• Title/Summary/Keyword: 공정 및 일정 계획

Search Result 91, Processing Time 0.025 seconds

An Algorithm Design and Information System Development for Production Scheduling under Make-to-Order Environments (수주생산환경에서 생산일정계획 알고리듬 설계 및 정보 시스템 구현: 변압기 제조공정의 권선공정 적용사례)

  • Park, Chang-Kwon;Jang, Gil-Sang;Lee, Dong-Hyun
    • IE interfaces
    • /
    • v.16 no.2
    • /
    • pp.185-194
    • /
    • 2003
  • This paper deals with a realistic production scheduling under a make-to-order production environment. The practical case is studied on the transformer winding process in the 'H' company. The transformer winding is a process that rolls a coil that is coated with an electric insulation material in order to generate the required voltage using the voltage fluctuation. This process occupies an important position among the production processes in the transformer manufacturing company. And this process is composed of parallel machines with different performances according to the voltage capacity and winding type. In this paper, we propose a practical heuristic algorithm for production scheduling to satisfy the customer’s due date under a make-to-order production environment. Also, we implement the production scheduling system based on the proposed heuristic algorithm. Consequently, the proposed heuristic algorithm and the implemented production scheduling system are currently working in the transformer production factory of the ‘H’ company.

Unit Process Scheduling System Development and Calculation and Control Method of Planned Leadtime Using Multiple Linear Regression under Make to Order Manufacturing System in Transformer Winding Process (변압기 권선공정에서의 수주 제작품의 단위공정 일정관리 시스템 개발과 다중회귀분석을 이용한 계획 리드타임 산출 및 관리 방안)

  • Kang, Dae-Wan;Kang, Chang-Wook;Kang, Hae-Woon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.3
    • /
    • pp.117-124
    • /
    • 2008
  • Ultra-high voltage transformer industry has characteristic of small quantity batch production system by other order processing unlike general mass production systems. In this industry, observance of time deadline is very important in market competitive power security and company continued existence. The transformer winding is a process that rolls a coil is coated with an electric insulation material in order to generate the required voltage using the voltage fluctuation. The winding process is very important production process in the extra-high voltage transformer manufacturing industry because winding process is core process that occupy weight about half of whole process and is process that decide current ratio of transformer. This paper proposes a statistical calculation and control method of planned leadtime on the basis of real data and informations for the A company in transformer winding process. Moreover, we develop unit process scheduling system.

Applications of Mathematical Optimization Method for Chemical Industries (화학 산업에서 수학적 최적화 기법을 적용한 사례)

  • Kim, Eun-Yong;Heo, Soon-Ki;Lee, Kyu-Hwang;Lee, Hokyung
    • Korean Chemical Engineering Research
    • /
    • v.58 no.2
    • /
    • pp.209-223
    • /
    • 2020
  • Executions of SCM in a chemical company of which divisions produce petrochemicals, compounds, batteries, IT material and medicine directly affect their own profit. Execution level of SCM or optimization is very important. This work presents activities of SCM and optimization of inefficient issues in several industrial divisions using mathematical optimization method. The meaning is not only academic research but also making a useful tool which active partner deals with in his work. It is explained how to do beforehand and afterward optimization problem. The benefits are mentioned in the sections. The first of examples would be cover supply plan optimization, optimal profit business plan, and scheduling of a stretching process of polarizer based on minimizing raw material loss in polarizer production. The second example would be cover the optimization of production/packaging plans to maximize productivity of Poly Olefin processes, and the third example is minimization of transition loss in the production of battery electrodes. The fourth example would be cover scheduling of vessel approaching to berth. Because transportation of large portion of raw material and products of petrochemical industry is dealt with vessel, scheduling of vessel approaching to berth is important at the shore of large difference of tide. The final example would be scheduling problem to minimization of change over time of ABS semi products.

Fabrication of PCL Scaffolds According to Various Pore Patterns Using Polymer Deposition System and Design of Experiments (폴리머 적층 시스템과 실험계획법을 이용한 다양한 공극 패턴에 따른 PCL 인공지지체의 제작 연구)

  • Sa, Min-Woo;Choi, Sun-Woong;Lee, Jae-Wook;Kim, Jong Young
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.41 no.7
    • /
    • pp.645-653
    • /
    • 2017
  • In bone tissue engineering, polycaprolactone (PCL) is one of the most widely used biomaterials in the manufacturing of scaffolds as a synthetic polymer having biodegradability and biocompatibility. The strut width in the fabrication of scaffolds is an important part of tissue regeneration in in-vitro and in-vivo experiments, because it affects not only the pore size but also the porosity. In this study, we used polymer deposition system (PDS) and design of experiments (DOE) to explore the optimal process conditions to achieve a systematic and efficient scaffold manufacturing process, using temperature, pressure, scan velocity, and nozzle tip height as the parameters for the experiments. The aim of this research was to fabricate a 3D PCL scaffold having a uniform strut width of $150{\mu}m$ using DOE; it was proved that the strut width was constant in all the experimental groups by fabricating the PCL scaffolds according to various pore patterns as well as one pore pattern.

