Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

An Analysis of Critical Management Factors for Construction Failure on the Apartment Structural Framework using FMEA (FMEA 기법을 활용한 공동주택 골조공사의 건설실패 핵심관리요인 분석)

  • Oh, Chi-Don;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.78-88
    • /
    • 2012
  • Previous construction failure researches were focused on the utilization plan based on failure information and development of failure classification. However, it has limitation to set up the plan for prevention of construction failure due to the lack of the number of on-site staffs. In order to prevent effectively construction failure, a prevention plan should be established through quantitative evaluation of failure causes. The purpose of this study is to suggest the assessment method for selection Critical Management Factor(CMF) and to analyze the CMF on the apartment structural framework using FMEA(Failure Mode and Effective Analysis) which is one of the methods of quantitative evaluation. The element of risk evaluation separated degree of failure risk and prevention respectively. The assessment method for selection of CMF can be utilized for planning proactive solutions on the failure, and it can be also selected critical factors about each project phases, type of facility and construction work.

The Implementation of Web-based Defect Information Feed-Back System for Construction Management in the Construction Process -Focused on Apartment Houses- (시공단계의 효율적 공사관리를 위한 Web기반 하자정보 Feed-Back시스템 구현방안 - 공동주택을 중심으로 -)

  • Cho Yong-Min;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.482-485
    • /
    • 2002
  • The boom of housing market lead to build a lot of apartment houses concentrated on the metropolitan area and developing new city in 1980's made 2,000,000 houses. In this time, quality standards could not be satisfied with consumers' desire due to the policy about excessive supply and come from unexpected defects in the complected buildings. In $1980's\~1990's$, It would be performed on the study for defect prevention in apartment houses. It has contributed in no way to the reduction at the rate of the defect outbreak and the solution of consumers' dissatisfaction by flaws. The reason is that the study related defects is not linked and applied by the managing and controlling system, Therefore, the study will be analyzed out defect information occurred on apartment houses of domestic construction and classified by type features. As a result, it will suggest web-based feed-back system for getting systematic information and the practical use.

  • PDF

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

A Study on the Process management Methodology of Spatial Database Standard Construction (공간데이터 표준구축공정의 관리방법론 연구)

  • Choi, Byoung-Gil;No, Young-Woo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.3
    • /
    • pp.331-345
    • /
    • 2009
  • This study aims to standardize the work classification system in spatial data. Up to now, a systematic standard for constructing process and quality management has not yet been established in Korea, thus, it is possible for the national budget to be wasted. The regulations related to constructing spatial data are also obscure, and absurd for feasible application to reality, which results in a lack of reliability of the quality of spatial data. This study was conducted by investigating and analyzing regulations related to spatial data quality and various literature, including studies on spatial data quality conducted by the NGII. And also, the study was conducted by investigating and analyzing the constructing processes and working methods of major firms that have experience in constructing a GIS for a local governing body. Based on the analyzed data, we standardized work classification and management methodology for control point surveying using GPS, leveling, aerial photographing, digital mapping, topographic mapping, digital elevation modeling, aerial photographic DB construction, digital orthophotomap.

A Competitive Core Technology Proposal for a Remodeling Project (경쟁력 있는 리모델링 공사를 위한 요소기술 도출)

  • Han, Ju-Yeoun;Kim, Ki-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.785-789
    • /
    • 2008
  • As people pays more attention to remodeling as a method to effectively improve, maintain, and manage building properties, it is important to ensure the economic feasibility of remodeling compared to reconstruction, instead of focusing on systematic regulations. In order to identify core technologies, the study set criteria to survey cost of a remodeling project by analyzing current status of remodeling projects. Based on the criteria, the study calculated average construction cost for five remodeling projects that were conducted recently, compared the cost with new construction projects, and examined major level works that are essential in a remodeling project. Based on the major level works, the study conducted interviews with construction experts to draw core technologies in design, structure and construction of a remodeling project.

  • PDF

Assessment of Defect Risks in Apartment Projects based on the Defect Classification Framework (효율적인 품질관리를 위한 공동주택 하자위험 분석)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.510-519
    • /
    • 2019
  • The aim of this study was to set a defect classification framework and evaluate the defect risks in apartment buildings For this, approximately 15,056 defect items for 133 apartment buildings were examined. As a result of the analysis, the major defect of the RC work was cracks, which were found mainly in public locations. Moreover, the RC work was found to exhibit a high defect risk of water problem and surface appearance, which are highly connected with cracks. Second, the finish work has a high defect risk because it is composed of various work types, and there are many kinds of materials and construction parts involved. Third, the major defects of the waterproof work were incorrect installation and missing tasks, which have high defect risks in the garage. This is because defects that require rework occur mainly in the underground garage. Based on these results, this study proposed countermeasures for defect risk management to be considered in the construction, handover, post-handover, and occupancy phases. These have been set in detail based on the three zones: low frequency high severity (LFHS), low frequency low severity (LFLS), and high frequency low severity (HFLS).

Life Cycle Assessments and Effect Factors in the Planning Stage of Steel Bridge (강교량의 기획단계에서의 환경부하 평가 및 영향요인에 관한 연구)

  • Jeon, Min Yeong;Kyung, Kab Soo;Lee, Sung Jin;Ryu, Seong Jin
    • Journal of Korean Society of Steel Construction
    • /
    • v.28 no.1
    • /
    • pp.13-22
    • /
    • 2016
  • Recently, interest for environmental pollution in various fields is on the increase, and the researches on the life cycle assessment of environmental performance assessment method for calculating the environmental loads are currently most performed. It is expected to have a significant influence on the environment, since SOC infrastructures are go through a variety of materials, manufacturing process, however it is judged that researches and measures for environmental pollution is insufficient. In this study, we build the data for 204 of steel bridge designed after 2000 year, and the 100 of bridge which were selected to from obtained results were calculated the environmental loads at the planning stage based on the life cycle assessment. In addition, standard classification systems in work type for steel bridges were established. Based on this, the basic design data and input materials for the bridges are applied to the LCI DB, and the environmental load for required material is evaluated and is shown as Eco-point. Environmental loads obtained from this study, it is judged that can be utilized as a basic data for the process of the life cycle assessment in future steel bridge design.