• Title/Summary/Keyword: 공정지연

Search Result 695, Processing Time 0.035 seconds

Time-delay process identification for pro-chlorine process control (후염소 공정제어의 시지연 공정식별)

  • Shin, Gang-Wook;Hong, Sung-Taek
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1747-1748
    • /
    • 2008
  • 정수처리시스템에서의 염소소독공정은 염소투입설비의 지연요소와 염소반응시간에 의한 지연요소 등으로 매우 큰 시지연특성을 갖는 대표적인 공정이다. 본 논문에서는 염소소독공정 중 후염소공정을 조사 분석하여 공정에 영향이 큰 파라메타를 선정하고 이를 통하여 각 파라메타간 상관관계를 분석함으로써, 시지연공정의 모델을 개발하였다.

  • PDF

A Delay Analysis based on the Comparison of the As-planned Schedule, As-built Schedule including All Delays and As-built Schedule absent Owner Delays (계획공정표, 모든 지연을 포함한 준공공정표, 발주자 지연을 제외한 준공공정표의 비교를 통한 공기지연분석)

  • Yun Chul-Sung;Chu Hae-Keum;Kim Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.426-429
    • /
    • 2003
  • In the construction process, there are many change orders differing to the initial contracts came from the social needs and environmental changes. Most of them will impact to the construction process so that its effects occur project delays. Time extension and liquidated damage in the construction process come from schedule delay whether it is excusable or not non-excusable by the owner. However, those become the delay claims if the owner and the contractor are not agreed on this situation. One of the most important thing on the delay claims is the calculation of delay. The purpose of this study is to present the method of the time delay calculation by comparison of As-Planned schedule, As-Built schedule including all delay and As-Built schedule absent owner delay.

  • PDF

A Output Link Service Algorithm from the Aspects of Delay and Bandwidth Normalization (지연-대역폭 정규화 관점에서의 출력링크 서비스 알고리즘)

  • Lee, Ju-Hyun;Hwang, Ho-Young;Min, Sang-Lyul
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2006.10d
    • /
    • pp.259-262
    • /
    • 2006
  • 라우터에서 세션간 출력링크 용량을 공정하게 분배하기 위해, Generalized Processor Sharing(GPS) 기반 공정큐잉 알고리즘들이 제안되었다. 이 알고리즘들은 대역폭 관점에서는 서버에 대기중인 각 세션들에게 공정한 서비스를 제공해 주지만, 지연 관점에서는 경계치 이하로 보장해 주는 서비스만 제공한다. 이로 인해 적은 양의 패킷을 생성하는 세션이라도 작은 지연으로 서비스 받고자 한다면, 큰 대역폭을 할당받아야 하는 문제가 발생한다. 이와 같이 지연과 대역폭이 결합됨으로 써 생기는 문제를 해결하고자 서비스커브 기반의 알고리즘이 제안되었지만, 이 알고리즘들은 서비스 지연과 대역폭간 제한된 분리밖에 지원하지 못한다. 본 논문에서는 서비스 지연과 대역폭을 분리하여 독립적으로 처리함으로 써, 각 세션에게 세션의 트래픽 특성에 맞게 서비스를 제공해 주는 지연-대역폭 정규화 모델을 제안한다. 이 모델은 서비스를 서비스 지연과 대역폭 측면에서 정의하고, 정의된 서비스를 서비스 가치(Value of Service: VoS)라는 개념을 통해 표현한다. 이 모델과 VoS개념을 이용하여 각 세션에게 지연-대역폭 관점에서 공정한 서비스를 제공하는 스케줄링 알고리즘을 제안한다. 이 알고리즘을 통해, 각 세션에게 지연-대역폭 관점에서 공정서비스, 전송률을 보장하는 서비스를 제공하려고 한다.

  • PDF

Delay Guaranteed Fair Queueing (DGFQ) in Multimedia Wireless Packet Networks (멀티미디어 무선 패킷망에서 지연시간을 보장하는 공정큐잉)

  • Yang, Hyunho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.7 no.5
    • /
    • pp.916-924
    • /
    • 2003
  • Fair queueing has been an important issue in the multimedia networks where resources are shared among nodes both wired and wireless. In most fair queuing algorithms, based on the generalized processor sharing(GPS), emphasizes fairness guarantee while overlooking bounded delay guarantee which is critical to support multimedia services in the networks. In this paper, we propose a new fair queueing scheme, delay guaranteed fair queueing (DGFQ), which guaranteeing bounded delay of flows according to their individual delay requirements for multimedia services in the wireless packet networks.