Study on Risk-based Satellite Product Assurance and Tailoring (리스크 기반의 위성 제품보증 및 테일러링 분석)

  • Song, Sua;Chang, Young-Keun
    • Journal of Aerospace System Engineering
    • /
    • v.12 no.5
    • /
    • pp.76-88
    • /
    • 2018
  • Space agencies such as NASA, ESA, and the US military provide guidelines and standards for PA(product assurance) requirements and plans. In recent years, major satellite manufacturers around the world have been mitigating PA requirements and processes by tailoring. PA tailoring has been implemented to improve the cost and schedule efficiency. PA tailoring can be accomplished based on various factors such as mission, classification of mission risk, complexity, development cost, life cycle, etc. In this study, PA tasks according to the mission risk classification proposed by NASA are investigated, and the tailoring method is suggested for the optimization of the development cost and schedule. In particular, the classification of mission risk for the satellites under development or operation in Korea is performed, and PA characteristics in accordance with mission risk are analyzed.

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection Based on the Initial Hull Structural Model (초기 신체 구조 모델을 기반으로 한 신체 블록의 물량 정보 생성 및 블록 탑재 시물레이션)

  • Roh, Myung-Il;Lee, Kyu-Yeul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.1 s.145
    • /
    • pp.103-118
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed using 2D drawings, based on the data of parent ships, and subjective intuition from past experience. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection based on the initial hull structural model(3D CAD model), were developed in this study. Here, the initial hull' structural model was generated from the initial hull structural CAD system early developed by us. To evaluate the developed methods. these methods were applied to corresponding processes of a deadweight 300,OOOton VLCC. As a result. it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

A Study on the Characteristics of the Seasonal Travel Path of Individual Chinese Travellers in Korea (중국 개인 여행객의 계절별 한국 여행경로 특성분석)

  • Wang, Chun-Yan;Jang, Phil-Sik;Kim, Hyung-Ho
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.7
    • /
    • pp.23-31
    • /
    • 2019
  • In this study, we collected data through online travel notes from January to December 2018 and analyzed the seasonal travel characteristics of individual visiting Chinese by utilizing social network analysis. The analysis showed that Seoul is a hub for Chinese travel to Korea and the main destinations for individual visiting Chinese are concentrated in Seoul, Busan, Jeju Island, Gyeongju and Gangneung, with wide differences in seasons. The research results can be used as basic data for the development of tourism courses for individual Chinese tourists to Korea, provision of tourism services and optimization of tourism facility layout. Future research can consider continuing to use network travel notes to study the tourist destination and the mode of transportation between tourist nodes, which can provide reference for the development of tourist market and the planning and design of tourist traffic.

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

Cost Analysis of the Recent Projects for Overseas Vanadium Metallurgical Processing Plants (해외 바나듐 제련 플랜트 관련 사업 비용 분석)

  • Gyuri Kim;Sang-hun Lee
    • Resources Recycling
    • /
    • v.33 no.3
    • /
    • pp.3-11
    • /
    • 2024
  • This study addressed the cost structure of metallurgical plants for vanadium recovery or production, which were previously planned or implemented. Vanadium metallurgy consists of several sub-processes such as such as pretreatment, roasting, leaching, precipitation, and filtration, in order to finally produce vanadium pentoxide. Here, lots of costs should be spent for such plants, in which these costs are largely divided into CAPEX (Capital Expenditure) and OPEX (Operational Expenditure). As a result, the capacities (feed input rates) and vanadium contents are various along the target projects for this study. However, final production rates and grades of vanadium pentoxide showed relatively small differences. In addition, a noticeable correlation is found between capacities and specific operating costs, in that a steadily decreasing trend is described with a non-linear curve with around -0.3 power. Therefore, for the plant capacity below 100,000 tons per year, the specific operating cost rapidly decreases as the capacity increases, whereas the cost remains relatively stable in the range of 0.6 to 1.2 million tons per year of the capacity. From a technical perspective, effective optimization of the metallurgical process plant can be achieved by improving vanadium recovery rate in the pre-treatment and/or roasting-leaching processes. Finally, the results of this study should be updated through future research with on-going field verification and further detailed cost analysis.