• 제목/요약/키워드: 공정 관리

Search Result 2,776, Processing Time 0.027 seconds

Scheduling Technique for Remodeling Project of Inhabited Condition (재실 리모델링 특성을 반영한 공정계획 기법)

  • Paik, Hwa-Sook;Nam, Wook-Jin;Kim, Sung-Han;Kim, Hyung-Jin;Choi, Jong-Soo;Kim, Kyung-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.141-149
    • /
    • 2013
  • This paper presents a scheduling technique that reflects various constraints in remodeling project of inhabited condition. The remodeling project of inhabited condition is required more detailed planning and control due to claims by noise, vibration, dust, smells, limited lift capacity, and limited temporary stock area. Because of the constraints, complexity in scheduling is increased and earlier completion is required to reduce the possibility of safety and environment accidents. Especially, in case of inhabited condition, the scheduling should be linked day-time/night-time/weekend work. This paper proposes a structured scheduling technique to incorporate those constraints in remodeling of inhabited condition. This scheduling technique considers not only remodeling process but also dismantling, newly-construction, and residents movement. Process expression method using MS-Project also presented to keep connectivity with existing scheduling system.

(A New Queue Management Algorithm Improving Fairness of the Internet Congestion Control) (인터넷 혼잡제어에서 공정성 향상을 위한 새로운 큐 관리 알고리즘)

  • 구자헌;최웅철;정광수
    • Journal of KIISE:Information Networking
    • /
    • v.30 no.3
    • /
    • pp.437-447
    • /
    • 2003
  • In order to reduce the increasing packet loss rates caused by an exponential increase in network traffic, the IETF(Internet Engineering Task Force) is considering the deployment of active queue management techniques such as RED(Random Early Detection) algorithm. However, RED algorithm simple but does not protect traffic from high-bandwidth flows, which include not only flows that fail to use end-to-end congestion control such as UDP flow, but also short round-trip time TCP flows. In this paper, in order to solve this problem, we propose a simple fairness queue management scheme, called AFQM(Approximate Fair Queue Management) algorithm, that discriminate against the flows which submit more packets/sec than is allowed by their fair share. By doing this, the scheme aims to approximate the fair queueing policy Since it is a small overhead and easy to implement, AFQM algorithm controls unresponsive or misbehaving flows with a minimum overhead.

A Study on the Actual Status of Heat Transfer oils in Industries for Process Safety Management (공정안전관리 사업장의 열매체유 사용실태에 관한 연구)

  • Lee, Keun Won;Lee, Joo Yeob
    • Journal of the Korean Institute of Gas
    • /
    • v.18 no.5
    • /
    • pp.33-39
    • /
    • 2014
  • Heat transfer oils are used in applications such as chemical plant heating systems, refinery heat exchange systems, certain gas processes, injection molding systems, and pulp and paper processing. These oils are extremely stable and resistant to thermal and oxidative degradation. In the event of a spill or accidental release of heat transfer oils, it can be ignited easily when there is an ignition source. This study discusses the status of safety management through the actual status of the heat transfer oils to prevent fire and explosion accidents in industries for process safety management. The actual status of the heat transfer oils in process system of industries surveyed by a questionnaire developed. The results of this study can be used to help establishment of safety management to prevent fire and explosion accidents, such as the management of heat transfer oils, safe operation and maintenance in heat transfer oil processes.

Predicting and Interpreting Quality of CMP Process for Semiconductor Wafers Using Machine Learning (머신러닝을 이용한 반도체 웨이퍼 평탄화 공정품질 예측 및 해석 모형 개발)

  • Ahn, Jeong-Eon;Jung, Jae-Yoon
    • The Journal of Bigdata
    • /
    • v.4 no.2
    • /
    • pp.61-71
    • /
    • 2019
  • Chemical Mechanical Planarization (CMP) process that planarizes semiconductor wafer's surface by polishing is difficult to manage reliably since it is under various chemicals and physical machinery. In CMP process, Material Removal Rate (MRR) is often used for a quality indicator, and it is important to predict MRR in managing CMP process stably. In this study, we introduce prediction models using machine learning techniques of analyzing time-series sensor data collected in CMP process, and the classification models that are used to interpret process quality conditions. In addition, we find meaningful variables affecting process quality and explain process variables' conditions to keep process quality high by analyzing classification result.