Design of Disturbance Observer-Based Robust Controller for a Integrating Process System with Time-Delay (시간 지연을 갖는 적분 공정 시스템에 대한 외란 관측기 기반 강인 제어기 설계)

  • Jeong, Goo-Jong;Son, Young-Ik
    • Proceedings of the KIEE Conference
    • /
    • 2008.10b
    • /
    • pp.81-82
    • /
    • 2008
  • 제어대상 시스템에 시간지연과 외란이 동시에 존재하는 경우, 스미스 예측기와 외란 관측기를 함께 사용하면 시간지연과 외란으로 인한 시스템의 성능저하를 완화할 수 있다. 또한 유동적인 시간지연에 대비하여 시간지연을 갖는 2차 시스템 모델링 기법으로 설계된 PID 제어기를 이용하면 시간지연에 대해 강인한 제어 시스템을 얻을 수 있다. 한편, 이전에 사용된 2차 시스템 모델링 기법의 적용범위가 한정되어 있어 이 방법은 적분 공정을 포함하는 시스템의 제어 문제에는 적용되지 못하였다. 본 논문에서는 적분공정을 포함하는 시스템에 적용될 수 있는 새로운 2차 시스템 모델링 기법의 PID 제어기를 통해 외란과 시간지연에 강인한 제어기 설계 기법을 제안한다. 모의실험을 통해 이전의 방법과 그 성능을 비교한다.

  • PDF

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

A Delay-Bandwidth Normalized Scheduling Model with Service Rate Guarantees (서비스율을 보장하는 지연시간-대역폭 정규화 스케줄링 모델)

  • Lee, Ju-Hyun;Hwang, Ho-Young;Lee, Chang-Gun;Min, Sang-Lyul
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.34 no.10
    • /
    • pp.529-538
    • /
    • 2007
  • Fair Queueing algorithms based on Generalized Processor Sharing (GPS) not only guarantee sessions with service rate and delay, but also provide sessions with instantaneous fair sharing. This fair sharing distributes server capacity to currently backlogged sessions in proportion to their weights without regard to the amount of service that the sessions received in the past. From a long-term perspective, the instantaneous fair sharing leads to a different quality of service in terms of delay and bandwidth to sessions with the same weight depending on their traffic pattern. To minimize such long-term unfairness, we propose a delay-bandwidth normalization model that defines the concept of value of service (VoS) from the aspect of both delay and bandwidth. A model and a packet-by-packet scheduling algorithm are proposed to realize the VoS concept. Performance comparisons between the proposed algorithm and algorithms based on fair queueing and service curve show that the proposed algorithm provides better long-term fairness among sessions and that is more adaptive to dynamic traffic characteristics without compromising its service rate and delay guarantees.

Identification of FOPDT Process Using the Real-Coded Genetic Algorithm (실수형 유전알고리즘을 이용한 FOPDT 공정식별)

  • Choi, Hong-Kyu;Shin, Gang-Wook
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.6
    • /
    • pp.55-62
    • /
    • 2004
  • Even though FOPDT(First-Order Plus Dead-Time) process is most widely applied in the industrial control field, it is difficult to figure out a in precise process model because of the long dead-time problem. Also, control performance may be deteriorated due to the mismatch problem of plant and model. Thus, the accuracy of process identification is the most important problem in FOPDT process control. In this paper, the proposed method using real-coded genetic algorithm outperforms the existing estimation methods that use step-test responses. The proposed strategy obtained useful result through a number of simulation examples.

Intrinsic Flux Inequality in Forward Osmosis (FO) and Pressure-Retarded Osmosis (PRO) Processes (수학적 귀납법을 이용한 정삼투 및 압력지연삼투 공정의 투과율 불균형 해석)

  • Kim, Albert S.;Lee, Seung-won
    • Membrane Journal
    • /
    • v.25 no.4
    • /
    • pp.367-372
    • /
    • 2015
  • In pressure-retarded osmosis (PRO) and forward osmosis (FO) processes, solvent (permeate) flux depends on which surface the draw solution faces. There are two operation modes. PRO mode indicates that the active layer faces the draw solution, and FO mode means that the porous substrate fronts the draw stream. It is often observed that the PRO mode produces higher flux than that of FO under the same operating conditions. The current work uses the method of proof by contradiction, and mathematically proves the intrinsic flux inequality between the two modes.