서 운영단계에 이르는 건설생애주기 단계별로 수행업무절차를 체계적으로 정립하여야 한다. 본 고에서는 이를 위하여 인천국제공항철도사업을 모델로 바람직한 대형공사에서의 사업관리 수행체계에 대하여 알아보았다.

  • PDF

A Study on the Database Design using Software Requirement Analysis (소프트웨어 요구사항을 이용한 데이터베이스 설계 사례에 관한 연구)

  • Park, Dae-Yu;Lee, Sang-Hoon;Kim, Eung-Gon;Yeom, Choong-Sub
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.05a
    • /
    • pp.277-281
    • /
    • 2006
  • 본 연구는 중수로형(CANDU) 원자력발전소의 노심 관리(Nuclear Reactor Core Management) 업무 자동화를 위한 소프트웨어 시스템 개발 사례이다. 중수로형(CANDU) 원자력 발전소의 노심관리 업무자동화 통합시스템을 개발하기 위해서는 현업에서 사용되고 있는 공학적 계산 인자들과 그 결과를 체계적으로 관리하기 위한 데이터베이스의 구축이 우선되어야 한다. 이에 본 연구에서는 원자력발전소의 노심관리 업무에 대해 현업 업무 분석을 통해 사용자의 요구사항을 정확히 분석하고 이를 토대로 업무를 효과적이며 체계적으로 정의한 데이터베이스를 구축하기 위해 IEEE 830 템플릿 중 소프트웨어 요구사항 분석 방법을 적용하여 현업 프로세스별 입, 출력 사양을 분석하고 각 항목간의 관계를 정의하여 요구사항 분석 단계에서 데이터베이스 설계요소를 효과적으로 도출하기 위한 연구 사례를 소개한다.

  • PDF