  • PDF

The Establishment of the Quality Management Method for Spatial Data Construction Process (공간데이터 제작과정의 품질관리방법 정립에 관한 연구)

  • Choi, Byoung-Gil;Cho, Kwang-Hee;Lee, Kwang-Won
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.3 s.33
    • /
    • pp.3-13
    • /
    • 2005
  • This study aims to establish the quality management method for spatial data construction process. Total 17 regulations related to spatial database construction and major aerial survey firms were analyzed in terms of working process, equipments, accuracy of results. It is standardized the process of making new digital maps using aerial photography, revising existing digital maps, producing digital elevation models and developing imagery maps. Quality checking factors for spatial data construction process are also established.

  • PDF

A process analysis system using Fuzzy reasoning networks for quality control of cutting (퍼지 추론 네트워크를 이용한 절삭 가공 공정의 춤질관리를 위한 공정 분석 시스템)

  • Hong, Jun-Hee;Sigeo, Ozono
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.12 no.6
    • /
    • pp.64-71
    • /
    • 1995
  • The objective of this paper is to realize an analysis system that is capable of controlling the quality of an entire cutting process by including a 3 coordinate measuring machine in the process line. Fuzzy reasoning networks based on fuzzy associative memories has been intro- duced in the measuring process, the control limits for the control process have been obtained, and the efficiency and reliability of the system have been determined by examining the simu- lated reasoning control values.

  • PDF

RC 공정의 핵물질 계랴을 위한 실시간 정보관리 시스템 설계

  • 김기준
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1998.10a
    • /
    • pp.855-859
    • /
    • 1998
  • 본 연구는 RC 공정을 대상으로 하여 핵물질 계량을 위한 실시간 정보관리 시스템 모형을 설계하였으며 개발기구는 PC상에서 C언어를 이용한 Nexpert Object를 이용하였다. 전문가 시스템을 이용한 계량관리 시스템은 다중 상속성을 갖는 규칙과 임의 객체를 포함한 객체들로써 Nexpert Object의 개발 환경에서 지식 기반이 설계되었다. 설계된 지식 기반은 Nexpert Object Protected Mode의 운영 환경에서 무한한 양의 정보관리가 신속 정확히 이루어질 수있었다.

The Program of progress control and quality control for the high-rise compound building (초고층 주상복합건물의 수장공사 공정관리 및 품질관리 방안)

  • Jung, Eul-Kyu;Lim, Chil-Soon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.111-117
    • /
    • 2003
  • Recently SAMWOO EMC received order and built interior walls which was used the day process in several high-rise compound buildings. On the way to build, this process was brought about several matter according to the progress and qualify control. So, this study is the improving way of the dry process from experiences on those constructions

포장과 법률 - '의약품 제조 및 품질관리에 관한 규정' 일부개정

  • (사)한국포장협회
    • The monthly packaging world
    • /
    • s.317
    • /
    • pp.100-111
    • /
    • 2019
  • 식품의약품안전처는 가입한 의약품실사상호협력기구(PIC/S)의 규정 변경 사항을 '의약품 제조 및 품질관리에 관한 규정'([별표13])에 반영해 국제 조화하기 위하여 '의약품 제조 및 품질관리에 관한 규정'을 일부개정한다고 밝혔다. 주요 내용은 ▲공정밸리데이션 방법의 선택적 적용, ▲규제의 합리적 개선, ▲포장공정 밸리데이션, 세척 밸리데이션 구체화 등 조문 정비 등이다. 다음에 '의약품 제조 및 품질관리에 관한 규정' 일부개정의 상세한 내용을 살펴보도록 한다.

  • PDF

A Study on Evaluation Method for Process Safety Measurement (공정 안전측정을 위한 평가기법 연구)

  • Yang Kwang-Mo;Yun Young-Do;Park Jae -Hyun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.45-49
    • /
    • 2005
  • 현대 산업사회의 제조업에서는 생산을 가장 중요시하고 있지만 안전에 관한 의식도 많은 관심의 대상이 되고 있다. 사고예방을 위한 지속적인 노력에 따라 사고 건수는 점차 줄어들고 있으나 치명적인 중대 산업사고는 오히려 증가하여 산업재해로 인한 사망자 수는 줄어들지 않고 있다. 이와 같은 상황에 따라 중대 산업사고를 예방하기 위한 수단으로 공정안전관리제도를 도입하여 시행하고자 하고 있다. 하지만 일반 제조업에서는 화공안전의 경우와 같은 공정안전을 측정하는 방법이 아직 미흡한 실정이다. 따라서 본 연구에서는 제조업의 공정을 안전에 대한 관점에서 분석하고 효율적으로 공정별로 측정하여 관리할 수 있는 기법을 제시하고자 한다. 제안되는 기법은 안전에 대한 항목은 기업의 관리자들을 통한 AHP 가중치를 결정하고 각 공정을 정규화된 행렬을 이용하여 제안하였다.

  • PDF